ML032390168

From kanterella
Jump to navigation Jump to search

Technical Specifications, Emergency Core Cooling System Accumulators
ML032390168
Person / Time
Site: Comanche Peak  
Issue date: 08/25/2003
From: Thadani M
NRC/NRR/DLPM/LPD4
To: Terry C
TXU Energy
Thadani M, NRR/DLPM, 415-1476
Shared Package
ML032380329 List:
References
TAC MB9536, TAC MB9537
Download: ML032390168 (1)


Text

Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO 3.5.1 Four ECCS accumulators shall be OPERABLE.

APPLICABILITY:

MODES land 2.

MODE 3 with RCS pressure > 1000 psig ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One accumulator A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable due to boron concentration to winthin concentration not within limits.

limits.

B. One accumulator B.1 Restore accumulator to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable for reasons OPERABLE status.

other than Condition A.

C. Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met.

C.2 Reduce RCS pressure to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 5 1000 psig.

(continued)

I COMANCHE PEAK - UNITS 1 AND 2 3.5-1 Amendment Nm64 106, 106