Reply to J. A. Stalls Response to Issuance of Orders to Modify Licenses for Revised Design Basis Threat and for Training and Physical Fitness Enhancements Applicable to Security Force Personnel (TAC Nos. MB9336, MB9337, MB9342, MB9353, MB93
ML032170380
Person / Time
Site: Saint Lucie, Seabrook, Turkey Point  NextEra Energy icon.png
Issue date: 09/25/2003
From: Marsh L
NRC/NRR/DLPM
To: Stall J
Florida Power & Light Co
Fretz R, NRR/DLPM, 415-1324
References
TAC MB9336, TAC MB9337, TAC MB9342, TAC MB9353, TAC MB9354, TAC MB9440, TAC MB9441, TAC MB9446, TAC MB9457, TAC MB9458
Download: ML032170380 (11)


Text

SAFEGUARDS INFORMATION September 25, 2003 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company 700 Universe Boulevard Juno Beach, FL 33408-0420

SUBJECT:

ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT AND FOR TRAINING AND PHYSICAL FITNESS ENHANCEMENTS APPLICABLE TO SECURITY FORCE PERSONNEL (TAC NOS. MB9336, MB9337, MB9342, MB9353, MB9354, MB9440, MB9441, MB9446, MB9457 AND MB9458)

Dear Mr. Stall:

On April 29, 2003, the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Orders modifying the operating licenses for St. Lucie Plant, Unit Nos. 1 and 2, Seabrook, Unit 1, and Turkey Point, Unit Nos. 3 and 4 to: (1) require compliance with a revised Design Basis Threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.

The Orders required that licensees respond to the Commission within thirty-five (35) days. By letters dated June 3, 2003, you submitted a response to the Orders for St. Lucie Plant, Unit Nos. 1 and 2, Seabrook, Unit 1, and Turkey Point, Unit Nos. 3 and 4. In your response to the Orders, you requested that the NRC provide clarification of five DBT-related issues described in the safeguards attachment to a letter from Mr. Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Diaz dated May 16, 2003. You specifically requested that the NRC provide further clarification associated with the NRCs use of force-on-force testing upon implementation of the revised safeguards contingency plans, security plans and security officer training and qualification plans. You requested a timely response from the Commission on this matter, since the Commissions clarifications may affect the manner of your compliance with the Orders.

SAFEGUARDS INFORMATION NOTICE: Enclosure 1 to this letter contains Safeguards Information. Upon separation from Enclosure 1, this letter and Enclosure 2 are DECONTROLLED.

J. Stall By letter dated July 18, 2003, Chairman Diaz replied to Mr. Colvins letter, providing the Commissions response and clarification on the five DBT-related issues. In response to your request, a copy of Chairman Diazs July 18, 2003, letter, including the safeguards attachment, is provided as Enclosure 1. Furthermore, I am including a list of guiding principles (Enclosure 2) that the NRC staff intends to follow when it reviews the revised security plans that will be submitted in response to the April 29, 2003, Orders. This information was previously shared with members of the Nuclear Energy Institute, and other industry representatives, during a meeting held on August 28, 2003.

Finally, in your letters dated June 3, 2003, you stated your understanding that the Commission intends to exercise enforcement discretion to accommodate issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of this Order. You further stated that you understood that the Commission would exercise enforcement discretion for the period necessary to resolve such issues, and to integrate the requirements of these Orders with the Order issued February 25, 2002, as well as with other pertinent regulatory requirements, and safeguards contingency plans, security plans and security officer training and qualification plans. The NRC staff is currently evaluating the enforcement-related aspects of implementing the Orders to determine the extent to which enforcement discretion is appropriate, and the NRC intends to clarify its policy on this matter in separate correspondence.

The NRC staff is reviewing your response to the Orders, and will reply to you with its determination of whether or not your response met the requirements of the Orders in separate correspondence.

Please contact Robert J. Fretz at 301-415-1324, if you have any other questions on these issues.

Sincerely,

/RA by ELeeds for/

Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-335, 50-389, 50-443, 50-250 and 50-251

Enclosures:

As stated cc w/o encls: See next page

J. Stall By letter dated July 18, 2003, Chairman Diaz replied to Mr. Colvins letter, providing the Commissions response and clarification on the five DBT-related issues. In response to your request, a copy of Chairman Diazs July 18, 2003, letter, including the safeguards attachment, is provided as Enclosure 1. Furthermore, I am including a list of guiding principles (Enclosure 2) that the NRC staff intends to follow when it reviews the revised security plans that will be submitted in response to the April 29, 2003, Orders. This information was previously shared with members of the Nuclear Energy Institute, and other industry representatives, during a meeting held on August 28, 2003.

Finally, in your letters dated June 3, 2003, you stated your understanding that the Commission intends to exercise enforcement discretion to accommodate issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of this Order. You further stated that you understood that the Commission would exercise enforcement discretion for the period necessary to resolve such issues, and to integrate the requirements of these Orders with the Order issued February 25, 2002, as well as with other pertinent regulatory requirements, and safeguards contingency plans, security plans and security officer training and qualification plans. The NRC staff is currently evaluating the enforcement-related aspects of implementing the Orders to determine the extent to which enforcement discretion is appropriate, and the NRC intends to clarify its policy on this matter in separate correspondence.

The NRC staff is reviewing your response to the Orders, and will reply to you with its determination of whether or not your response met the requirements of the Orders in separate correspondence.

Please contact Robert J. Fretz at 301-415-1324, if you have any other questions on these issues.

Sincerely,

/RA by ELeeds for/

Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-335, 50-389, 50-443, 50-250 and 50-251

Enclosures:

As stated cc w/o encls: See next page DISTRIBUTION:

PUBLIC RFretz DLPM Project Managers PD Reading Files VNerses DLPM Licensing Assistants TMarsh CRaynor A. Platchek, Region I CHolden DLPM Project Directors Loren R. Plisco, Region II JClifford DLPM Section Chiefs ACRS OGC

  • See previous concurrence OFFICE PDI-2/LPM PDI-2/LPM*

PDI-2/LA PDI-2/SC*

NAME RFretz VNerses CRaynor JClifford DATE 09/25/03 09/16/03 09/25/03 09/16/03 OFFICE OGC**

NSIR/DNS*

PDI/D*

DLPM/D NAME JGoldberg GTracy CHolden ELeeds for TMarsh DATE 08/26/03 09/17/03 09/16/03 09/25/03 OFFICIAL RECORD COPY

LETTER FROM NILS DIAZ, NRC CHAIRMAN, TO MR. JOE COLVIN, PRESIDENT AND CEO, NUCLEAR ENERGY INSTITUTE, DATED JULY 18, 2003

U.S. NUCLEAR REGULATORY COMMISSION STAFF GUIDING PRINCIPLES AND CRITERIA FOR CONDUCTING THE REVIEW OF REVISED PHYSICAL SECURITY PLANS, SAFEGUARDS CONTINGENCY PLANS, AND TRAINING AND QUALIFICATION PLANS PURPOSE:

To inform affected licensees of the criteria the U.S. Nuclear Regulatory Commission (NRC or the Commission) staff intends to adhere to in reviewing revisions made to site-specific Physical Security Plans, Safeguards Contingency Plans, and Training and Qualification Plans as a result of the nuclear security and safeguards-related Commission Orders dated February 25, 2002, January 7, 2003, and April 29, 2003.

DISCUSSION:

The information presented herein is intended to provide general information to licensees regarding the NRC staffs review criteria, but is not intended to be all-inclusive. The NRC staff is currently developing detailed criteria against which the revised site-specific plans will be reviewed for acceptance and approval. The NRC staff is also coordinating this effort with the Nuclear Energy Institute and industry working groups. Final review guidance will be developed no later than December 31, 2003.

GUIDING PRINCIPLES:

1.

Revised plans must comprehensively comply with all requirements of Orders (February 25, 2002; January 7, 2003; and April 29, 2003) except to the extent that a more stringent requirement is set forth in the licensees current plans.

2.

Revised plans must comprehensively comply with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, in particular, the plans must comply with Section 73.55, paragraphs (b) through (h) unless other alternative measures are explicitly approved by the NRC staff.

3.

Measures other than those in 10 CFR 73.55, paragraphs (b) through (h), may be approved by the staff if, and only if, they meet the objective of "high assurance" and provide a level of protection equivalent to that provided by paragraphs (b) through (h).

4.

Upon NRC approval of the revised plans and their full implementation, licensees may seek relaxation or rescission, in whole or in part, of the Interim Compensatory Measures (ICMs) provided in the Orders dated February 25, 2002.

5.

Subsequent to NRC approval of the revised plans, licensees may make changes to their revised plans, without prior NRC approval, in accordance with 10 CFR 50.54(p), i.e., if the changes would not decrease the effectiveness of the plans (plan changes may also be made in accordance with the provisions of 10 CFR 50.90, and 73.5).

6.

All licensee actions and activities which the staff deems essential, necessary, or important in complying with the Orders or 10 CFR 73.55 must be included in the plans and, therefore, will be enforceable.

ADDITIONAL GUIDANCE:

Consistent with guiding principles 1 and 2:



Pursuant to 10 CFR 73.55 and the DBT Orders, licensees must develop and implement an effective site-specific security system and organization that will protect against the threat capabilities of the revised DBT, satisfy the requirements of all the Orders, and comply with 10 CFR 73.55, paragraphs (b) through (h).



Each plan should clearly and specifically identify each Commission requirement that is to be complied with, or is intended to be satisfied, by each site-specific measure, procedure, policy, or action addressed in the plan.

Consistent with guiding principles 3 and 6:



While a licensee may identify a more efficient or effective method for satisfying a specific requirement of the Orders or 10 CFR 73.55, paragraphs (b) through (h), such site-specific measures, procedures, policies, or actions that are intended to be an alternative to a specific requirement of the Orders or 10 CFR 73.55, paragraphs (b) through (h), should be clearly and explicitly identified in each plan.



The NRC may authorize a licensee to provide alternative measures for protection against radiological sabotage other than those required by the Orders or 10 CFR 73.55, paragraphs (b) through (h), if:

a.

the licensee demonstrates that the proposed alternative measure has the same high-assurance objective specified by 10 CFR 73.55(a),

b.

the overall level of system performance provides protection against radiological sabotage equivalent to that which would be provided by compliance with the specific requirement of the Orders or 10 CFR 73.55, paragraphs (b) through (h),

for which the measure is an alternative, and c.

the plan contains sufficient detailed information to support an NRC staff conclusion that the proposed alternative measure is consistent with a. and b.

above through satisfying the intent of the specific requirement for which it is an alternative.



Where a licensee does not clearly and explicitly identify a site-specific measure, procedure, policy, or action as a proposed alternative to a specific Commission requirement, the NRC staff will conduct its review on the basis that the intent of the licensee is to comply with the specific requirement as written in the Orders or 10 CFR 73.55, paragraphs (b) through (h).

Consistent with guiding principle 4 and 5:



Upon NRC approval of the revised plans, or no later than October 29, 2004, licensees must, in accordance with the DBT Order, implement all site-specific measures, procedures, policies, actions, and alternatives, as written in each plan.



The NRC staff intends to provide timely information to all licensees regarding the possible use of enforcement discretion at a later date.

SUMMARY

The NRC intends to review and approve all revised site-specific plans between April 29 and October 29, 2004. If, for whatever reason, the NRC has not yet approved a revised site-specific plan by the full-implementation date, each licensee is, nonetheless, required to implement the revised plans in accordance with the DBT Order, no later than October 29, 2004.

Florida Power and Light Company ST. LUCIE PLANT TURKEY POINT PLANT cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Terry O. Jones, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, Florida 34982 Mr. R. E. Rose Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Walter Parker Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. William Jefferson, Jr.

Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344th Street Florida City, Florida 33035 Michael O. Pearce Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 Mr. Terry L. Pastterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957

Florida Power and Light Company ST. LUCIE PLANT TURKEY POINT PLANT cc:

Vice President, Nuclear Operations Support P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE. Tower Drive Stuart, Florida 34997 Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Dan McElhinney Federal Emergency Management Agency Region I J.W. McCormack P.O. &

Courthouse Building, Room 401 Boston, MA 02109 Mr. Jack Devine Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 Mr. Stephen McGrail, Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Donald Bliss, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 Mr. Daniel G. Roy Nuclear Training Manager Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. Gene F. St. Pierre Station Director Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

Seabrook Station, Unit No. 1 cc:

Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874