Public Meeting to Discuss Status of NRC Supplemental Inspection Per Inspection Procedure 95003 at Point Beach
ML032470838
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/04/2003
From: Anton Vegel
Division Reactor Projects III
To: Cayia A
Nuclear Management Co
References
Download: ML032470838 (5)


Text

September 4, 2003 Mr. Alfred Cayia Site Vice-President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

PUBLIC MEETING TO DISCUSS THE STATUS OF NRC SUPPLEMENTAL INSPECTION PER INSPECTION PROCEDURE 95003 AT POINT BEACH

Dear Mr. Cayia:

The refers to the public meeting held on August 27, 2003, in Manitowoc, Wisconsin, to discuss the status of the ongoing NRC 95003 supplemental inspection at the Point Beach Nuclear Plant.

At this meeting, the NRC stated that the Corrective Action Team (CAT) portion of the 95003 inspection has been completed and the results will be incorporated into the upcoming Engineering, Operations, and Maintenance Team (EOMT) portion of the 95003 inspection, which is scheduled to begin onsite activities on September 8. The onsite activities of the Emergency Preparedness Team (EPT) portion of the 95003 have also been completed and the results of those activities are being evaluated by the inspectors. The results of all three team portions of the 95003 inspection will be discussed at a public meeting tentatively scheduled for mid-October and will be documented in one inspection report.

Mr. Mano Nazar, you, and other members of the Point Beach senior management staff discussed the Point Beach Excellence Plan, the progress in the corrective action and emergency planning key focus areas, and the preparations of the station for the EOMT.

The handouts provided at the meeting by the NRC and by your staff and a listing of principal NRC and Nuclear Management Company attendees are attached as Enclosures 1, 2, and 3, respectively, to this letter.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and it enclosures will be available electronically for public inspection in the NRC Public Document room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

A. Cayia If you have any questions regarding this meeting, please contact me at (630) 829-9620.

Sincerely,

/RA/

Anton Vegel, Chief Branch 7 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosures:

1) NRC Handout
2) NMC Handout
3) List of Principal Attendees cc w/encl: R. Grigg, President and Chief Operating Officer, WEPCo J. Cowan, Executive Vice President Chief Nuclear Officer Licensing Manager D. Weaver, Nuclear Asset Manager J. Jensen, Plant Manager G. Arent, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel M. Nazar, Senior Vice President J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032470838.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME Mkunowski:dtp AVegel DATE 09/03/03 09/04/03 OFFICIAL RECORD COPY

A. Cayia ADAMS Distribution:

WDR DFT DWS RidsNrrDipmIipb GEG HBC PGK1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1

Enclosure 3 PUBLIC MEETING PRINCIPAL ATTENDEES August 27, 2003 Nuclear Management Company, LLC Mano Nazar Senior Vice-President, NMC Fred Cayia Site Vice-President, Point Beach Joe Jensen Plant Manager, Point Beach Dan Fadel Director of Engineering, Point Beach Gordon Arent Regulatory Affairs Manager, Point Beach NRC Steve Reynolds Acting Director, Division of Reactor Projects Tony Vegel Chief, Branch 7, Division of Reactor Projects, and Team Leader, 95003 Inspection Team Ken Riemer Chief, Plant Support Branch Tony McMurtray Senior Licensing Project Manager, Office of Nuclear Reactor Regulation Mike Kunowski Project Engineer, Assistant Team Leader, 95003 Inspection Team Laura Kozak Team Leader, Corrective Action Team Ryan Lantz Team Leader, Emergency Preparedness Team, Region IV Paul Krohn Senior Resident Inspector, Point Beach Mike Morris Resident Inspector, Point Beach