Notification of Pending Changes to the Emergency Response Data System
ML032270451
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/08/2003
From: Hovey R
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RHLTR: #03-0056
Download: ML032270451 (2)


Text

Z . E~~~~~xe Io n SM Exelon Generation www.exeloncorp.com NuElear Dresden Generating Station 6500 North Dresden Road Monis, IL 60450-9765 Tel 815-942-2920 10 CFR 50 Appendix E August 8, 2003 RHLTR: #03-0056 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Dresden Nuclear Power Station, Units 2, and 3 Facility Operating License Nos. DPR-19, and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Notification of Pending Changes to the Emergency Response Data System In accordance with Subsection 3.b of 10 CFR 50 Appendix E Section VI, uEmergency Response Data System," Exelon Generation Company, LLC (EGC) is providing notification of pending changes to the Emergency Response Data System (ERDS) that could potentially affect ERDS transmission format or computer protocol. Currently, the ERDS program transmits data collected and formatted by the Point History program with data retrieved from the station process computer. A revised ERDS interface program has been developed that will collect and format data from another program, the Process Book (PI) data historian, which receives data from the process computer. The process computer will send its data to the PI data historian for subsequent transmission via ERDS. None of the existing data points transmitted by ERDS will be modified.

Additionally, the computer protocol has been upgraded to meet the requirements of NUREG 1394, NEmergency Response Data System (ERDS) Implementation, "Section II.B.1," Data Transmission."

The interface program is being initially tested in a computer lab with subsequent live transmission testing to follow. Implementation at Dresden Nuclear Power Station for both Units 2 and 3 is scheduled for October 1,2003.

Should you have any questions regarding this report, please contact Mr. Jeff Hansen, Regulatory Assurance Manager at (815) 416-2800.

Respectfully, R. J. Hovey Site Vice President Dresden Nuclear Power Station Enclosure cc: Regional Administrator - Region IlIl NRC Senior Resident Inspector - Dresden Nuclear Power Station