ML032330240

From kanterella
Jump to navigation Jump to search
July 2003 Monthly Operating Report for Calvert Cliffs Nuclear Power Plant
ML032330240
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/15/2003
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032330240 (7)


Text

Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group August 15, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-3 18 July 2003 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.

Should you have questions, please contact Mr. Thomas S. O'Meara at (410) 495-6940.

Very truly yours, KJN/CAN/bjd Attachments cc:

J. Petro, Esquire J. E. Silberg, Esquire Director, Project Directorate I-1, NRC G. S. Vissing, NRC H. J. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR J. Wright, INPO K N. Larson, ANI

.r

G Lql

z OPERATING DATA REPORT

                                                              • t*****

Docket No. 50-317 Calvert Cliffs Unit 1 August 4, 2003 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

JULY 2003 845 825 Year-to-Date Cumulative to Date This month

1. NUMBER OF HOURS REACTOR WAS CRITICAL
2. HOURS GENERATOR ON LINE
3. UNIT RESERVE SHUTDOWN HOURS
4. NET ELECTRICAL ENERGY GENERATED(MWH) 744.0 744.0 0.0 631,896 5,087.0 5,087.0 0.0 4,397, 330 188,376.4 185,212.7 0.0 151,564,593

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - UI August 4, 2003 Herman 0. Olsen (410) 495-6734 REPORTING MONTH Jy 2003 NO.

DATE TYPE DURATION REASON' METHOD OF CAUSEICORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

' Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:

I - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other

DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 August 4, 2003

SUMMARY

OF OPERATING EXPERIENCE July 2003 The unit operated at 100% power for the entire month.

31 1%

OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 August 4, 2003 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP Y (NET Me)

JULY 2003 845 835 Year-Cumulative to-Date to Date This month

1.

NUMBER OF HOURS REACTOR WAS CRITICAL

2. HOURS GENERATOR ON LINE
3. UNIT RESERVE SHUTDOWN HOURS
4. NET ELECTRICAL ENERGY GENERATED(MWH) 744.0 744.0 0.0 638,338 3,494.0 181,053.8 3,460.5 179,165.2 0.0 0.0 2,967,872 147,554,302

UNrr smrrnowNs DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 August 4, 2003 Herman 0. Olsen (410) 495-6734 REPORT MONTH July 2003 NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

' Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other

DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 August 4, 2003

SUMMARY

OF OPERATING EXPERIENCE July 2003 The unit operated at 100% reactor power for the entire month.