ML032200473

From kanterella
Jump to navigation Jump to search
NRC Letter Dated 8/8/03 - Requalification Program Inspection - Susquehanna Steam Electric Station, Units 1 and 2
ML032200473
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/08/2003
From: Conte R
NRC Region 1
To: Shriver B
Susquehanna
Shared Package
ML031960068 List:
References
Download: ML032200473 (3)


Text

August 8, 2003 Mr. Bryce L. Shriver Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

Dear Mr. Shriver:

In a telephone conversation on August 8, 2003, Mr. John G. Caruso, Senior Examiner/Inspector, and Mr. Bruce Stitt, Nuclear Operations Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Susquehanna facility. The inspection is planned for the week of October 20, 2003, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the examination schedule, sample plan, written examinations, and operating tests scheduled for the week of the inspection to the NRC by October 6, 2003.

Mr. Stitt has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Caruso at (610) 337-5389.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.

50-387/388 License Nos. NPF-14/NPF-22 cc w/encl:

J. H. Miller, President - PPL Generation, LLC R. L. Anderson, Vice President - Nuclear Operations for PPL Susquehanna LLC R. A. Saccone, General Manager - Nuclear Engineering A. J. Wrape, III, General Manager, Nuclear Assurance T. L. Harpster, General Manager - Plant Support K. Roush, Manager, Nuclear Training G. F. Ruppert, Manager, Nuclear Operations J. D. Shaw, Manager, Station Engineering T. P. Kirwin, Manager, Nuclear Maintenance R. M. Paley, Manager, Work Management Director, Bureau of Radiation Protection R. E. Smith, Jr., Manager, Radiation Protection W. F. Smith, Jr., Manager, Corrective Action & Assessments D. F. Roth, Manager, Quality Assurance R. R. Sgarro, Manager, Nuclear Regulatory Affairs R. Ferentz, Manager - Nuclear Security C. D. Markley, Supervisor - Nuclear Regulatory Affairs W. E. Morrissey, Supervising Engineer M. H. Crowthers, Supervising Engineer H. D. Woodeshick, Special Office of the President B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation R. W. Osborne, Allegheny Electric Cooperative, Inc.

Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee Supervisor - Document Control Services Commonwealth of Pennsylvania (c/o R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection)

W. M. Hunt, Manager, Nuclear Training Distribution:

Region I Docket Room (with concurrences)

S. Hansell, DRP - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA M. Shanbaky, DRP D. Florek, DRP S. Iyer, DRP J. Richmond, DRP - RI Susquehanna J. Jolicoeur, RI EDO Coordinator R. Laufer, NRR R. Guzman, NRR D. Collins, PM, NRR (Backup)

W. Lanning, DRS R. Crlenjak, DRS J. Caruso, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

L. Vick, HOHB, NRR DRS Files DOCUMENT NAME: G:\\OSB\\Caruso/SusqRequalAug03/60dayrpi.wpd ADAMS PKG: ML031960068 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker ceo for JCaruso RConte dms for DATE 08/08/03 08/08/03 08/08/03 08/ /03 08/ /03 OFFICIAL RECORD COPY