Clarification to NRC Bulletin 2003-01: Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors-60 Day Response
ML032330409
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/13/2003
From: Cooper D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-03-001
Download: ML032330409 (2)


Text

Come lNubeerExce Palisades Nuclear Plant Operated by Nuclear Management Company, LLC August 13, 2003 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 PALISADES NUCLEAR PLANT DOCKET 50-255 LICENSE No. DPR-20 CLARIFICATION TO THE NUCLEAR REGULATORY COMMISSION BULLETIN

-2003-OPOTENALMPCTIUVF1EBRISOCKAGE EMERGENCY SUP -

RECIRCULATION AT PRESSURIZED-WATER REACTORS DAY RESPONSE By letter dated August 5, 2003, Nuclear Management Company, LLC (NMC) provided the 60-day response to the Nuclear Regulatory Commission (NRC)

Bulletin (BL) 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors."

NMC is providing a clarification to the Palisades BL 2003-01 response. A minor error was discovered in the first paragraph on the top of page 4 of the attachment. The paragraph read, as follows:

Implementation Schedule: Preliminary assessment by NMC, in consultation with the Westinghouse Owners Group (WOG), indicates that this change, with regards to securing high pressure safety injection (HPSI) and low pressure safety injection (LPSI) pumps prior to recirculation, may have an adverse effect on plant safety by substituting manual actions for existing automatic actions. These automatic actions introduce a potential for a single active failure vulnerability."

CTo-larfytheparagrap-shouldave-rea---

implementation Schedule: Preliminary assessment by NMC, in consultation with the Westinghouse Owners Group (WOG), indicates that this change, with regards to securing high pressure safety injection (HPSI) and low pressure safety injection (LPSI) pumps prior to recirculation, may have an adverse effect on plant safety by substituting manual actions for existing automatic actions. These manual actions introduce a potential for a single active failure vulnerability."

27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 269.764.2000 A'0 7

Page 2 NMC does not consider this change substantive, as this change does not affect any of the conclusions or commitments that were made in the BL response.

This letter contains no new commitments.

Douglas E. Coper Site Vice-President, Palisades Nuclear Plant