July 2003 Monthly Operating Report for Limerick
ML032320293
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/13/2003
From: Bryan Hanson
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, T.S. 6.9.1.6
Download: ML032320293 (4)


Text

Exekons Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 August 13, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for July 2003 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of July 2003 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, fyan C. Hanson Plant Manager AUQchments._.

cc:

H. Miller, Administrator, Region I, USNRC A. Burritt, LGS USNRC Senior Resident Inspector

, :Z',,, -

z,

o

,, J

,. '. I,.1.

1 , a n., ;.

I I I

.. -,

7 -: . 'i

  • 2 s -.-

b c

l

-11.

I I -.,

.7, 7
I,

.-"4, - ' -, -,

bcc:

R. DeGregorio - GML 5-1 B. Hanson - GML 5-1 C. Mudrick - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper - SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB 2-3 J. Toro - SMB 1-2 G. Lee - SSB 3-1 J. Grimes - KSA 2N J. Humphreys - KSA 3G D. Dyckman (PABRP) SSB 2-4

=~~~

Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 1 50-352 8/15/03 Greg Lee (610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-July 2003 I Design Electrical Rating (MWe-Net) 11191 I Maximum Dependable Capacity MWe-Net 1134

_Month Year to Date Cumulative Hours Reactor Critical (Hours)

I

- 744 5,025.1 134,893.5 Hours Generator On-Line (Hours) 744 -

4,999.

1 132,908.2 Unit Reserve Shutdown Hours (Hours) 0 0

0 A_

. irn w,-

--

f

,49-iz a 7fl

-I

-n -

4127 =77'rOA I*-.,a..

j~

I

  • g;

-*1*

y I...

  • fl I~

v I

,W,7 WI

  1. a,u 9.#I9 W-2r B.

UNIT SHUTDOWN i

M No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off__ne Duration (hrs)

None During July 2003

SUMMARY

Unit I began the month of July 2003 at 100% of rated thermal power (RTP).

On July 12m at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, reactor power was reduced to 93% RTP for channel bow testing.

On July 13 at 0213 hours0.00247 days <br />0.0592 hours <br />3.521825e-4 weeks <br />8.10465e-5 months <br />, reactor power was restored to 100% RTP.

Unit I ended the month of July 2003 at 100% RTP.

Type F-Forced S-Scheduled Reason Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/ULcense Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

.-H-Other-Expla

-n

=-

C. -

SAFETY/RELIEI VALVE OPERATION I

X I Date I Valves Actuated I No. & Type of Actuation -

Plant Condition I Description of Event I

I I None During July 2003 l

I l

Unit:

Limerick 2 Docket No:

50-353 Date:

8/15/03 Completed by: Greg Lee Telephone:

(610)718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-July 2003 Design Electrical Rating (MWe-Net) 1191 l

Maximum Dependable Capac (MWe-Net) 1134 l

Month Year to Date -

Cumulative Hours Reactor Critical (Hours) 7 744 4,649.6

-110,777.1 Hours Generator On-Une (Hours) 744 4,606.7 109,041.7 Unit Reserve Shutdown Hours (Hours) 0 i

Eahergi}~ 48 5,-209;5581

-L116,843,801 B. UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs) 7 T

~~~~~None During July 2003

SUMMARY

Unit 2 began the month of July 2003 at 100% of rated thermal power (RTP).

On July 19I at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br />, reactor power was reduced to 99% RTP for scram time testing. At 2314 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.80477e-4 months <br />, reactor power was restored to 100% RTP.

Unit 2 ended the month of July 2003 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/Ucense Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

-.CGEEI 1Y/

EEjAIYF B

O fVi-w,,AE Date Valves Actuated

'No. & Type of ActuationT Plant Condtion Description of Event I

I None During July 2003 1