Letter Sequence Other |
---|
|
|
MONTHYEARML0323105052003-08-11011 August 2003 Tech Spec Pages for Amendment Nos. 155 and 143, Replaces Central Power and Light Company (Cpl) with Aep Texas Central Company Throughout the Facility Operating License of Each Unit Project stage: Other ML0323006732003-08-11011 August 2003 License Amendment Nos. 155 and 143, Replaces Central Power and Light Company (Cpl) with Aep Texas Central Company Throughout the Facility Operating License of Each Unit Project stage: Other 2003-08-11
[Table View] |
|
---|
Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23089A2042023-03-30030 March 2023 License Amendment Request to Revise Alternative Source Term Dose Calculation ML22221A2122022-08-0909 August 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21252A7582021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21222A2272021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications ML20253A0462020-09-29029 September 2020 Issuance of Amendment Nos. 220 and 205 to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20266H8192020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen ML20134K7582020-05-13013 May 2020 License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures NOC-AE-20003734, License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures2020-05-13013 May 2020 License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures ML20090B7452020-03-30030 March 2020 License Amendment Request for Revise South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-20003712, License Amendment Request for Revise South Texas Project Electric Generating Station (STPEGS) Emergency Plan2020-03-30030 March 2020 License Amendment Request for Revise South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. NOC-AE-18003604, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process2019-05-0101 May 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process NOC-AE-18003583, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item ...2018-09-27027 September 2018 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item ... NOC-AE-17003529, License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating)2018-03-27027 March 2018 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) NOC-AE-17003510, License Amendment Request to Revise Technical Specifications for Administrative Changes and to Relocate Fxy Exclusion Zones to the Core Operating Limits Reports (Colrs)2017-09-18018 September 2017 License Amendment Request to Revise Technical Specifications for Administrative Changes and to Relocate Fxy Exclusion Zones to the Core Operating Limits Reports (Colrs) NOC-AE-16003406, License Amendment Request for Revision to Staffing and Staff Augmentation Times in the South Texas Project Electric Generating Station Emergency Plan2017-07-31031 July 2017 License Amendment Request for Revision to Staffing and Staff Augmentation Times in the South Texas Project Electric Generating Station Emergency Plan NOC-AE-17003459, Supplement to the License Renewal Application Re Aging Management Programs2017-04-19019 April 2017 Supplement to the License Renewal Application Re Aging Management Programs NOC-AE-16003403, Supplemental Information for the Review of the South Texas Project, Units 1 and 2, License Renewal - (TAC Nos. ME4936 and ME4937)2016-09-28028 September 2016 Supplemental Information for the Review of the South Texas Project, Units 1 and 2, License Renewal - (TAC Nos. ME4936 and ME4937) NOC-AE-16003385, 2016 Annual Update to the License Renewal Application2016-06-28028 June 2016 2016 Annual Update to the License Renewal Application NOC-AE-16003378, Additional Information for the Review of the License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)2016-05-31031 May 2016 Additional Information for the Review of the License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937) NOC-AE-16003351, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies2016-04-0707 April 2016 License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies NOC-AE-16003330, Transmittal of Information of Foreign Ownership, Control, or Influence (FOCI)2016-01-27027 January 2016 Transmittal of Information of Foreign Ownership, Control, or Influence (FOCI) NOC-AE-15003318, Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0909 December 2015 Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0303 December 2015 Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003307, Supplement - Error Correction - License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-11-11011 November 2015 Supplement - Error Correction - License Amendment Request for Extension of Containment Leakage Rate Testing Program NOC-AE-15003227, License Amendment Request for Extending the 10 Year ILRT to 15 Years2015-04-29029 April 2015 License Amendment Request for Extending the 10 Year ILRT to 15 Years NOC-AE-15003223, License Amendment Request: Proposed Revision to Updated Final Safety Analysis Report Table 15.6-172015-04-29029 April 2015 License Amendment Request: Proposed Revision to Updated Final Safety Analysis Report Table 15.6-17 NOC-AE-14003116, Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, Using the Consolidated Line Item Improvement Process2015-04-23023 April 2015 Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, Using the Consolidated Line Item Improvement Process NOC-AE-15003214, Response to Request for Additional Information Regarding License Amendment Request for Emergency Action Level Scheme Change2015-02-11011 February 2015 Response to Request for Additional Information Regarding License Amendment Request for Emergency Action Level Scheme Change ML14260A4372014-08-14014 August 2014 Project Units 1 & 2, License Amendment Request - Proposed Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report ML14164A3032014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 2 of 7 NOC-AE-14003087, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 7 of 72014-05-15015 May 2014 Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 7 of 7 ML14164A3082014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 5 of 7 ML14164A3002014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 1 of 7 ML14164A3112014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 3 of 7 ML14164A3182014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 6 of 7 ML14164A3142014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 4 of 7 NOC-AE-13003031, License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers.2014-01-0606 January 2014 License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers. ML13323A1852013-11-13013 November 2013 Enclosure 3 - License Amendment Request for STP Piloted Risk-Informed Approach to Closure for GSI-191 NOC-AE-13002962, License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability2013-07-23023 July 2013 License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability ML13175A2112013-06-19019 June 2013 Project, Units 1 and 2, Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 NOC-AE-12002915, Annual Update to the South Texas Project License Renewal Application2012-10-29029 October 2012 Annual Update to the South Texas Project License Renewal Application NOC-AE-12002877, Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2012-08-0101 August 2012 Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. ML11335A1402011-11-30030 November 2011 Annual Update to the South Texas Project License Renewal Application (TAC Nos. ME4936 and ME4937) NOC-AE-11002643, License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability2011-06-0202 June 2011 License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability NOC-AE-11002665, Proposed Amendment to Technical Specifications for Containment Post-Tensioning System Surveillance Program (Revision 2) (TAC ME3969/ME3970)2011-05-0202 May 2011 Proposed Amendment to Technical Specifications for Containment Post-Tensioning System Surveillance Program (Revision 2) (TAC ME3969/ME3970) 2023-03-30
[Table view] Category:Safety Evaluation
MONTHYEARML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) ML23279A0482023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 4 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Nonproprietary Safety Evaluation) ML23015A0012023-02-0606 February 2023 Issuance of Amendment Nos. 225 and 210 to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22300A2492022-12-0606 December 2022 Approval for Alternate Disposal Procedures for Very Low-Level Radioactive Material (EPID: L?2021?LLL?0022) ML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML21319A3552021-12-0909 December 2021 Issuance of Amendment Nos. 224 and 209 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index NUREG-0654, Correction to Amendment Nos. 221 and 206 to Authorize Revision of the Emergency Plan Based on NUREG-0654/FEMA-REP-1, Revision 22021-05-11011 May 2021 Correction to Amendment Nos. 221 and 206 to Authorize Revision of the Emergency Plan Based on NUREG-0654/FEMA-REP-1, Revision 2 ML21033A2392021-04-0808 April 2021 Issuance of Amendment Nos. 222 and 207 to Revise Technical Specifications to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML20253A0462020-09-29029 September 2020 Issuance of Amendment Nos. 220 and 205 to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML20199M1622020-07-21021 July 2020 Proposed Alternatives PRR-01, PRR-02, PRR-03, and PRR-04 to the Requirements of the ASME OM Code (Epids L-2020-LLR-0007 to L-2020-LLR-0010) ML20141L6122020-05-28028 May 2020 Issuance of Amendment No. 219 to Revise Technical Specifications to Reduce Safety Injection Accumulators Minimum Pressures (Exigent Circumstances) ML19322A7192019-12-0909 December 2019 Issuance of Amendment Nos. 218 and 204 to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML19217A0602019-10-24024 October 2019 Issuance of Amendment Nos. 217 and 203 Revision to Technical Specification Tables to Change Terminology for the P-13 Permissive Interlock Description ML19213A1472019-08-20020 August 2019 Issuance of Amendment Nos. 216 and 202 Standby Diesel Generator Surveillance Requirements ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML18128A3422018-06-0707 June 2018 Issuance of Amendment Nos. 213 and 199 to Revise TSs for Administrative Changes and to Relocate Fxy Exclusion Zones to the Colrs(Cac Nos. MG0253 and MG0254, EPID-L-2017-LLA-0300) ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML17019A0022017-07-11011 July 2017 Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16319A0102016-12-21021 December 2016 Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13221A0042013-09-0909 September 2013 Issuance of Amendment Nos. 201 and 189, Revise TS 5.0, Design Features, to Reflect Removal of Visitor'S Center Building and References to Emergency Operations Facility ML13142A1602013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13008A5282013-04-25025 April 2013 Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval ML13007A1362013-01-31031 January 2013 Review of Operations Quality Assurance Plan, Revision 20 ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 ML12152A2452012-08-14014 August 2012 Issuance of Amendment Nos. 199 and 187, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1124402222011-11-17017 November 2011 Issuance of Amendment Nos. 198 and 186, Revise Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlo Cladding ML1126500712011-10-14014 October 2011 Relief Request RR-ENG-3-05, from Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds for Third 10-Year Inservice Inspection ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval 2023-02-06
[Table view] |
Text
August 11, 2003 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS ON NAME CHANGE AND APPLICATION FOR CONFORMING ADMINISTRATIVE LICENSE AMENDMENTS (TAC NOS. MB8483 AND MB8484)
Dear Mr. Sheppard:
The Commission has issued the enclosed Amendment No. 155 to Facility Operating License No. NPF-76 and Amendment No. 143 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2, respectively. The amendments consist of changes to the Facility Operating Licenses (FOLs) in response to your application dated March 31, 2003.
The amendments replace "Central Power and Light Company (CPL)" with "AEP Texas Central Company" throughout the FOL of each unit. This reflects the agreement that CPL entered into, transferring rights to use the name of the other company.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Mohan Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
- 1. Amendment No. 155 to NPF-76
- 2. Amendment No. 143 to NPF-80
- 3. Safety Evaluation cc w/encls: See next page
Mr. James J. Sheppard August 11, 2003 President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS ON NAME CHANGE AND APPLICATION FOR CONFORMING ADMINISTRATIVE LICENSE AMENDMENTS (TAC NOS. MB8483 AND MB8484)
Dear Mr. Sheppard:
The Commission has issued the enclosed Amendment No. 155 to Facility Operating License No. NPF-76 and Amendment No. 143 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2, respectively. The amendments consist of changes to the Facility Operating Licenses (FOLs) in response to your application dated March 31, 2003.
The amendments replace "Central Power and Light Company (CPL)" with "AEP Texas Central Company" throughout the FOL of each unit. This reflects the agreement that CPL entered into, transferring rights to use the name of the other company.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Mohan Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
- 1. Amendment No. 155 to NPF-76
- 2. Amendment No. 143 to NPF-80
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC PDIV-1 r/f G. Hill (4)
RidsNrrDlpmLpdiv (H. Berkow) RidsNrrPMMThadani RidsNrrLAMMcAllister RidsNrrDripRorp(SMagruder) RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (B. Johnson) MDusaniwsky RidsNrrPMNKalyanam RidsNrrDlpmPdivLpdiv1(RGramm) RidsOpaMail ACCESSION NO: ML032300673 *No legal objection OFFICE PDIV-1/PM PDIV-1/PM PDIV-1/LA DRIP/RPRP OGC* PDIV-1/SC NAME NKalyanam MThadani MMcAllister BThomas SUttal RGramm DATE 7/1/03 8/8/03 7/1/03 7/7/03 7/16/03 8/8/03 OFFICIAL RECORD COPY
STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-498 SOUTH TEXAS PROJECT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 155 License No. NPF-76
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by STP Nuclear Operating Company* acting on behalf of itself and for Texas Genco, LP, the City Public Service Board of San Antonio (CPS), AEP Texas Central Company, and the City of Austin, Texas (COA) (the licensees), dated March 31, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- STP Nuclear Operating Company is authorized to act for Texas Genco, LP, the City Public Service Board of San Antonio, AEP Texas Central Company, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
- 2. Accordingly, the license is amended as indicated in the attachment to the license amendment.
- 3. The license amendment is effective as of the date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License Date of Issuance: August 11, 2003
STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-499 SOUTH TEXAS PROJECT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 143 License No. NPF-80
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by STP Nuclear Operating Company* acting on behalf of itself and for Texas Genco, LP, the City Public Service Board of San Antonio (CPS), AEP Texas Central Company, and the City of Austin, Texas (COA) (the licensees), dated March 31, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- STP Nuclear Operating Company is authorized to act for Texas Genco, LP, the City Public Service Board of San Antonio, AEP Texas Central Company, and the City of Austin, Texas, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
- 2. Accordingly, the license is amended as indicated in the attachment to the license amendment.
- 3. The license amendment is effective as of the date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License Date of Issuance: August 11, 2003
ATTACHMENT TO LICENSE AMENDMENT NOS. 155 AND 143 FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 DOCKET NOS. 50-498 AND 50-499 Replace the following pages of Facility Operating License Nos. NPF-79 and NPF-80 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT FACILITY OPERATING LICENSE NPF-76 Page 1 Page 1 Page 2 Page 2 Page 3 Page 3 Page 4 Page 4 FACILITY OPERATING LICENSE NPF-80 Page 1 Page 1 Page 2 Page 2 Page 3 Page 3 Page 4 Page 4
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 155 AND 143 TO FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 STP NUCLEAR OPERATING COMPANY, ET AL.
SOUTH TEXAS PROJECT, UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499
1.0 INTRODUCTION
By application dated March 31, 2003, STP Nuclear Operating Company (STPNOC, the licensee), submitted a request to amend the Facility Operating Licenses (FOLs) NPF-76 and NPF-80 for South Texas Project Electric Generating Stations (STPEGS), Units 1 and 2, respectively.
The application was submitted by STPNOC, acting on behalf of itself and for Texas Genco, LP, the City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, Texas. The amendments change the operating license to reflect a change in the name of "Central Power and Light Company (CPL)," a licensed co-owner of the facility, to "AEP Texas Central Company (AEP)."
2.0 REGULATORY EVALUATION
Section 80(a) of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50) requires:
"No license for a production or utilization facility, or any right thereunder, shall be transferred, assigned, or in any manner disposed of, either voluntarily or involuntarily, directly or indirectly, through transfer of control of the license to any person, unless the Commission shall give its consent in writing."
The licensee for STPEGS is STPNOC acting on behalf of itself and for Texas Genco, LP, the City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, Texas. Effective December 23, 2002, CPL was renamed "AEP Texas Central Company," for ownership of 25.2 percent of STPEGS, Units 1 and 2. This change in the name of the licensee requires an amendment to the FOLs.
3.0 BACKGROUND
AEP is the parent company of CPL. Effective December 23, 2002, AEP sold the retail company portion of CPL to Centrica, and transferred the CPL name to Centrica as well. AEP renamed the remaining portions (generation and distribution interests) of CPL as "AEP Texas Central Company." According to the agreement with Centrica, use of CPL name by AEP must be phased out within six months of the effective date of the agreement.
4.0 TECHNICAL EVALUATION
Effective December 23, 2002, CPL was renamed as "AEP Texas Central Company." With the exception of this name change, this transaction does not in any way affect the qualifications of AEP Texas Central Company for ownership of 25.2 percent of STPEGS, Units 1 and Unit 2.
Further, this transaction does not involve any direct or indirect transfer of control of STPEGS Operating Licenses. The proposed amendment to replace the CPL name in the operating license with the new name AEP Texas Central Company is purely an administrative action and no substantive changes to the licensees arrangements or ability to own or decommission STPEGS will result from amending the license to reflect the name change.
As stated in the FOLs, STPNOC is technically qualified to engage in the activities authorized by the FOLs in accordance with the Commission's regulations set forth in 10 CFR Chapter I.
5.0
SUMMARY
The Nuclear Regulatory Commission (NRC) staff concludes that the proposed name change
- does not involve a transfer, direct or indirect, of the operating license for STPEGC.
- will not adversely affect the financial qualifications of CPL (to be renamed AEP) with respect to the ownership and decommissioning of STPEGC.
- there do not appear to be any problematic foreign ownership issues related to the proposed name change and associated transactions.
- will not affect the qualifications of CPL (to be renamed AEP) as one of the holders of the license appears to be consistent with applicable provisions of law, regulations, and orders issued by the Commission.
Therefore, the NRC staff concludes that the application to amend the license to reflect the name change is acceptable. Specifically, the NRC staff finds that pages 1, 2, 3, and 4 of FOLs NPF-76 and NPF-80 should be changed by replacing Central Power and Light Company (or variations thereof) with AEP Texas Central Company (or variations thereof).
The affected areas of the license are in the title and in paragraphs 1A, 2, 2A, 2B2, and 2C3 of the FOLs NPF-76 and NPF-80.
6.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendments. The State official had no comments.
7.0 ENVIRONMENTAL CONSIDERATION
Pursuant to 10 CFR 51.21, 51.32, AND 51.35, an environmental assessment and finding of no significant impact was published in the Federal Register on July 24, 2003, (68 FR 43766).
Accordingly, based upon the environmental assessment, the staff has determined that issuance of the amendments will not have a significant effect on the quality of the human environment.
8.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: N. Kalyanam Date: August 11, 2003
South Texas, Units 1 & 2 cc:
Mr. Cornelius F. OKeefe A. H. Gutterman, Esq.
Senior Resident Inspector Morgan, Lewis & Bockius U.S. Nuclear Regulatory Commission 1111 Pennsylvania Avenue, NW P. O. Box 910 Washington, DC 20004 Bay City, TX 77414 Mr. T. J. Jordan, Vice President A. Ramirez/C. M. Canady Engineering & Technical Services City of Austin STP Nuclear Operating Company Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth, TX 77483 Austin, TX 78704 S. M. Head, Manager, Licensing Mr. L. K. Blaylock Nuclear Quality & Licensing Department Mr. W. C. Gunst STP Nuclear Operating Company City Public Service Board P. O. Box 289, Mail Code: N5014 P. O. Box 1771 Wadsworth, TX 77483 San Antonio, TX 78296 Environmental and Natural Resources Mr. C. A. Johnson/A. C. Bakken Policy Director AEP Texas Central Company P. O. Box 12428 P. O. Box 289 Austin, TX 78711-3189 Mail Code: N5022 Wadsworth, TX 77483 Jon C. Wood Matthews & Branscomb INPO 112 East Pecan, Suite 1100 Records Center San Antonio, TX 78205 700 Galleria Parkway Atlanta, GA 30339-3064 Arthur C. Tate, Director Division of Compliance & Inspection Regional Administrator, Region IV Bureau of Radiation Control U.S. Nuclear Regulatory Commission Texas Department of Health 611 Ryan Plaza Drive, Suite 400 1100 West 49th Street Arlington, TX 76011 Austin, TX 78756 D. G. Tees/R. L. Balcom Brian Almon Texas Genco, LP Public Utility Commission P. O. Box 1700 William B. Travis Building Houston, TX 77251 P. O. Box 13326 1701 North Congress Avenue Judge, Matagorda County Austin, TX 78701-3326 Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 May 2003
South Texas, Units 1 & 2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109