ML032380644
| ML032380644 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point (DPR-031, DPR-041) |
| Issue date: | 08/12/2003 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2003-205 | |
| Download: ML032380644 (3) | |
Text
FPL AU 1 2 23 L-2003-205 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yLrs, Terry {b. fines Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
s X~~~~~~~~~
an FPL Group company
A:
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-25 Turkey Point Unit 3 080412003 Linda Tudor (305) 246-6408 Reporting Period July, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
____l720 Maximum Dependable Capacity (MWe-Net) 693 Month
- 4.
4 4-No. of hours reactor was critical 744.0 No. of hours generator was on line (service hours) 744.0 4278.5 l 1
Unit reserve shutdown hours 0
0 1 Net Electrical Energy (MWH) 520187 2900680
- 128, UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
I N/A N/A N/A N/A N/A N/A
/A (1) Reason (2) Method A-Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain)
H -Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of July 2003.
.N DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50t251 Turkey Point Unit 4 08/04/03 Linda Tudor (305) 246-6408 Reporting Period July. 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month I-4-
No. of hours reactor was critical 744.0 1-No. of hours generator was on line (service hours) 744.0 Unit reserve shutdown hours 0
Net Electrical Energy (MWH)
I 514436 I
.5.
UNIT SHUTDOWNS (1) Reason A -Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D-Regulatory Restriction E - Operator Tralning/lcense Examination F - Administrative G -Operational Error (Explain)
H - Other (2) Method 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experlence Unit 4 operated at essentially 100% power for the month of July 2003.