ML032380283

From kanterella
Jump to navigation Jump to search
Revised Emergency Director/Control Room: Emergency Plan-Position Specific Procedure
ML032380283
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/14/2003
From:
Document Control Desk
To: Gerlach R
Susquehanna
References
28401 EP-PS-100, Rev 18
Download: ML032380283 (25)


Text

Aug. 14, 2003 t

Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-37077 USER INFORMATION:

Name:GERLACH*ROSE M4 EMPL#:28401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 08/14/2003 LOCATION:

DOCUMENT CONTROL DESK FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

100 -

100 -

EMERGENCY DIRECTOR/CONTROL ROOM: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 06/26/2003 f

ADD MANUAL TABLE OF CONTENTS DATE: 08/13/2003 CATEGORY: PROCEDURES TYPE: EP ID:

EP-PS-100 ADD: PCAF 2003-1578 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

AbET

PROCEDURE CHANGE PROCESS FORM

1. PCAF NO.

12 PAGE 1 OF _L _ r 13. PROC. NO. EP-PS-100 :

REV. 18

4. FORMSREVISED BLR 15. -

C R 13, - p= Rj.

, - E. R 14, R_

5.

PROCEDURE TITLE

-Emergency Plan Position Specific Instruction: EMERGENCY DIRECTOR, CONTROL ROOM: EMERGENCY PLAN POSITION-SPECIFIC INSTRUCTION

6.

REQUESTED CHANGE PERIODIC REVIEW ED NO 0 YES INCORPORATE PCAfS 0 NO ] YES REVISION

[

PCAF s

DELETION El (CHECK7ONE ONLY)

7.

SUMMARY

OF IREASON FOR CHANGE Added clarification step to each emergency classification section to direct the Shift Marnager on notifying Control Room personnel to contact the Field Unit Supervisor or OSC Coordinotbr directly in order to diospatch field operators during Emergency Plan implementation.

This is an administrative change since it provides clarification to an existing eqirement.

Continued f]

8. DETERMINE COMMITTEE REVIEW REQUIREMENT'TS' (Refer to Section 6.1.4)

PORC REVIEW REQ'D?

3 o 0 YES

9.

PORC MTG#

BLOCKS 11 THRU 16 ARE ON PAGE2OF FORM

17.

T.C. Dalpiaz I

4O3227/

08/42003 118.

COMMUNICATION OF CHANGE REQUIRED?

PREPARER DATE NO 1 3YES (TYPE) E Mail Notification (Pnint or Type) Sf,

's*;

19.

\\;

55-8g' - - -SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS j.5 t>X-::: '

}X}3 CONDUCED>DR ADTECHNICALRVEW UNLESSOTHERWISE

/!&/4 XDOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.

DGfl ATE CROSS DISCIPUNE REVIEW (IF REQUIRED) HAS BEEN COMPLETED WrScWN$IMEwa; SUPERVISOvRs DAE

-BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.

20.

(_____:0fi 0

7 WUNIX PPROVAL DATE

21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY

[NI DATE

~~~~~~~~~~

IrR N E 0: w R 0

]lAUG0 7- -

IU DOCUMENTCONTROL SERVICES - SSES FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)

PROCEDURE CHANGE PROCESS FORM y/

1. PCAF NO.

i*

12., PAGE 2 OF

3. PROC. NO. EP-FS-100 REV. 18
11. This question documents the outcome of the 50.59 and 72.48 Review required byNDAP-QA-0726. Either 11 a, b, c or d must be checked UYES` and the appropriate form attached or referenced.
a.

This change is an Administrative Correction for which 50.59 and 72.48 are not

[

YES

~

N/A applicable.

b. This change is a change to any surveillance, maintenance or administrative s

YES f

N/A procedure for which 50.59 and 72A8 are not applicable.

c.

This change is bounded by a 50.59/72.48 ScreentEvaluation, therefore, no new

[

YES C-N/A-50.59172.48 Evaluation is required.

Screen/Evaluation No. __'_'_:_-___-_-_____________-E_

d. 50.59 and/or 72.48 are applicable to this change and a 50,59172.48

[-

YES CD N/A Screen/Evaluation Is attached.

12. This change is consistent with the FSAR oran FSAR change isrequired. 0 YES Change Request No. -

_-_-:________:___X______

13. Should this change be reviewed for potential effects on Training Needs or Material?

[

YES s

NO If YES, enter an Action Item @ NiMS/Action/Gen Work Mech/PICN

14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?

[

YES 3 NO

15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per D YES s

NO NDAP-QA-0320? (SICT/E form does not need to be attached.)

16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.

REViEWED -BY WITH X DATE REVIEW NO COMMENTS QADR-X -__-____-_-_____

TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS*

-- = -______

IST **

OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS

-_D_-____

MAINTENANCE

__X_______________

HEALTH PHYSICS NUCLEAR TECHNOLOGY

__-___X___;_-_,_:_-_-

CHEMISTRY at

__-I___-

OTHER 10CFR50.54Q D

E/g77f/

t14 Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (5)

Required for changes to Section Xl Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)

I f

PAG LOF...~Z.-_

EP-PS-100

- Revision 18

. Page 3 of 4 EMERGENCY DIRECTOR (ED) - CONTROL ROOM:

Emergency Plan Position-Specific Procedure WHEN:

Anytime a non-routine event is occurring HOW NOTIFIED:

On shift

-REPORT TO:

Duty Manager WHERE TO REPORT:

Control Room OVERALL DUTY:

Take charge of the plant from the Control Room during an emegency condition,,

assigning duties and directing operations as necessary to return to a safe plant condition (NDAP-QA-300).

MAJOR TASKS:

TAB:

REVISION:

Classify the emergency as conditions indicate.

Manage the UNUSUAL EVENT.

Manage the ALERT EMERGENCY.

Manage the SITE AREA EMERGENCY.

Manage the GENERAL EMERGENCY.

Manage the Site Specific Security threats or other Security EAL conditions.

Determine if there is a non-routine.

Radiological Release in Progress.

TABA TAB B TABC -

TAB D TAB E TAB G 9-4415 41-213 4415 4-14 4

TAB H 0

II

PAG E4l 0 F.

TAB B -::

- EP-PS-1 00-B

.Revision 4415

-Page 1 of 5 MAJOR TASK:

Manage the UNUSUAL EVENT.

SPECIFIC TASKS:

HOW:

1.

Document and communicate the Emergency Classification.

la.'

Announce to Control Room personnel:

(1)

You are assuming the a -Xduties of Emergency Director.

(2)

Emergency classification.

(3)

Time of classification.

2.

Appoint an Emergency Plan Communicator.

3.

Appoint an NRC Communicator.

NOTE:

More than one individual can be named as an NRC Communicator-so that all tasks are accomplished.

2a.

Appoint an Emergency Plan Communicator and instruct him toimmediately perform EP-PS-1-26 E Plan Communicator.

3a-The Communicator should

perform EPPS-135`NRC Communicator.

Activate NERO if desired or request

-notification of Key Managers.

  • Notify the NRC Residents.

Activate the ERDS system within 60 minutes of classification.

Initiate NRC Communications within

- 60 minutes of classification.

4.

Generate and Approve the ENR Form transmitted by the Emergency Plan ' -

Communicator.

5.

Approve Press Releases.

4a.

Review the ENR form with the E Plan communicator.

5a.

Verbal approval acceptable for Press Releases.

PAGLLF P.OFT-Z'.-'I

/

TAB B -- -

EP-PS-1 00-B Revision 4415

-:Page 2 of 5 ti.

SPECIFIC TASKS:

HOW:

6.

Consider activation of NERO at the UNUSUAL EVENT unless the event is expected to be short duration or minimal impact.

7.

If NERO is not activated, Initiate additional notifications.

6a.

Instruct NRC Communicator to activate NERO or initiate Notification of Key Managers through Security.

7a.

Direct any NRC Communicator to perform the following notification:

Within two hours of declaration transmit the emergency classification to off-site agencies:

Institute of Nuclear Power (INPO)

Pennsylvania Rural Electric Assn.

-American Nuclear Insurers (ANI)

PPL Insurance' Group' NOTE:

Phone numbers are contained in the NRC Communicator's procedure, EP-PS-135.

8.

Manage the emergency.

9.

Manage the emergency until relieved by another qualified Emergency Director.

1O.

The relieving Emergency Director should implement this procedure until relieved by the TSC.

8a.

Establish priorities and monitor:

(1)

Plant Status

-(2)

Plant priorities (3)

Corrective actions (4)

Radiological releases 6a.

Establish priorities and monitor:

(1)

Plant Status (2)

Plant priorities (3)

Corrective actions (4)

Radiological releases 7a. --

When the TSC is staffed and ready, i proceed to the TSC and assume control of X -

the Emergency unless another ED has

assuned control.

.4-

- rU~~~l-0.§54 2

PAGLL.OF.2 /'

TAB B --

I EP-PS-100-B Revision 4415

Page 3 of 5 SPECIFIC TASKS:

HOW:

11.

Contact Security to Initiate emergency medical response, search and rescue when required.

12. If a non-routine radiological release is suspected/in progress, Initiate off-site dose calculations.

NOTE:

See Tab H for additional information on determining if there is a non-routine release in.

progress.

13.

Consider the need to obtain a coolant sample.

14. If a liquid release is suspected, direct Chemistry to obtain a Liquid Discharge Sample.
15. When contacted, brief the PUBLIC INFO. MANAGER, Duty Manager.

and Recovery Manager.-

16. Evaluate the need for local/RCA evacuation.
17. Evaluate the need for accountability.

NOTE (1):

Accountability is optional at the Unusual Event Level.

NOTE (2):

Once accountability is ordered, it must be maintained for the duration of the event or until a Site Evacuation is ordered.

I la., XReference SP-00-308 (Emergency Medical Response, Search/Rescue) 12a.

Notify Health Physics that off-site dose calculations are required.

12b.

Notify Health Physics to prepare for and dispatch OSCAR.

13a.

Notify Chemistry, to obtain a-coolant sample via EP-PS-l 15.

14a..

Notify Chemistry to obtain a Discharge Sample via EP-~PS-l 1.5-Q.

15a.

Brief concernin (1)

Plant status

~(2)

Radiological condition (3)

Emergency Classification Level 16a.

Instruct available Control Room Personnel to announce evacuation.

I.7a.

Instruct available Control Room Personnel to initiate accountability.

(Refer to OP-AD-022.)

14.a-Notify Security of any Operations

-ersonnel that are in the plant

s

'AF w

-/

~~A~f~r~f/

TAB B rPAGF OF EP-PS-100-B

-Revision 4415 I

- -Page 4 of 5 I I SPECIFIC TASKS:

HOW:

18. If plant conditions change, reclassify emergency and enter appropriate tab for classification level.

FOR UPGRADING EMERGENCY ALERT TAB "C" SITE AREA TAB "D" GENERAL TAB "E"

19.

Transfer Emergency Management duties to TSC Emergency Director if TSC is staffed.- -

NOTE: If you have just declared the Unusual Event, insure that offsite notifications are made prior to turnover to the TSC.

HELP Emergency Classifications.

See TAB 4 19a.

Review the following with TSC Emergency Director:

(1)

Classification of Emergency (2)

Radiological conditions in-plantloffsite/projected (3)

Priorities and corrective actions taken (4)

Plant status (5)37 Offsite Notifications I

19b.

Announce to Control'Room personnel -

TSC has control of emergency - when transfer is complete.

19c Notify Control Room personnel to contact the Field Unit Supervisor or the OSC Coordinator for dispatching Operations personnel as India Teams for the implementation of Operations procedures: OP, X -

EOP, Off-Normal, etc.

NOTE: Mitigating actions that require dispatch of operations personnel are to be identified to the Shift Manager and then' to the Operations Coordinator IU-il.

20.

IF a decision to downgrade or terminate the emergency is made, perform the following:

- 20a.

Confirm with (if possible):

(1) - VP-Nuclear Operations (2)

Duty Manager

wi"&

VL;'t. -f--

PAGF 0 F2LS TABB - -

EP-PS-100-B

. Revision 4415

-Page 5 of 5 I',

SPECIFIC TASKS:

HOW:

(3)

NRC (optional for UE)

(4)

DEP/BRP (optional for UE) 20b.

Obtain approval from Senior Management prior to implementation.

(1)

Sr.VP &CNOOR (2)

VP-Nuclear Operations

21. Generate an ENR form terminating the event.
22. Emergency termination:

(1) Return OPS to normal organization.

21a..

Review the ENR form with the E Plan Communicator and direct him to make offsite notifications.

22a.

Instruct STA to collect and organize paperwork for reconstructing the emergency and its management.

- -1 i le - -

YCAF, fF-PAGEZAF_.-.W-

TAB C-EP-PS-100-C Revision 4213

-- Page 1 of 5 I -,.

MAJOR TASK:

Manage the ALERT EMERGENCY.

SPECIFIC TASKS:

-HOW:

1.

Document and communicate the Emergency Classification.

2.

If not performed earlier, appoint an

,Emergency Plan Communicator.

3.

If not performed earlier, appoint an NRC Communicator.

NOTE:

More than one individual can be named as an NRC Communicator so that all tasks are accomplished.

la.

Announce to Control Room personnel:

(1)

You are assuming the duties of Emergency Director.-

(2)

Emergency classification.

0 (3)

Time of classification.

2a.

Appoint an Emergency Plan Communicator' and instruct him to immediately perform EP-PS-126 E Plan Communicator.

3a.

XThe Communicator should perform EP-PS-135 NRC

-Communicator..

Activate NERO.

Notify the NRC Residents.

  • Activate the ERDS system within
60 minutes of classification.

Initiate NRC Communications within 60 minutes of classification.

4.

Generate and approve the ENR form to be transmitted by the E Plan Communicator.

X

5.

Approve Press Releases.

4a.

Review the ENR form with the E Plan Communicator.

5a.

Verbal approval acceptable for Press Releases.

"I&

A4-FGA,0 vzM a2-$

rU~l-E2~Zj~TAB C PAGL;dOFF EP-PS-100-C Revision 4.213 l i

-Page2of5 HOW:

SPECIFIC TASKS:

6.

Manage the emergency until relieved by another qualified Emergency Director.

7.

The relievn Emergency Director should implement this procedure until relieved by the TSC.

-8.

Contact Security to Initiate emergency medical response, search and rescue when required.

9.

Initiate Core Damage Assess ment.,

10. If a non-routine radiological release is suspected/in progress, initiate off-site dose calculations.

NOTE:

See Tab H for additionalt information on determining If:

there is a non-routine release in progress.

6a.

Establish priorities and monitor:

(1) : Plant Status =

(2)

Plant priorities (3)

Corrective actions (4)

Radiological releases 7a.-

When the TSC is staffed andready, proceed'to the TSC and assume control of the Emergency unless another ED has assumed control.

8a.

Reference SP-00-308 (Emergency Medical Response, Search/Rescue) 9a.

Notify Chemistry to obtain a Rx Coolant sample via EP-PS-l 15.

l0a.

Notify Health'Physics that off-site dose calculations are required.

-10b. -Notify Health Physics to prepare for and dispatch OSCAR.

11.

Consider the need for emergency '

exposure considerations/KI tablet issuance.

I :

i HELP I PPL Emergency Personnel:

Dose Assessment and Protective Action Recommendation Guide

-See TAB 6

77 Air

~~*

I r

V-PAGL F0 F..,.. -

TAB C EP-PS-1 00-C

, Revision 4213

-Page 3 of 5 -

'3-SPECIFIC TASKS:

HOW:

12. If a liquid release is suspected, direct Chemistry to obtain a Liquid Discharge Sample.
13.

When contacted,- brief the following managers of events:

Duty Manager Public Info Manager Recovery Manager

14. If plant conditions change, reclassify emergency and enter appropriate tab ---

for classification level.

- For UPGRADING Emergency:

SITE AREA TAB "D"4 X

GENERAL TAB"E"

15. Evaluate the need for local/RCA evacuation.
16.

Evaluate the need for accountability.

NOTE (1):

Accountability is optional at the Alert Level.

NOTE (2):

Once accountability Is ordered, it must be maintained for the duration of the event or until a Site Evacuation is ordered.

12a.

Notify Chemistry to obtain a Discharge Sample via EP-PS-1 15-Q.

13a Brief Managers on:

(1)

Plant status (2)

Radiological condition (3)

Emergency Classification Level HELP Emergency Classifications See TAB 4 15a.

Instruct available Control Room Personnel to announce evacuation.

16a.

Instruct available'Control Room Personnel to initiate accountability.

(Refer to OP-AD-022.)

16b.

-Notify Security of any Operations personnel that are still in the plant.

7 a

-~~~~~~~~~~~~~~~~~~~~~~~~~~.

PAGLLOFI.~m

'Revision 4213 Page 4 of 5 SPECIFIC TASKS:

HOW:

17. Transfer Emergency Management duties to-the TSC.

NOTE: If you have just declared the Alert, insure that offsite notifications are made prior to turnover to the TSC.

17a.

Review the following with TSC

, Emergency Director or with the

- Operations Coordinator:

U-I-k (1)

Classification of Emergency (2)

Radiological conditions in-plant/offsite/projected (3)

Priorities-Ed corrective actions taken (4)

Plant status (5)

Offsite Notifications 17b.

Announce to Control Room personnel -

TSC has control of emergency - when transfer is complete.

17c Notify Control Room personnel to contact the Field Unit Supervisor or the OSC Coordinator for dispatching Operations personnel as India Teams for the implementation of Operations procedures: OP, EOP, Off-Normal, etc.

NOTE: Mitigating actions that require dispatch of operations personnel are to be identified to the Shift Manager and then to the Operations Coordinator I%-

An:

FUAV

.PAG =

OFZ:

TAB C

EP-PS-100-C

. Revision 4213

,-Page 5 of 5

%I, ISPECIFIC TASKS:

HOW:

18. If conditions indicate that the emergency can be downgraded or I :

terminated, provide a recommendation to the TSCIED or EOF/RM as appropriate.

19. Emergency Termination (1) Return Ops to normal organization -

OR (2) Recommend creating a restoration organization 19a.

Instruct STA to collect and organize paperwork for reconstructing the emergency and its management.

19b.: Recommend to ISC Emergency Director or Recovery Manager

-to establish a restoration organization

~

See TAB 8 "Restoration Organization Guide".

HELP Restoration Organization Guidelines

See TAB 8

7-FULAI-mofi PAGELLY-OF1~'..

I TAB D EP-PS-100-D

. Revision 4415

-Page 1-of 5 MAJOR TASK:

Manage the SITE AREA EMERGENCY.

SPECIFIC TASKS:

HOW:

1.

Document and communicate the Emergency Classification.

2.

If not performed earlier, appoint an Emergency Plan Communicator.

3.

If not performed earlier, appoint an NRC Communicator.

NOTE:

More than one Individual can be named as an NRC

-Communicator so that all tasks~

are accomplished.

la.

Announce to Control Room personnel:

-(1)

- Youareassumingthe duties of Emergency Director.

(2)

Emergency classification.

(3)

Time and date of classification.

2a.

Appoint an Emergency Plan Communicator and instruct him to immediately perform EP-PS-126 E Plan Communicator.

3a.

The Communicator should perform EP-PS-1 35 NRC Communicator.

  • Activate NERO.
  • Notify the NRC Residents.

Activate the ERDS system within 60 minutes of classification.

Initiate NRC Communications within 60 minutes of classification.

4.

Generate and approve the ENR form to be transmitted by the Emergency Plan Communicator.

5.

Approve Press Releases.

4a.

Review the ENR form with the

- E Plan Communicator.

5a.

Verbal approval acceptable for Press Releases.

.1 KO-PAGEj,5-TAB D -

EP-PS-100-D Revision 4415

-Page 2 of 5 IU.

SPECIFIC TASKS:

HOW:

6.

Consider the need for emergency exposure considerations/KI tablet issuance.

7.

Manage the emergency until relieved by a qualified Emergency Director.

8.

The relieving Emergency Director should implement this Procedure until

-relieved by the TSC.

9.-

Contact Security to Initiate, emergency medical response, search and rescue when required.

10.

Initiate-Core, Damage Assessment.

11.

If a non-routine radiological release-suspected/in progress, initiate of-sitle dose calculations.-

NOTE:

See Tab H for additional information on determining if there is a non-routine release in progress.-

1.If a liquid release is suspected, direct Chemistry to obtain a Liquid Discharge Sample.

- HELP PPL Emergency Personnel Dose Assessment and Protective Action Recommendation Guide

- See TAB 6 '

7a.

Establish priorities and monitor:

(1)

Plant Status :

(2)

Plant priorities (3)

Corrective actions (4)

Radiological releases 8a.

When the TSC is-staffed and ready, proceed to the TSC and assume control of the Emergency unless another ED has assumed control.

9a.

Reference SP-00-308 (Emergency Medical Response, Search/Rescue) la.

Notify Chemistry to obtain a Rx Coolant sample via EP-PS-1 15.

I la.

Notify Health Physics that -

off-site dose calculations required.

I lb.

Notify Health Physics to prepare for and dispatch OSCAR.

12a.

Notify Chemistry to obtain a Discharge Sample via EP-PS-I 15-Q.

ow

=IF



V

. FVAF 4V Qn, :,,,

TAB D EP-PS-100-D

.Revision 4415

-Page 3 of 5 SPECIFIC TASKS:

HOW:

13.

Initiate accountability, if not performed earlier.-

NOTE (1):

Accountability is required at the Site Area Emergency.

NOTE (2):

Once accountability is ordered, it must be maintained for the duration of the event or until a Site Evacuation is ordered.

14.

Initiate Site Evacuation.

13a.

Instruct available Control Room Personnel to initiate accountability.

(Refer to OP-AD-022.)

13b.

Notify Security of any Operations personnel that are still in the plant.

14a.

Direct Security to notify Accountability Area Leaders to direct Site Evacuation.

14b.

Initiate ENR form indicating a Site Evacuation was initiated.

-14c.

Direct Emergency Plan Communicator to communicate ENR form to offsite agencies.

15.

When contacted, brief the following managers of events:.

f -

-Duty Manager V D Recovery Manager 0 -

Public Info Manager

16. If plant conditions change, reclassify emergency and enter appropriate tab for classification level:

- For UPGRADING emergency:

GENERAL TAB &G")

15a. id Brief Managers on:

-(1)

Plant status (2)

Radiological condition (3)

Emergency classification level

-HELP Emergency Classifications See TAB 4

17. If conditions indicate that the emergency can be downgraded or terminated, provide a recommendation to the TSC/ED or EOF/RM as appropriate.

i-rL;AI0- - v2 ecA~ffi't52

-TABD PAG OF U

EP-PS-io0-D

'ReVislon 4415 l4 Page4of5 SPECIC TASKS:

1HOW:

18. Transfer Emergency Management 18a.

Review the following with TSC duties to the TSC.

Emergency Director or with the Operations Coordinator' NOTE: If you have just declared the Site Area Emergency, insure that offsite notifications are made prior to turnover to the TSC.

(1)

Classification of Emergency (2)

Radiological conditions in-plant/

offsite/prijected (3)

Priorities and corrective

  • - '--actions taken (4)

Plant status (5)

Offsitc Notifications 18b.

Announce to Control Room personnel - TSC has control of emergency - when transfer is complete.

1 8c.:- Notify Control Room personnel to contact the Field Unit Supervisor or the OSC Coordinator for dispatching Operations personnel as India Teams for the implementation of Operations procedures: OP, EOP, Off-Normal, etc.

NOTE: Mitigating actions that require dispatch of operations personnel are to be identified to the Shift Manager and then to the Operations Coordinator

- I Gf~ t9lD-,&

'PAGE- ? F TAB D -

- -EP-PS-10O-D

. Revision 4415 S-Page 5 of 5 SPECIFIC TASKS:

HOW:

I19.

Emergency Termination (1) Return Ops to normal organization OR (2) Recommend creating a restoration organization 19a. - Instruct STA to collect and organize paperwork for reconstructing the emergency and its management.

19b.

Recommend to TSC Emergency Director or Recovery Manager to establish a restoration organization See TAB 8 "Restoration Organization Guide"

HELP Restoration Organization Guidelines X See TAB 8
AGF O L 1 A I.

PAGF ELFJ~

OF TABE 0

EP-PS-1 0O-E

'Revision 4314 Page 1 of 6 t-.

MAJORTASK:

Manage the GENERAL-EMERGENCY.

SPECIFIC TASKS:

HOW:

1.

Document and communicate the Emergency Classification.

la.

-Announce to Control Room personnel:

00

(1)

You are assuing the I L--duties of Emergency I -

Director.

(2)

- Emergency classification.

(3)

- Time and date of classification.

2.

If not performed earlier, appoint an Emergency Plan Communicator.

3.

If not performed earlier, appoint an NRC Communicator.

NOTE:

More than one individual can be named as an NRC Communicator so that all tasks are accomplished.

2a.

Appoint an Emergency Plan Communicator and instruct him to immediately perform EP-PS-126 EIPlan Communicator.

3a.

The Communicator should perform EP-PS-135 NRC Communicator.

Activate NERO.

Notify the NRC Residents.

Activate the ERDS system within 60 minutes of classification.

Initiate NRC Communications within 60 minutes of classification.

4.

Generate and approve ENR form to be 4a.

transmitted by the Emergency Plan -

Communicator.

Review the ENR form with the E Plan Communicator.

MENE-_

PAGE OF TABE EP-PS-1 O-E

-Revision 4314 page 2 of 6

%I-I k I

%-1.

r-,%-

SPECIFIC TASKS:

HOW:

5.

When a General Emergency is declared, make Protective Action Recommendation (PAR) within

- 15 minutes.

I

-5a.- -Go to TAB 5 "Public Protective

Action Recommendation Guide."

5b.

5c.

HELP

'Protective Action Recommendation Flowcharts See TAB 5 Choose appropriate PAR.

Shift Manager/ED shall notify the Senior State Official, using the PAR State Notification Form, at 717-651-2148.

HELP Protective Action'Recommendation State Notification Form See TAB 9

6.

Approve Press Release prior to

issuance.
7.

Communicate the need for employee

-emergency exposure considerations/Kl X tablet issuance.

6a.

Verbal approval is acceptable for Press Releases.

NOTE:

Twelve vials of Potassium Iodide, (KI), are stored in the cabinet outside the-Control Room kitchen area and one hundred vials are stored in the Health Physics Instrument Shop.

HELP PPL Emergency Personnel Dose Assessment And Protective Action Recommendation Guide See TAB 6

8.

Manage the emergency until relieved 8a.

by another qualified Emergency Director.

Monitor and obtain updates on:

11

I 7y P&-3-/5/V -

tj "m

1U0,ff.-v

'111. 

P TAB E

-EP-PS-1 OO-E 7 Revision 4314 Page 3 of 6 k

SPECIFIC TASKS:

HOW:

(1)

(2)

(3)

(4)

Plant Status Plant priorities Corrective actions Radiological releases

9.

The Relieving Emergency Director should implement this procedure until relieved by the TSC.

10. If required, invoke the provisions of IOCFR 50.54X.

9a.

When the TSC is staffed and ready, proceed to the TSC and assume control of the Emergency unless another ED has assumed control.

10a.

In accordance with IOCFR 50.54X, operation outside the Technical Specifications shill only be taken in an emergency:

When action is immediately needed to protect the public health and safety and no action consistent with license conditions and Technical Specifications that can provide adequate or equivalent protection is immediately apparent; implement the provisions of OP-AD-001, step 6.2.6.

11.

Contact Security to Initiate emergency medical response, search and rescue when required.

12.

Initiate Core Damage Assessment.

13.

If a non-routine radiological release suspected/in progress, initiate off-site dose calculations.

NOTE:

See Tab H for additional infonnation on determining if there is a non-routine release in progress.

II a.

Reference SP-00-308

-_=

(Emergency Medical Response; Search/Rescue) 12a.

Notify Chemistry to obtain a Rx Coolant sample via EP-PS-I 15.

13a.

Notify Health Physics that off-site dose calculations required.

13b.

Notify Health Physics to prepare for and dispatch.

OSCAR.

-ig PAG -

Z2-OFZ.T te;OffZ, TAB E EP-PS-100-E Revision 4314 Page 4 of 6 SPECIFIC TASKS:

HoW:

14. If a liquid release is suspected, direct Chemistry to obtain a Liquid Discharge Sample.
15. Initiate accountability, if not performed earlier.

NOTE (1):

Accountability Is required at the Site Area Emergency or General Emergency.

14a Notify Chemistry to obtain a Discharge Sample via EP-PS-1 15-Q.

15a.

Instruct available Control Room Personnel to initiate accountability.

(Refer to OP-AD-022.)

15b.

Notify Security of any Operations personnel that are still in the plant.

NOTE (2):

Once accountability is ordered, It must be maintained for the duration of the event or until a Site Evacuation is ordered.

16.

Initiate Site Evacuation.

I16a.

Direct Security to notify Accountability

Area Leaders to direct Site Evacuation.

16b.

Initiate ENR form indicating a Site Evacuation was initiated.

16c.

Direct Emergency Plan Communicator to communicate ENR form to offsite agencies.

17. When contacted, brief the following managers of events:

Duty Manager Recovery Manager Public Info Manager (if time permits) 17a.

Brief Manager on:

- (1)

- Plant status (2)

Radiological condition (3)

Emergency classification level

18. If conditions indicate that the emergency can be downgraded or terminated, provide a recommendation to the TSC/ED or EOF/RM as appropriate.

4?

PAGE_2__:LF2Z~-e-TAB E EP-PS-100-E

' Revision 4-14 Page 5 of 6 I -

-<E SPECIFIC TASKS:

HOW:

19. Transfer Emergency Managemen t duties to the TSC.

NOTE: If you have just declared the General Emergency, insure that offsite notifications are made prior to turnover to the TSC.

NOTE: If you have just declared the General Emergency, insure that you-make and communicate the Protective Action recommendation prior to turnover to the TSC.

19a.

-Review the following with TSC Emergency Director or Operations Coordinator (1)

Classification of.

Emergency (2)

Radiological conditions in-plant/offsite/projected L.

(3)

Priorities and corrective

-actions taken (4)

Plant status I

0 (5)

Offsite-Notifications 19b.

Notify Control Room personnel to cQntact the Field Unit Supervisor or the OSC Coordinator for dispatching Operations personnel as India Teams for the implementation of Operations procedures: OP, EOP, Off-Normal, etc.

NOTE: Mitigating actions that require dispatch of operations personnel are to be Identified to the Shift Manager and then to the Operations Coordinator is

MXC:U=:

X0 0

3:

PAG~GO~

TAB E EP-PS-100-E Revision 4314 Page 61of 6 SPECIFIC TASKS:

HOW:

20.

Emergency Termination (1) Return Ops to normal organization QOR (2) Recommend creating a restoration organization 20a. - Instruct STA to collect and organize paperwork for reconstructing the emergency and its management.

HELP Restoration Organization Guidelines See TAB 8

-