ML032260031

From kanterella
Jump to navigation Jump to search
NRC Ltr Dated 08/13/2003 - Requalification Program Inspection - Millstone Nuclear Generating Station Unit 3
ML032260031
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/13/2003
From: Conte R
NRC/RGN-I/DRS/OSB
To: Christian D
Dominion Resources
Shared Package
ML032250065 List:
References
Download: ML032260031 (3)


Text

August 13, 2003 Mr. David A. Christian, Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - MILLSTONE NUCLEAR GENERATING STATION UNIT 3

Dear Mr. Christian:

In a telephone conversation on August 12, 2003, Mr. Alan Blamey, Senior Examiner/Inspector, and Mr. Tim Kulterman, Supervisor, Unit 3 Licensed Operator Requalification, made arrangements for the NRC to inspect the licensed operator requalification program at the Millstone facility. The inspection is planned for the week of September 22, 2003, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the examination schedule, sample plan, and operating tests scheduled for the week of the inspection to the NRC by September 15, 2003. Mr. Kultermen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003, but has been extended.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Mr. David A. Christian 2 Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Alan Blamey at (610) 337-5366.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos. 50-423 License Nos. NPF-49 cc w/encl:

J. A. Price, Site Vice President - Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Acting Manager - Licensing L. M. Cuoco, Senior Counsel V. Juliano, Waterford Library S. Comley, We The People J. Buckingham, Department of Public Utility Control E. Wilds, Director, State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN J. Besade, Fish Unlimited G. Winslow, Citizens Regulatory Commission (CRC)

J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC R. Shadis, New England Coalition Staff W. Meinert, Massachusetts Municipal Wholesale Electric Company C. Brinkman, Manager, Washington Nuclear Operations

Mr. David A. Christian 3 Distribution w/encl: <VIA E-MAIL>:

Region I Docket Room (with concurrences)

S. Schneider, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA J. Jolicoeur, OEDO J. Clifford, NRR R. Ennis, PM, NRR G. Wunder, Backup PM, NRR V. Nerses, PM, NRR B. McDermott, RI K. Jenison, RI A. Blamey DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

R. Conte, DRS DRS Files DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032260031.wpd ADAMS PKG: ML032250065 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker ceo for ABlamey RConte DATE 08/12/03 08/12/03 08/13/03 08/ /03 08/ /03 OFFICIAL RECORD COPY