VARIOUS CHECKLISTS FOR THE LASALLE INITIAL EXAMINATION - MAY 2003

ES-201 Examination Preparation Checklist Form ES-201-1 I

Task Description / Reference Facility: LaSalle County Station Units 1 and 2 I I Date of Examination: May 19-23,2003

-120

-120 Examinations Developed by:

Facility / @ (circle one)

I

3. Facility contact briefed on security & other requirements (C.2.c)
4. Corporate notification letter sent (C.2.d)

Chief Examiner's Initials Target Date*

-1 80

1. Examination administration date confirmed (C.l.a; C.2.a & b)

-1 20

2. NRC examiners and facility contact assigned (C.l.d; C.2.e) 1-90]

[5. Reference material due (C.1.e; C.3.c)J

-75

6. Integrated examination outline(s) due (C.l.e & f; C.3.d)
7. Examination outline(s) reviewed by NRC and feedback provided

-70 I

to facility licensee (C.2.h; C.3.e)

-45

8. Proposed examinations, supporting documentation, and reference materials due (C.l.e, f, g & h; C.3.d)

~~

-30 I 9. Preliminary license applications due (C.l.I; C.2.g; ES-202)

-1 4

10. Final license applications due and assignment sheet prepared
11. Examination approved by NRC supervisor for facility licensee (C.l.I; C.2.9; ES-202) review (C.2.h; C.3.f)

-1 4

-1 4

12. Examinations reviewed with facility licensee (C.l.j; C.2.f & h; C.3.g)

-7

13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)

-7

14. Final applications reviewed; assignment sheet updated; waiver letters sent (C.2.g, ES-204)
15. Proctoring/written exam administration guidelines reviewed with facility licensee and authorization granted to give written exams (if applicable) (C.3.k)
16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)

-7

-7 Target dates are keyed to the examination date identified in the corporate notification letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

Applies only to examinations prepared by the NRC.

[ J

Date of Examination: 5 / 4/6 3 I.

Facil Item

1.

W R

I T

T E

N

2.

S I

M

3.

W I

T

4.

G E

N E

R A

L

a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner (#)
d. NRC Supervisor Note:
  • Not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column "c;" chief examiner concurrence required.

1

,Initial; Task Description I

I a I I b * ( c #

I

!@ !&p

a. Verify that the outline@) fit@) the appropriate model per ES-401.
b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.l of ES-401 and whether all WA categories are appropriately sampled.
c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

I'

d. Assess whether the justifications for deselected or rejected WA statements are appropriate.
a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, and major transients.
b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity; ensure each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants' audit test@)",

and scenarios will not be repeated over successive days.

c. To the extent possible, assess whether the outline@) conform(s) with the qualitative and quantitative criteria specified on Form ES-3014 and described in Appendix D.
a. Verify that:

(1) the outline@) contain@) the required number of control room and in-plant tasks, (2) no more than 30% of the test material is repeated from the last NRC examination, (3)" no tasks are duplicated from the applicants' audit test@), and (4) no more than 80% of any operating test is taken directly from the licensee's exam banks.

b. Verify that:

(1) the tasks are distributed among the safety function groupings as specified in ES-301, (2) one task is conducted in a low-power or shutdown condition, (3) 40% of the tasks require the applicant to implement an alternate path procedure, (4) one in-plant task tests the applicant's response to an emergency or abnormal condition, and

{5) the in-plant walk-through requires the applicant to enter the RCA.

c. Verify that the required administrative topics are covered, with emphasis on performance-based activities.
d. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on successive days.

I 23 of 24 NUREG-1021, Revision 8, Supplement 1

I

?

ES-201 Examir

1.

Pre-Examination I acknowledge that I have acquired specialized knowledge about 1 date of my signature. I agree that I will not knowingly divulge any by the NRC chief examiner. I understand that I am not to instruct, administered these licensing examinations from this date until cor authorized by the NRC.Furthermore, I am aware of the physical SI procedures) and understand that violation of the conditions of this action against me or the facility licensee. I will immediately repori examination security may have been compromised.

2.

Post-Examination To the best of my knowledge, I did not divulge to any unauthorize during the week(s) of 5-1 9 - 03 From the date that I entered inb instruct, evaluate, or provide performance feedback to those appl noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY NOTES:

NUREG-1021, Revision 8, Supplement 1

&q)& LE EfjFfl? - /f14)5,&7Lr3 tion Security Agreement Form ES-201-3 S/,j?/i 3 -7 SI43 5 NRC licensing examinations scheduled for the week(s) of formation about these examinations to any persons who have not been authorized valuate, or provide performance feedback to those applicants scheduled to be detion of examination administration, except as specifically noted below and urity measures and requirements (as documented in the facility licensee's greement may result in cancellation of the examinations and/or an enforcement

) facility management or the NRC chief examiner any indications or suggestions that as of the Dersons any information concerning the NRC licensing examinations administered

his security agreement until the completion of examination administration, I did not mts who were administered these licensing examinations, except as specifically SIGNATURE (I)

DATE SIGNATURE (2) DATENOTE 24 of 24

ES-20 1 Examir

1.

Pre-Examination I acknowledge that I have acquired specialized knowledge about date of my signature. 1 agree that I will not knowingly divulge any by the NRC chief examiner. I understand that I am not to instruct administered these licensing examinations from this date until cor authorized by the NRC.Furthermore, 1 am aware of the physical SI procedures) and understand that violation of the conditions of this action against me or the facility licensee. I will immediately reporl examination security may have been compromised.

2.

Post-Examination To the best of my knowledge, I did not divulge to any unauthorize during the week(s) of

. From the date that I entered int instruct, evaluate, or provide performance feedback to those appl noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY NUREG-1021, Revision 8, Supplement 1 c_P -Spu*fG Ep+y fl%&y h

G 3

tion Security Agreement Form ES-201-3 3 NRC licensing examinations scheduled for the week(s) of % h / O J formation about these examinations to any persons who have not been authorized valuate, or provide performance feedback to those applicants scheduled to be

)letion of examination administration, except as specifically noted below and urity measures and requirements (as documented in the facility licensee's greement may result in cancellation of the examinations and/or an enforcement as of the facility management or the NRC chief examiner any indications or suggestions that persons any information concerning the NRC licensing examinations administered this security agreement until the completion of examination administration, I did not mts who were administered these licensing examinations, except as specifically SIGNATURE (I)

DATE SIGNATURE (2) DATENOTE 24 of 24

S-301 Administrative Topics 0 ut line Form ES-301-1 Administrative Topi c/S u bje ct Description Facility: LaSalle Date of Examination:

5/19/03 Examination Level (circle one): RO @

Operating Test Number:

ILT 02-01 Describe method of evaluation:

1. ONE Administrative JPM, OR
2. TWO Administrative Questions I

Equipment Control 4.1 A.2 656.020 During performance of tasks, apply the administrative requirements of LOS-AA-S101.

SA.2.1 Determine Allowable EOOS Combination WA 2.1.1 1 ImDortance 3.0/3.8 A.3 Emergency Plan A.4

=

SA.4.1 Determine PARS and Fill Out NARS Form for Transmittal WA 2.4.38 Importance 2.2/4.0 Conduct of Operat ions SA.l.l Determine Reporting Requirements WA 2.1.14 ImDortance 2.U3.3 75.02.00 During performance of tasks, apply the administrative requirements of OP-AA-101-102 Conduct of Operations SA. 1.2 Perform Offsite Power Verification WA 2.1.31 ImDortance 3.9/4.2 774.010 Given the proper procedure and a T.S. which requires a time clock for actions, identify and prepare the T.S. actions IAW station procedures.

Radiological Conditions SA.3.1 Ability to Control Rad Releases WA 2.3.1 1 Importance 2.713.2 Radwaste Discharge Source Check I

21 of 26 NUREG-1021, Revision 8, Supplement

Administrative To Dics Out I ine Form ES-301 - I ES-301 Facility: LaSalle Date of Examination:

511 9/03 Examination Level (circle one)

Operating Test Number:

ILT 02-01 Administrative To pi c/S u bject lescription Conduct of Operations Conduct of Operations Equipment Con t ro I Radiological Conditions Emergency Plan Describe method of evaluation:

1. ONE Administrative JPM, OR
2. TWO Administrative Questions A.I.l Verify Off-site Power Lineup WA 2.1.31 Importance 3.914.2

~~~~~

~

A.1.2 Knowledge of Conduct of Operations WA 2.1.1 Importance 3.7/3.8 NRC Active License Maintenance A.2.1 Ability to Track Limiting Conditions for Operations K/A 2.2.23 Importance 2.613.8 Determine T.S. Short Duration Timeclock A.3.1 Ability to Control Rad Releases K/A 2.3.1 I Importance 2.7/3.2 Radwaste Discharge Source Check A.4.1 Reporting Emergencies WA 2.4.39 ImDortance 3.3/3.1 Knowledge of the RO's responsibilities in emergency plan implementation 21 of 26 NUREG-1021, Revision 8, Supplement

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 g-B.l.g Feedwater/TDRFP Surv. With Inability to Trip Date of Examination: 5/19/03 Operating Test Number: ILT 02-01 Exam Level (circle one):

Facility: LaSalle B.l Control Room Systems NAS Reactor Water Level Control System / JPM Title

a.

B.2.a Reactor Core Isolation Cooling/lnstall Jumpers and Lifted Leads for LGA-RI-02.

1 Type Code*

D Safety Function

b.

B.2.b Process Radiation Monitoring/Perform the Local actions to S/U the Main Stack WRGM

a.

B.1.a Diesel Generator/LOS-DG-M3 with loss of SAT DR Electrical I

DAS I

b.

B.1.b Reactor Manual Control/Single Rod Insert During an ATWS I

DSL 1

Reactivity Control I

I C.

B.1.c Pri. Cont. Vent. And Purge/Emergency Vent. The Primary Cont.

DS Cont. Integrity

d.

B.l.d Nuclear Inst./Bypass a Failed Local Power Range Monitor I

DS Inst.

B.l.e I

DAS I Heat Removal from Reactor Recirculation/RR Pump Trip on Downshift 4-1 I

Core

f.

B. 1.f Shutdown of SBGT System IAW LOP-VG-02 Radioactivity I

NSL 1

Release B.2 Facility Walk-Through

~~

~

~

C.

B.2.c Feedwater HeatingNerification of LP Heater 13B Trip ADR I

Reactor Pressure Con t ro I Radioactivity Releases React or Water Leve I Control

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow Power, (R)CA 22 of 26 NUREG-1021, Revision 8, Supplement 1

ES-301 Control Room Svstems and Facilitv Walk-Throuah Test Outline Form ES-301-2

/

Date of Examination: 5/19/03 Operating Test Number: ILT 02-01 Exam Level (circle one): RO / SRO(I)

Facility: LaSalle B.l Control Room Systems System / JPM Title B.l.e Reactor Recirculation/RR Pump Trip on Downshift B.l.f Shutdown of the SBGT System B.l.g FeedwaternDRFP Surv. With Inability to Trip 11 B.2 Facility Walk-Through TY Pe Code*

DAS NSL NAS Safety Function Heat Removal from Core Radioactivity Release Reactor Water Level Control

a.

B.2.a Reactor Core Isolation Cooling/lnstall Jumpers and Lifted Leads for LGA-RI-02.

D Reactor Pressure Control

b.

B.2.b Process Radiation Monitoring/Perform the Local actions to S/U the Main Stack WRGM DR Radioactivity Releases

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow Power, (R)CA 22 of 26 NUREG-1021, Revision 8, Supplement 1 V

ES-301 Operatins Test Quality Checklist Form ES-301-3 Facility:

Date of Examination:

Operatir

1. GENERAL CRITERIA
a.

The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g.. 10 CFR 55.45, operational importance, safety function distribution).

There is no day-today repetition between this and other operating tests to be administered during this examination.

The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.l.a).

Overlap with the written examination and between operating test categories is within acceptable limits.

b.

C.

d.
e.

It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.

2. WALK-THROUGH (CATEGORY A & B) CRITERIA
a.

Each JPM includes the following, as applicable:

. initial conditions

  • initiating cues

. references and tools, including associated procedures

. reasonable and validated time limits (average time allowed for completion) and specific

' specific performance criteria that include:

designation if deemed to be time critical by the facility licensee

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b.

The prescripted questions in Category A are predominantly open reference and meet the criteria in Attachment 1 of ES-301.

Repetition from operating tests used during the previous licensing examination is within acceptable limits (30% for the walk-through) and do not compromise test integrity.

C.

d.

At least 20 percent of the JPMs on each test are new or significantly modified.

3. SIMULATOR (CATEGORY C) CRITERIA
a.

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-3014 and a copy is attached.

Printed Name / Signature

a. Author
b. Facility Reviewer(*)
c. NRC Chief Examiner (#)
d. NRC Supervisor J

Test Number:

P Date NOTE:

The facility signature is not applicable for NRCdeveloped tests.

  1. Independent NRC reviewer initial items in Column "c;" chief examiner concurrence required.

I I

I 23 of 26 NUREG-1021, Revision 8, Supplement 1

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 I

TARGET QUANTITATIVE AlTRlBUTES (PER SCENARIO; SEE SECTION D.4.D)

1.

Total malfunctions (5-8)

2.
3.

Abnormal events (24)

4.

Major transients (1-2)

Malfunctions after EOP entry (1-2)

5.
6.

EOPs enteredlrequiring substantive actions (1-2)

EOP contingencies requiring substantive actions (0-2)

7.

Critical tasks (2-3)

CJ Actual Attributes 2

3 b / 6 t 6 / %

3 121rjL L I ] I / / j 3 19 I2 13 1

I I 1 1 1 1 3

1 2 1 2 1 2 4 I Y I y / 5 I Facildy:

I c A 5, //e Date of Exam: s//

q/b 3 Scenario Numbers: f 12 131 $bpe I

QUALITATIVE ATTRIBUTES NUREG-I 021, Revision 8, Supplement 1 24 of 26 ting Test No.: 1 Initials 1

1 I

As SRO SRO-U Instructions: (I)

(2)

(3)

Whenever ractical, both instrument and component malfunctions should Enter the operating test number and Form ES-D-1 event numbers for each evolution type.

Reactivity manipulations may be conducted under normal or contro//ed abnormal conditions (refer to Section D.4.d) but must be significant per Section C.2.a of Appendix D.

to the applicants competence count toward the minimum requirement be include cp ; only those that require verifiable actions that provide insi ht Author:

Reactivity 0

Normal 1

Z 1

2 2

Major 1

7-y 7-9 7-f 8 - / O Instrument /

2 3-6 3-6 3 4 3 -7 Component Reactivity 0

Normal 1

L

/

z z

Major 1

1,g 1-4 7-8 g-10 3 - d 3 4 3-6 3-7 Instrument /

2 Component NRC Reviewer: -&4 I

25 of 26 NUREG-1021, Revision 8, Supplement 1

a 1

ES-301 Form ES-301-6 SCENARIO I

I I

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Circle the applicant's license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

Author:

NRC Reviewer:

'I/

NUREG-1021, Revision 8, Supplement 1 26 of 26

-J i

ES-401 Written Examination Form ES-40 1-7 Quality Checklist Facility: A A.fa //e Date of Exam: 5/t 3/03 Exam Level: R O G I I Initial Item Description

1.
2.
3.
4.

Questions and answers technically accurate and applicable to facility

a. NRC WAS referenced for all questions
b. Facility learning objectives referenced as available RO/SRO overlap is no more than 75 percent, and SRO questions are appropriate per Section D.2.d of ES-401 Question selection and duplication from the last two NRC licensing exams appears consistent with a systematic sampling process Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started: or

__ the examinations were developed independently: or the licensee certifies that there is no duplication: or other (explain)

5.

a

6.

Bank use meets limits (no more than 75 Bank Modified New percent from the bank at least 10 percent new, distribution at right the exam lincludina 10 new auestions) are e -

and the rest modified): enter the actual

7.

Between 50 and 60 percent of the questions on Memory CIA written at the com~rehensio~/analysislevel; enter the actual question distribution at right

3.

References/handouts provided do not give away answers

3.

Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned: deviations are justified Question psychometric quality and format meet ES, Appendix B, guidelines

10.

I 1 1.

The exam contains 100, one-point, multiple choice items; the total is correct and agrees with value on cover sheet

3. Author I. Facility Reviewer (*)
. NRC Chief Examiner (#)
1. NRC Regional Supervisor Jote:
  • The facility reviewers initialslsignature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column c: chief examiner concurrence required.

NUREG-1021, Revision 8, Supplement 1 42 of 46

ES-401 Written Exam in at ion Form ES-401-7 Quality Checklist Facility: La sa//e Date of Exam: 5/23/03 I Item Description

1.
2.
3.
4.

Questions and answers technically accurate and applicable to facility

a. NRC WAS referenced for all questions
b. Facility learning objectives referenced as available RO/SRO overlap is no more than 75 percent, and SRO questions are appropriate per Section D.2.d of ES-401 Question selection and duplication from the last two NRC licensing exams appears consistent with a systematic sampling process Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started; or the examinations were developed independently; or the licensee certifies that there is no duplication; or

5.
8.
9.

References/handouts provided do not give away answers Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are justified Question psychometric quality and format meet ES, Appendix B, guidelines The exam contains 100, one-point, multiple choice items; the total is correct and agrees with value on cover sheet IO.

11.
am Level: ~

R C

a. Author
3. NRC Chief Examiner (#)
j. NRC Regional Supervisor
5. Facility Reviewer (*)

Vote:

  • The facility reviewers initialdsignature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

NUREG-1021, Revision 8, Supplement 1 42 of 46

4 ES-403 Written Examination Grading Form ES-403-1 Quality Checklist

6.

Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants

?-

Facility:

Date of Exam:

Exam Level: RO/SRO I

Item Description a

i

1.

Clean answer sheets copied before grading

+L l i /

I

2.

Answer key changes and question deletions justified and documented

3.

Applicants' scores checked for addition errors (reviewers spot check > 25% of examinations)

Grading for all borderline cases (80% +I-2%) reviewed in detail All other failing examinations checked to ensure that grades are justified

" - P/a

).a\\

4.
5.
b. Facility Reviewer(*)
c. NRC Chief Examiner (*)

(*)

The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

5 of 5 NUREG-1021, Revision 8, Supplement 1