ML032250107
| ML032250107 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/04/2003 |
| From: | Zwolinski J Indiana Michigan Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:3071-03 | |
| Download: ML032250107 (4) | |
Text
Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER August 4, 2003 AEP:NRC:3071-03 10 CFR 26.7 1(d)
Docket Nos:
50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 10 CFR PART 26, FITNESS FOR DUTY PROGRAMS In accordance with 10 CFR 26.71(d), Donald C. Cook Nuclear Plant hereby submits Fitness for Duty Program performance data for the six-month period of January 1, 2003, to June 30, 2003. Attached are the performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted, and a summary of management actions.
There are no new commitments in this submittal.
Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.
Sincerely, John \\.Zwolinski Director of Design Engineering and Regulatory Affairs DB/rdw Attachment c:
J. L. Caldwell, NRC Region III K. D. Curry, Ft. Wayne AEP, w/o attachment J. T. King, MPSC, w/o attachment MDEQ - WHMD/HWRPS, w/o attachment NRC Resident Inspector Mohammed Shuaibi, NRC Washington, DC
U. S. Nuclear Regulatory Commission AEP:NRC:3071-03 Page 2 bc:
A. C. Bakken III, w/o attachment M. J. Finissi, w/o attachment D. W. Jenkins, w/o attachment J. A. Kobyra, w/o attachment B. A. McIntyre, w/o attachment J. E. Newmiller D. J. Poupard M. K. Scarpello, w/o attachment T. K. Woods, w/o attachment J. A. Zwolinski
Attachment to AEP:NRC:3071-03 Page I FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Indiana Michigan Power Co.
Company Cook Nuclear Plant. Bridgman. Michigan Location K. E. Burkett Contact Name 06/30/03 6 Month Ending (269) 466-3335 Phone Cutoffs: Screen/Confirmation (ng/ml)
Marijuana 50/15 Amphetamine Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC) 1 Appendix A to 10CFR26 1000/500 N/A N/A 25125 N/A N/A 0.04%
N/A N/A Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 1225 187 518 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 134 0
20 2
647 21 For-Cause 2
0 0
0 1
0 Post Accident For-Cause I
0 0
0 5
0 Observed Behavior Random 380 4
50 1
165 2
Follow-Up 25 0
l 0
54 3
Other 16 0
6 0
0 0
Total 558 4
77 3
872 26
Attachment to AEP:NRC:3071-03 Page 2 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Mar uana Cocaine Opiates Amphetamines Phencyclidene Alcohol Refiusal Marijuana Adulterated 50 100 To Test Suspect Specimen M
nig/ml Specimen Licensee 0
0 2
0 0
0 2
0 0
0 Employee Long-Term 1
2 0
0 0
0 0
0 0
0 Contractors Short-Term 3
4 4
0 2
0 6
0 8
0 Contractors Total 4
6 6
0 2
0 8
0 8
0 Total Confirmed Positive Tests For All Specific Substances, Refisals to Test, and Adulterated Specimens:
34 MANAGEMENT ACTIONS:
A meeting was held with laboratory, collection site, Medical Review Officer(s), Employee Assistance Program staff, and psychological assessment personnel to assure consistent and effective implementation of the Fitness for Duty Program.
APPEALS:
Four appeals were received during this reporting period.
EVENTS:
There was one event identified as 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reportable in accordance with 10 CFR 26.73 during this reporting period.
TEMPORARY SUSPENSIONS:
No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.