Ltr, Quality Assurance Program Request for Additional Information
ML032230030
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/11/2003
From: Rinaldi F
NRC/NRR/DLPM/LPD2
To: Beasley J
Southern Nuclear Operating Co
Rinaldi F, NRR/DLPM/LPD2-1, 415-1447
References
TAC MB9988, TAC MB9989
Download: ML032230030 (4)


Text

Mr. J. B. Beasley, Jr.

August 11, 2003 Vice President - Farley Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 RE: QUALITY ASSURANCE PROGRAM REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MB9988 AND MB9989)

Dear Mr. Beasley:

By letter dated July 8, 2003, Southern Nuclear Operating Company submitted a Quality Assurance Program change for the Joseph M. Farley Nuclear Plant, Units 1 and 2, regarding corrections to the Quality Assurance Q-List. The Nuclear Regulatory Commission staff has reviewed your request and have identified a need for additional information as discussed in the Enclosure. We discussed these issues with your staff and your staff has indicated that a response can be submitted by September 1, 2003.

Please contact Frank Rinaldi at (301) 415-1447, if you have any questions on these issues.

Sincerely,

/RA/

Frank Rinaldi, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

As stated cc w/encl: See next page

Mr. J. B. Beasley, Jr.

August 11, 2003 Vice President - Farley Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 RE: QUALITY ASSURANCE PROGRAM REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MB9988 AND MB9989)

Dear Mr. Beasley:

By letter dated July 8, 2003, Southern Nuclear Operating Company submitted a Quality assurance program change for the Joseph M. Farley Nuclear Plant, Units 1 and 2 regarding corrections to the Quality Assurance Q-List. The Nuclear Regulatory Commission staff has reviewed your request and have identified a need for additional information as discussed in the Enclosure. We discussed these issues with your staff and your staff has indicated that a response can be submitted by September 1, 2003.

Please contact Frank Rinaldi at (301) 415-1447, if you have any questions on these issues.

Sincerely,

/RA/

Frank Rinaldi, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC PDII-1 R/F FRinaldi CHawes JNakoski PPrescott DThatcher ADAMS ACCESSION NO. ML032230030 OFFICE PM:PDII-1 LA:PDII-1 SC:IEHB SC:PDII-1 NAME FRinaldi CHawes DThatcher JNakoski DATE 08/07/03 08/08/03 08/07/03 08/08/03 OFFICIAL RECORD COPY

Joseph M. Farley Nuclear Plant, Units 1 and 2 Updated Final Safety Analysis Report Quality Assurance Program Changes Evaluation Request for Additional Information 1.

Irradiation Sample Holders The Updated Final Safety Analysis Report (UFSAR), states on page 3.2-1, Section 3.2.1.1, "Definitions," that the seismic classification of structures, systems, and components is in accordance with Regulatory Guide (RG) 1.29. RG 1.29, "Seismic Design Classification," states that the reactor vessel internals are designated as Seismic Category I structures that should be designed to withstand a safe shutdown earthquake.

Item 1 in Enclosure 1 of your letter dated July 8, 2003, requests removal of the irradiation sample holder from the Farleys UFSAR Q-List. The bases for the acceptability of this change does not state any impact on other design requirements and codes classifications of the component, such as its Seismic Category I structure classification. Describe how other design requirements and/or code classifications, including commitments to RG 1.29, will be impacted and maintained following the implementation of the requested change.

2.

Pressurizer Spray Nozzles In UFSAR, Table 3.2-1, several design requirements, including codes and standards classifications, are listed for the entire pressurizer. For example, Table 3.2-1 states that the pressurizer is classified as meeting the American Society of Mechanical Engineers,Section III and seismic requirements. The NRC staff is unable to determine which pressurizer design requirements, including codes and standards classifications referenced in Table 3.2-1, are applicable to the spray nozzles. Describe which design requirements, including code and standards classifications are applicable to the pressurizer spray nozzles. Also, describe how these design requirements and/or code classifications will be impacted following the implementation of the requested change.

Enclosure

Joseph M. Farley Nuclear Plant cc:

Mr. Don E. Grissette General Manager -

Southern Nuclear Operating Company Post Office Box 470 Ashford, Alabama 36312 Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm Post Office Box 306 1710 Sixth Avenue North Birmingham, Alabama 35201 Mr. J. D. Woodard Executive Vice President Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, Alabama 36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company P. O. Box 470 Ashford, Alabama 36312