.0. * -

i4 Nuclear Operating Company Soigh 1rowRqed a-ak a bStatio PO lo 28r 9 fibr rff. kw 77483 August 14,2003 NOC-AE-03001583 10CFR26.71(d)

STI: 31645180 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket No. STN 50-498, STN 50-499 Semiannual Fitness for Duty Program Performance Report for the First Half of 2003 Pursuant to IOCFR26.71(d), STP Nuclear Operating Company (STPNOC) submits the attached Semiannual Fitness for Duty (FFD) Program Performance Report for the first half of 2003.

This report covers the period from January 1, 2003 through June 30, 2003.

If you should have any questions on this matter, please contact Ms. Lisa Matula at (361) 972-7444 orme at (361) 972-7694.

Jonn

Manager, Compensation/Benefits

& HRIS MKJ/

Attachment:

Semiannual FFD Program Performance Report for the First Half of 2003 wpW=Jnr-ap~rrcp-2003\\ 03001583.doc

b w

NOC-AE-03001583 Page 2 of 2 cc:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MNI 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

.- I Attachment NOC-AE-03001583 Page 1 of 2 STP NUCLEAR OPERATING COMPANY SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE REPORT January 1, 2003 through June 30, 2003 During the first performance period of 2003, the STPNOC FFD Program conducted a total of 1399 FFD screening tests that resulted in 17 positive test results. Sixteen positives were comprised of short-term contractors. The other positive was a licensee employee. STPNOC conducted 533 random tests resulting in a random testing rate of 64% of the average annual population as of June 30, 2003.* STP tests at an annual random testing rate of 50%.

STPNOC did not have any 10CFR26.73 reportable events during the performance period.

Breakdown of Confirmed Positive Tests For Specific Substances Marijuana 50ng Cocaine Opiates Amphetamines Phencyclidine Alcohol Refusal To Test Total Licensee 0

0 0

0 0

1 01 Employees Long Term 0

0 0

0 0

0 0

0 Employees Short 7

7 0

0 0

1 1

16 Term Employees Total 7

7 0

0 0

2 1

17

  • Note: STPNOC goal is to achieve an annual random testing rate of at least 50% at the end of 2003.

Attachment NOC-AE-03001583 Page 2 of 2 STP NUCLEAR OPERATING COMPANY FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 STP Nuclear Operating Company June 2003 Company Period end South Texas Project Electric Generating Station lceatlon Lisa H. Matula Supervisor 361-972-7444 Telephone Marijuana Cocaine Opiates Cutoff: Screen/Confirmation (uglml) 50/15 Amphetamine 300/150 Phencyclidine 300/300 Alcohol (°/cBAC) 1000/500 25/25

.04/.04 Testing Results Licensee Employees Long Term Contractor Short Term Contractor

-:Employees Employees Average #With Unescorted Access 1166 131 367 Categories

  1. Tested
  1. Positive

-# Tested

  1. Positive
  1. Tested
  1. Positive Pre-Access 3

0 6

0 837 15 Post Accident 1

1 0

0 2

0 Observed Behavior 0

0 0

0 2

0 Random 368 0

30 0

135 1

Follow-Up 11 0

0 0

2 0

Other 2

0 0

0 0

0 Total 0

385 1

36 0