ML032461245

From kanterella
Jump to navigation Jump to search
Transmittal of EP-PS-244, Dose Assessment Staffer
ML032461245
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/25/2003
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Security and Incident Response
References
28401 EP-PS-244
Download: ML032461245 (4)


Text

Aug. 25, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-38387 USER INFORMATION:

Name:GERLACH*ROSE M EMPL#:28401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 08/25/2003 LOCATION:

DOCUMENT CONTROL DESK FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

244 -

244 -

DOSE ASSESSMENT STAFFER REMOVE MANUAL TABLE OF CONTENTS DATE: 07/02/2003 ADD MANUAL TABLE OF CONTENTS DATE: 08/22/2003 CATEGORY: PROCEDURES TYPE: EP ID:

EP-PS-244 ADD: PCAF 2003-1606 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

.j045

PROCEDUIE CHANGE PROCESS FORM -

1. PCAF NO.
12. PAGE 1 OF 3
3. PROC. NO.

EP-PS-244 REV. 7

4.

FORMS REVISED-R_

R R

R R

5. PROCEDURE TITLE Radi6logical Liaison: Emergency Plan Position Specific Instruction
6. REQUESTED CHANGE PERIODIC REVIEW NO E

YES INCORPORATE PCAFS 3 NO a

YES #

it _

REVISION El PCAF 3

DELETION f

(CHECK ONE ONLY)

7.

SUMMARY

OF / REASON FOR CHANGE Adds a listing for Tab 19 to the list of supporting information. This is an administrative PCAF since the actual tab is already included in the procedure.

Continued E

8. DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4)

PORC REVIEW REQ'D?

s NO E

YES

9.

PORC MTG#

BLOCKS 11 THRU 16 ARE ON PAGE 2 OF FORM

17.

T.C. Dalpiaz I

3227 1 08/19/2003

18. COMMUNICATION OF CHANGE REQUIRED?

PREPARER ETN DATE 13NO n

YES (TYPE)

(Print or Type)

SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE I

A

/tl/ 6 a

s 8 H~f/DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.

CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED SPONSBE VISOR BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.

20.

Ax /(

7 FUM 'PFGVAL

21. RESPONSIBLE APPROVER ENTER NIA IF FUM HAS APPROVAL AUTHORITY INITIALS DATE FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)

PROCEDURE CHANGE PROCESS FORM -

1. PCAF NO.,c't,
12. PAGE 2 OF
13. PROC. NO.

EP-PS-244 REV. 7

11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either I la, b, c or d must be checked 'YES" and the appropriate form attached or referenced.
a. This change is an Administrative Correction for which 50.59 and 72.48 are not YES Z

N/A applicable.

b. This change is a change to any surveillance, maintenance or administrative YES 2

N/A procedure for which 50.59 and 72.48 are not applicable.

c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new YES Z

N/A 50.59/72.48 Evaluation is required.

Screen/Evaluation No.

d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72.48 2

YES 3

NIA Screen/Evaluation is attached.

12. This change is consistent with the FSAR or an FSAR change is required.

YES Change Request No.

13. Should this change be reviewed for potential effects on Training Needs or Material?

YES 3 NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN

14.

Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?

M YES Z

NO

15.

Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per YES Z

NO NDAP-QA-0320? (SICT/E form does not need to be attached.)

16.

Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.

REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS

OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER

.10 CFR 50.54Q Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)

Required for changes to Section XI Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Formn)

ci SUPPORTING INFORMATION:

Shift Takeover Ust MIDAS Field to Projection Measurement Projection Emergency Classification Intentionally Blank Placement of Field Teams PPL Emergency Personnel Dose Assessment and Protective Action Recommendation Guide MIDAS Operation Meteorological Data Acquisition SSES Environmental Sampling Strategy Environmental Team Briefing Sheet Public Protective Action Recommendation Guide Instructions for Obtaining Current Personnel Exposure Using NIMS TSC to EOF Radiological Dose Assessment Phone Log Dose Assessment Flowchart Intentionally Blank PICSY SPING Release Rates Guidelines Intentionally Blank Clarification of Responsibilities of Initial and Augmented Staff EP-PS-244 Revision 7

-Page 3 of 5 TAB:

TAB 1 TAB 2 TAB3 TAB 4 TAB 5 TAB 6 TAB 7 TAB 8 TAB 9 TAB 10 TAB 11 TAB 12 TAB 13 TAB 14 TAB 15 TAB 16 TAB 17 TAB 18 Tab 19 1 4;

Identification of release in progress