COMMENTS on the EXAM OUTLINE
\\r 1.
Page 3 of 27, Form ES-401-1 (SRO). There are two questions for 295037 SCRAM Condition.... Should choose another topic for second SRO only question. {Licensee agreed, problem arose when converting Rev.8 outline to Rev.9)
- 2.
Page 26 of 27, The SRO ONLY total has 7 generic topics which does not agree with the count which is I O plus 7 from the SRO ONLY outline. Problem with the ES form as used. (Le. had separate outline for the SRO and RO.
Page 2 of 8 should be identified as Form ES 301-1 Page 3 of 8 should be identified as Form ES 301-2 Page 6 of 8 should be identified as Form ES 301-1 Page 7 of 8 should be identified as Form ES 301-2 crs4.d 4&d/7,
- 3.
- 4.
Page 1 of I O. Event is either C or M but not both.
- 5.
Page 2 of IO. The numbers do not add up correctly. The form is similar to ES 301-5
- 6.
Scenario #I. It is not clear that there are operator actions for the one stuck control rod and the failed open BPV. This will be verified at the site during prep week.
- 7.
Scenario #2. I and N are the same event. Also R is one event verses two events.