7/29/2003, Fort Calhoun, Unit 1,Summary of Conference Call with Omaha Public Power District Fire Protection Exemption for Fire Area 32
ML032260124
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/14/2003
From: Wang A
NRC/NRR/DLPM/LPD4
To: Stephen Dembek
NRC/NRR/DLPM/LPD4
Wang A, NRR/DLPM, 415-1445
References
TAC MB6746
Download: ML032260124 (2)


Text

August 14, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Alan Wang, Project Manager, Section 2 /RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON JULY 29, 2003, WITH OMAHA PUBLIC POWER DISTRICT (OPPD) REGARDING THEIR FIRE PROTECTION EXEMPTION FOR FIRE AREA 32 (TAC NO. MB6746)

On July 29, 2003, representatives of OPPD had a teleconference with the staff (Plant Systems and Probabilistic Safety Assessment branches and Projects) to discuss OPPDs exemption request for fire area 32 for the Fort Calhoun Station, Unit 1 (FCS). OPPD provided a short history of the issue. This exemption is needed as a result of a January 2000 Trienniel Fire Protection Team Inspection which resulted in a Notice of Violation. The licensee contested the violation twice. They were denied and subsequently proposed a clarification to the exemption, which was also denied. After a request for additional information and several telecons, the staff informed OPPD that we were considering denying the exemption based on the fire analyses provided to date. As a result of this possible decision, the licensee proposed this teleconference to express their concerns that the staff did not have a full appreciation of the configuration of fire area 32 and the fire hazard analyses that had been provided. The staff noted that based on our review of the deterministic analyses, fire area 32 was marginal in meeting various safety criteria and that the probabilistic risk assessment (PRA) arguments were not of sufficient detail. OPPD agreed that the PRA was lacking, but noted that it was not their intention to provide a risk-based argument, only a risk-informed submittal. OPPD proposed a site visit to help clear up some of these misunderstandings. Suzanne Black (Director, Division of Systems Safety and Analysis) noted that we want to provide OPPD a fair opportunity to make their case and that the staff will support this site visit. OPPD has proposed a two-day meeting either the first or second week of September 2003 at the site. OPPD has also agreed to withdraw its November 8, 2002, exemption request and resubmit the exemption request to clarify their position regarding the use of PRA. This would be done prior to the site visit. The staff agreed that we would provide an agenda for the visit to clarify our areas of interest.

An attendance list is provided in the attachment.

Docket No. 50-285

Attachment:

Attendees of Teleconference

ML032260124

  • See Previous Concurrence NRC-001 OFFICE PDIV-2/PM PDIV-2/LA SPSB/BC PDIV-2/SC NAME AWang EPeyton JHannon
  • SDembek DATE 8/12/03 8/12/03 8/6/03 8/14/03 DOCUMENT NAME: G:\PDIV-2\FortCalhoun\TELESummary 7-29FA32.wpd ATTENDEES TELECONFERENCE WITH OMAHA PUBLIC POWER DISTRICT EXEMPTION FOR FIRE AREA 32 JULY 29, 2003 OMAHA PUBLIC POWER DISTRICT Gary Cavanaugh Jim McMagnus NRC Suzanne Black Mike Johnson John Hannon Mike Tschiltz Phil Qualls Naeem Iqbal Stephen Dinsmore Alan Wang