Exekons Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 August 13, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Monthly Operating Report for July 2003 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of July 2003 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, fyan C. Hanson Plant Manager AUQchments._.
cc:
H. Miller, Administrator, Region I, USNRC A. Burritt, LGS USNRC Senior Resident Inspector
, :Z',,, -
z,
o
,, J
,. '. I,.1.
1 , a n., ;.
I I I
.. -,
7 -: . 'i
- 2 s -.-
b c
l
-11.
I I -.,
- .7, 7
- I,
.-"4, - ' -, -,
bcc:
R. DeGregorio - GML 5-1 B. Hanson - GML 5-1 C. Mudrick - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper - SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB 2-3 J. Toro - SMB 1-2 G. Lee - SSB 3-1 J. Grimes - KSA 2N J. Humphreys - KSA 3G D. Dyckman (PABRP) SSB 2-4
=~~~
Unit:
Docket No:
Date:
Completed by:
Telephone:
Limerick 1 50-352 8/15/03 Greg Lee (610) 718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-July 2003 I Design Electrical Rating (MWe-Net) 11191 I Maximum Dependable Capacity MWe-Net 1134
_Month Year to Date Cumulative Hours Reactor Critical (Hours)
I
- 744 5,025.1 134,893.5 Hours Generator On-Line (Hours) 744 -
4,999.
1 132,908.2 Unit Reserve Shutdown Hours (Hours) 0 0
0 A_
. irn w,-
--
f
,49-iz a 7fl
-I
-n -
4127 =77'rOA I*-.,a..
j~
I
- g;
-*1*
y I...
- fl I~
v I
,W,7 WI
- a,u 9.#I9 W-2r B.
UNIT SHUTDOWN i
M No.
Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)
Off__ne Duration (hrs)
None During July 2003
SUMMARY
Unit I began the month of July 2003 at 100% of rated thermal power (RTP).
On July 12m at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, reactor power was reduced to 93% RTP for channel bow testing.
On July 13 at 0213 hours0.00247 days <br />0.0592 hours <br />3.521825e-4 weeks <br />8.10465e-5 months <br />, reactor power was restored to 100% RTP.
Unit I ended the month of July 2003 at 100% RTP.
Type F-Forced S-Scheduled Reason Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/ULcense Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
.-H-Other-Expla
-n
=-
C. -
SAFETY/RELIEI VALVE OPERATION I
X I Date I Valves Actuated I No. & Type of Actuation -
Plant Condition I Description of Event I
I I None During July 2003 l
I l
Unit:
Limerick 2 Docket No:
50-353 Date:
8/15/03 Completed by: Greg Lee Telephone:
(610)718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-July 2003 Design Electrical Rating (MWe-Net) 1191 l
Maximum Dependable Capac (MWe-Net) 1134 l
Month Year to Date -
Cumulative Hours Reactor Critical (Hours) 7 744 4,649.6
-110,777.1 Hours Generator On-Une (Hours) 744 4,606.7 109,041.7 Unit Reserve Shutdown Hours (Hours) 0 i
Eahergi}~ 48 5,-209;5581
-L116,843,801 B. UNIT SHUTDOWN No.
Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)
Off-line Duration (hrs) 7 T
~~~~~None During July 2003
SUMMARY
Unit 2 began the month of July 2003 at 100% of rated thermal power (RTP).
On July 19I at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br />, reactor power was reduced to 99% RTP for scram time testing. At 2314 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.80477e-4 months <br />, reactor power was restored to 100% RTP.
Unit 2 ended the month of July 2003 at 100% RTP.
Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/Ucense Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
-.CGEEI 1Y/
EEjAIYF B
O fVi-w,,AE Date Valves Actuated
'No. & Type of ActuationT Plant Condtion Description of Event I
I None During July 2003 1
I I