ML032400055
| ML032400055 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 08/27/2003 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML032400053 | List: |
| References | |
| Download: ML032400055 (1) | |
Text
Watts Bar Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/27/2003 07:47:13 Report 22 2
EB2-ISI
- INSERVICE INSPECTION-U1 Baseline Inspections 09/29/2003 10/03/2003 Inservice Inspection Activities - PWR IP 7111108P 1
1 PS-RP
- OUTAGE ASSESMENT Baseline Inspections 10/06/2003 10/10/2003 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/06/2003 10/10/2003 ALARA Planning and Controls IP 7112102 1
1 2515/150
- TI 2515/150 REV1 Safety Issues 10/07/2003 10/10/2003 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 IP 2515/150 1
1 S/G-ISI
- S/G INSERVICE INSPECTION-U1 Baseline Inspections 10/20/2003 10/24/2003 Inservice Inspection Activities - PWR IP 7111108P 1
2 OL-EP
- EMERGENCY EXERCISE Baseline Inspections 11/05/2003 11/06/2003 Exercise Evaluation IP 7111401 1
Baseline Inspections 11/05/2003 11/06/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 11/05/2003 11/06/2003 Performance Indicator Verification IP 71151 1
1 PB6LAYUP - UNIT 2 SYSTEM LAYUP INSPECTION Other Routine 11/17/2003 11/21/2003 Review Of Quality Assurance For Extended Construction Delays IP 92050 1
1 EB2-MR
- MAINTENANCE RULE Baseline Inspections 12/08/2003 12/11/2003 Maintenance Effectiveness IP 7111112B 1
1 PB6-FP
- FLOOD PROTECTION Baseline Inspections 01/12/2004 01/16/2004 Flood Protection Measures IP 7111106 1
4 EB1FP
- TFP PRE-INSPECTION VISIT Baseline Inspections 03/01/2004 03/05/2004 Fire Protection IP 7111105T 1
4 EB1-FP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 03/22/2004 03/26/2004 Fire Protection IP 7111105T 1
Baseline Inspections 04/05/2004 04/09/2004 Fire Protection IP 7111105T 1
2 OL PREP
- INITIAL EXAM PREP Not Applicable 07/12/2004 07/16/2004 WATTS BAR/EXAMS AT POWER FACILITIES V23213 1
3 OL EXAM
- INITIAL EXAM Not Applicable 07/26/2004 07/30/2004 WATTS BAR/EXAMS AT POWER FACILITIES V23213 1
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 08/16/2004 08/20/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/16/2004 08/20/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 08/16/2004 08/20/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
Baseline Inspections 08/16/2004 08/20/2004 Radiological Environmental Monitoring Program IP 7112203 1
Baseline Inspections 08/16/2004 08/20/2004 Performance Indicator Verification IP 71151 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.