July 2003 Monthly Operating Report for Perry, Unit 1
ML032320299
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/13/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2729L
Download: ML032320299 (3)


Text

FENOC Perry Nu RyMewcar Operal Cwpany F

August 13, 2003 PY-CEI/NRR-2729L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 ucla~nne~n.,owe.D1an4

_=____________

Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the July 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly-Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region Ell Administrator NRC Project Manager NRC Resident Inspector clear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081

OPERATING DATA REPORT UNIT:

Perry DATE:

8/7103

1.

Docket: 50440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period: July 2003

4.

Utility

Contact:

T. Phelps

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

1260

7.

Maximum Dependable Capacity (Net MWe):

1235

= ;

X ;-~~~This Month; --Ao--

8.

Hours Reactor was Critical 744.0 3.804.6 108,708.1

9.

Hours Generator On-Line 744.0 3.743.1 106.013A

10.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

11.

Net Electrical Energy (MWeH) 919.277.0 4.352.488.0 120.927.699.0 Page 1

"C i

II UNIT SHUTDOWNS REPORT MONTH - July 2003

!i DOOKET NO: 50-440 NAME: Peny Nuclear Power Plant DAT : 817/03 TELFPHONE: (440) 280-7660 No.

Date Type Duration Re Method Cause and Corrective to Prevent Recurrence I

Hours 2

3__

SUMMARY

The Perry Plant ran the entire month of Ju* 2003.
1. TYPE:
2. REASON:

1 F: Forced A - Equipment Failure (

lain)

S: Scheduled B - Maintenance or Test C - Refueling D - Regulatory E -Operating Training Ucense Examinatlor F - Administrative G - Operational Error (ei lain)

H - Other (explain)

3. METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 11 II