Aug. 14, 2003
_w
- A_:
Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-37033 USER INFORMATION:
Name:GERLACH*ROSE M Address: NUCSA2 Phone#:
254-3194 EMPL#:28401 CA#:0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 08/14/2003 LOCATION:
DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR -ELECTRONIC MANUAL ASSIGNED TO YOU:
101 -
101 -
EMERGENCY DIRECTOR (ED)-TSC EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 06/26/2003 ADD MANUAL TABLE OF CONTENTS DATE: 08/13/2003 CATEGORY: PROCEDURES TYPE: EP ID:
EP-PS-101 ADD: PCAF 2003-1571 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
PROCEDURE CHANGE PROCESS FORM
- 1. PCAF NO. "
57/
- 12. PAGE I OF
- 13. PROC. NO.
EP-PS-101 REV. 19
- 4. FORMS REVISED A R R..
,j=- __
R_.,
_ R__
- _R_,
R
- 5. PROCEDURE TITLE TSC Emergency Director Emergency Plan Position Specific Instruction
- 6. REQUESTED CHANGE PERIODIC REVIEW E
NO 0 YES INCORPORATE PCAFS 3 NO
-E YES #0 _
REVISION
[
PCAF DELETION Q (CHECK ONE ONLY)
- 7.
SUMMARY
OF I REASON FOR CHANGE O Added clarification step to both procedures to state that the TSC and EOF sho4ld be activated whenever the NERO is called out regardless of EAL classification level.
0 1-f X
O Added clarification to-both procedures that the activation process is the same fegardless of the EAL classification level.
O Added clarification that if a EAL classification Is made by a facirity,'that same fatflity is to make the notifications prior to turnover to another facility.
This is an administrative change since it provides clarificatioh to an existing technical requirement.
Continued E
- 8.
DETERMINE COMMITTEE REVIEW REQUIREMETS, ji (Refer to Section 6.1A)
A; PORC REVIEW REQ'D?
NOYES
- 9.
PORC MTG#
BLOCKS 11 THRU 16 ARE ON.PAG#2 OF FORM________________
- 17.
T.C. Dalpiaz J <3227 O
/08/2003
- 18. COMMUNICATION OF CHANGE REQUIRED?
PREPARER
' DATE L]l NO
%3YES (TYPE) E Mail Notification (Print or Type) (:
SIGNATURE ATrEsTS THAT RESPONSIBLE SUPERVISOR HAS
- 19.
f
/
CONDUCTED OADR AND TECHNICAL REVIEW UNLESS OTHERWISE DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.
5 ( *U E R2t SOR~
s
°
-jr g
^CROSS DISCIPUNE REVIEW OIF REQUIRED) HAS BEEN COMPLETED BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.
- 20.
4 Q-VFUM'APPMOVAL DATE
- 21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY INITIALS DATE l ERIC;ES.SSES FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)
PROCEDURE CHANGE PROCESS FORM
- 1. PCAF NO,2
/5'?/
- 12. PAGE 2 OF..
J
- 13. PROC. NO. EP-PS-101 REV. 19
- 11. This question documents the outcome of the 50.59 and 72A8 Review required by NDAP-QA-0726. Either 11a.
b, c or d must be checked BYES and the appropriate form attached or referenced.
- a. This change Is an Administrative Correction for which 50.59 and 72A8 are not YES N/A applicable.
- b. This change is a change to any surveillance, maintenance or administrative 3 YES fl N/A procedure for which 50.59 and 72A8 are not applicable. -
- c. This change Is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new f
YES N/A 50.59172.48 Evaluation is required.
Screen/Evaluation No.
__-_:________________X_________
- d. 50.59 and/or 72.48 are applicable to this change and a 50.59172.48 L]
YES Z
NIA Screen/Evaluation is attached.
i YES
- Change Request No.
______X______________:___
- 13. Should this change be reviewed for potential effects on Training Needs or Material?
[
YES 3 NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN
- 14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?
- X YES iZ NO
- 15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per f
YES 3 NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
- 16. Reviews may be documented below or by attaching Document ReviewForms NDAP-QA-0101-1.
REVIEWED BY WITH DATE REVIEW NO COMMENTS Q A D R TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS
- V r -_
IST **
OPERATIONS
- _X___ =_=________
NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE
=_:_:
HEALTH PHYSICS
__i_
NUCLEAR TECHNOLOGY
___iI__
CHEMISTRY
-_:_=_X_
i OTHER 10 CFR 50.540 hXA= if.
Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)
Required for changes to Section Xl Inservice Test Acceptance Criteria.
FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)
i:
PCIF-W
- a=Z2 EP-PS-iO1 Revision 19
.Page 3of4 EMERGENCY DIRECTOR (ED}TSC:
Emergency Plan-Position Specific Procedure WHEN:
Emergency Support Center (TSC) is activated HOW NOTIFIED:
REPORT TO:
WHERE TO REPORT:
Phoned by Station Operator After hours: Paged Vice President-Nuclear Operations Control Room/TSC OVERALL DUTY:
Manage the Technical Support Center (TSC) so that the plant responds to the emergency, people are protected, and the center processes information to those who need to know. Once the EOF has taken over these communications and radiological functions, concentrate exclusively on returning the plant to a safe condition.
MAJOR TASKS:
TAB:
REVISION:
Assemble and brief TSC staff, then take over the task of managing the emergency.
Reclassify the emergency as conditions change.
Make sure information is being communicated to company, public, and government personnel.
Make protective action recommendations to safeguard public and measures to protect personnel working in or near the plant.
Review Severe Accident Management (SAM),
strategies.
Manage turnover to the next shift.
Turn over Emergency Management to the EOF.
When emergency is terminated, disband the TSC staff.
TAB A 4411 a.
-k I,a-TAB B TAB C TABD ITAB E TAB F 8
6 10 4
4
%L-
-k I A
TAB G TAB H 0
L PCF -2~./
V TAB A EP-PS-101-A
-Revision X -01)
Page 1 of 7 I: u 4-.
MAJOR TASK:
Assemble and brief TSC staff, then-take over the task of managing the emergency.
SPECIFIC TASKS:
HOW:
NOTE: When the NERO Is called out, the TSC should be activated regardless of the classification level.
NOTE:The activation process is the same regardless of classificationX level -
NOTE (1): -
=
I The Operations Coordinator may perform Steps 1 through 3b (as defined by parenthesis) if the TSC Emergency Director has assumed the role of the ED in the Control Room.
NOTE (2):
If the ED did NOT take over
'Control of the Emergency proceed with Step 1.
- 1.
Determine plant status.
la.
Report to Control Room.
lb.
Receive turnover from Shift Manager.
HELP CONTROL ROOMITSC TURNOVER CHECKLIST
=; See TAB 5 lc.
Determine:
(1)
Resources or actions required by Operations.
(2)
In progress plant activities.
- 2.
Assume overall management of the emergency.
2a.
Verify key Coordinators are ready to assume emergency finctions required for activation:
(1)
Operations Coordinator (2) -- Damage Control Team coordinator
^
I TABA EP-PS-101-A
. Revision.1 1/
- Page 2 of 7 -
U.
A-0 SPECIFIC TASKS:
HOW:
(3)
Rad Protection Coordinator__
(4)
TSCCoordinator (5)
TSC NRC Communicator ::
(6)
Security Coordinator
-HELP Emergency Organization See TAB 2 NOTE:IF AN EAL DECLARATION HAS JUST BEEN MADE IN THE CONTROL-
- I ROOM, ENSURE THE CONTROL ROOM ALSO MAKES THE OFFSITE NOTIFICATIONS AND PAR NOTIFICATIONS (if a General Emergency was declared)
NOTE:
The OperafTons Coordinator may perform-step 2b as defined in().,
However, only a qualified ED can relieve the Control Room ED of overall management of the emergency.
2b.
Contact the Shift Manager and relieve Control Room of overall management of emergency.
(Ops Coordinator wtodfy Control Room ED of readiness of TSC to take
-turnover.)
(1)
Offsite Notification (TSC Communicator)
(2)
Dose Projection (Rad Protection Coordinator) -
(3)
Emergency Teams (Damage Control Team Coordinator)
- (4)
Emergency Classification (Technical Support and Operations Coordinators)
(5)
Protective Action Recommendations (Rad.
Protection Coordinator).
U--k
4 -- --- -
=
PCAF#,? L, i TABAl PAGE.~~Op
//
~
EP-PS-101-A
-/
= ; 0
- X. Revision
/;
_ 0 7 f
- S~~~~~~~~~-age 3 of 7 SPECIFIC TASKS:
HOW:
2c.
If the Operations Coordinator prepared the TSC for activation while you were filling the role of Control Room ED, activate the TSC.
2d.
Make a Plant PA announcement when the "TSC is in control of the emergency."
NOTE (1):
The Plant Page located on the ED Desk Is Local to the TSC. The Plant-wide PA is located on either wall in the TSC.
NOTE (2):
This responsibility can be delegated to the TSC Communicator.
2e.
Brief TSC personnel on emergency situation.
2f.
Review classification of emergency (TAB B).
2g.
Review radiological conditions and dose projections if applicable (TAB D).
- 3.
Perform external notifications.
3a.
Notify Public Information Manager of plant status.
- 3b.
Notify Senior Vice President-Generation and Chief Nuclear Officer, or VP - Nuclear Operations. Request they notify other managers as appropriate.
PCAF IPJ
_57/
TAB A
.>^.4~~-;'
- . 7-0 X i
EP-PS-101-A IL
t
.JiFur-
//
X 0*Revision4 4-
-1 0 -_ -; ---;
f W~~~-
age 4 of 7 7 SPECIFIC TASKS:
HOW:
- 4.
Direct the Security or Admin Coordinators to verify 60 and 90 minute NERO members respond.
5.-
Manage the emergency.
Sa. -. Reclassify the emergency as conditions change (TAB B).
5b. -
Communicate information concerning emergency (TAB C).
- =
- c.
Initiate radioactive release monitoring to support Public Protective Action -
Recommendation-(TAB D).
- 5d.
Make Protective Action Recommendation as required (TAB D).
-:-Se.
Notify the Control Room to initiate accountability.
NOTE (1):
Accountability required at Site Area Emergency or higher classification (c4onsider habitability of accountability locations). Rad Protection and Security Coordinators responsible to implement.
NOTE (2):
Once accountability is ordered, it must be maintained until either the event is terminated or an evacuation is ordered.
-Sf Initiate RCA Evacuation-when plant conditions dictate or.
(1)
When accountability is initiated.
X : 0 0 XPCAF00tS
_ p571
- 0TAB A
=-PAG6 -
0'.
1, EP-PS-101-A
,-Revision 4
/49 X
- 7 f ~-Page 5of 7 SPECIFIC TASKS:
HOW:
5g.
Initiate Site Evacuation of non-essential personnel when site conditions dictate or when a Site or General Emergency is declared AND accountability is complete.
NOTE:
Essential personnel:
Operations Maintenance Health Physics Chemistry Security NERO Members
- (1) lInstruct Security Coordinator to perform site
-evacuation.
(2)
If the TSC is in control of the Emergency, direct both TSC Communicators to notify offsite agencies of the evacuation initiation.
(3):
If the EOF is in control of the emergency, direct the TSC E-Plan Communicator to notify the EOF Communicator of the evacuation so that the EOF can notify offsite agencies.
(4)
Direct the TSC NRC Communicator to notify the NRC of the evacuation initiation.
Sh.
Monitor plant status.:
NOTE:
Ops Coordinator responsible to maintain.
PCAF 2 V-PAGE~0 I,
TABA EP-PS-101-A
- Revision 8 1/
-Page 6 of 7 iL SPECIFIC TASKS:
HOW:
5i.
Establish plant priorities.
NOTE:
Ops Coordinator responsibility.
5j.
initiate corrective actions for plant priorities.
NOTE:
Damage Control Team Coordinator responsible to implement actions.
5k.
Ensure proper resources are available to combat emergency.
NOTE:
Damage Control Team and Admin.
Coordinators responsibilities.
- 51.
Initiate core damage assessment.
NOTE:
Tech Support Coordinator responsibility. Requires PASS sample - Chemistry Coordinator.
Sm.
Initiate 24-hour shift coverage for emergency positions.
NOTE:
Admin. Coordinator responsible.
5n.
Support emergency medical response, search/rescue.
NOTE:
Reference SP-00-308, (Emergency Medical Response, Search/Rescue)
- 6.
Request Federal assistance to augment NERO.
6a.
When federal assistance is required, requests should be coordinated with PEMA and/or DEP/BRP.
I I -
I I
PCAF #. 2 (d../7 PAG~JF/
TAB A EP-PS-101-A
. Revision 10 I/
-Page 7 of 7 -
SPECIFIC TASKS:
HOW:
- 7.
If required, invoke the provisions of I OCFR 50.54X. :
7a.
In accordance with IOCOR 50.54X, operation outside the Technical Specifications shall only be taken in an emergency:
(I)
When action is immediately needed to protect the public health and safety and no action consistent with license conditions and Technical Specifications that can provide adequate or equivalent protection is immediately apparent.
(2).
Direct the Operations Coordinator to have the Shift Manager implement the provisions of OP-AD-001 Section 6.2.6.
VCftF_ IJ~f1 TAGI.L O-F II-~
XTABG EP-PS-101-G Revision 4 X
-Page 1 of 1 MAJOR TASK:
Turn over Emergency Management to EOF, but continue to assess plant conditions and evaluate reclassification based on plant parameters.
SPECIFIC TASKS:
HOW:
-1.
Collect turnover information from designated sources.-
la.
Use turnover checklist.
HELP TSCIEOF TURNOVER CHECKLIST See TAB 5
- 2.
Turnover of control of overall management of emergency activities from the TSC to the EOF.
2a. Review turnover-checklist with Recovery Manager.
NOTE: IF AN EAL DECLARATION HAS JUST BEEN MADE IN THE'-,
TSC, INSURE THAT OFFSITE X -
NOTIFICATIONS ARE MADE BY THE TSC PRIOR TO TURNOVER TO THE EOF.
NOTE: IF A GENERAL EMERGENCY WAS JUST i
DECLARED IN THE TSC INSURE THAT THE PAR AND PAR NOTIFICATIONS ARE MADE BY THE TSC PRIOR TO TURNOVER TO THE EOF.
- 3.
Continue to assess plant conditions and evaluate reclassification plant parameters.
X NOTE:
The Emergency Director is responsible to notify the Recovery Manager when in-plant conditions associated with an Emergency Action ILevel have been reached.