ML032110371

From kanterella
Jump to navigation Jump to search
Revision to License Amendment Request 02-03, Changes to Technical Specifications Associated with Nuclear Instrumentation
ML032110371
Person / Time
Site: Seabrook 
Issue date: 07/16/2003
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-02095, NYN-03032, NYN-03055
Download: ML032110371 (6)


Text

1 0

FPL Energy FPL Energy Seabrook Station Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 July 16, 2003 Docket No. 50-443 NYN-03055 U.S. Nuclear Regulatory Commission Re: NYN-02095 ATTN: Document Control Desk NYN-03032 Washington, D.C. 20555-0001 Seabrook Station Revision to License Amendment Request 02-03, "Changes to Technical Specifications Associated with Nuclear Instrumentation" FPL Energy Seabrook, LLC (FPLE Seabrook) has enclosed herein a revision to License Amendment Request (LAR) 02-03, NYN-02095, dated October 11, 2002.

This revision withdraws the LAR 02-03 proposed change to Technical Specification (TS) Table 4.3-1 to extend the Analog Channel Operational Test surveillance interval for Functional Unit 6, Source Range, Neutron Flux from 31 days to 92 days. The surveillance interval for Functional Unit 6 will remain as currently licensed, i.e., 31 days. TS Table 4.3-1 has been revised accordingly to reference Note 8 specifying the 31-day interval. The revised markup and retype pages for TS page 3/4 3-9 are enclosed and supercede TS page 3/4 3-9 submitted in LAR 02-03.

Please note that Note 8 of TS Table 4.3-1 Table Notations was previously revised to reflect the 31-day interval in submittal Letter NYN-03032, Revision to License Amendment Request 02-03, "Changes to Technical Specifications Associated with Nuclear Instrumentation," dated April 21, 2003.

This revision to LAR 02-03 does not make any additional changes to LAR 02-03 or its conclusion. That is, the proposed changes do not involve a significant hazards consideration pursuant to the requirements of 10 CFR 50.92 and the proposed changes continue to meet the criteria of 10CFR 51.22(c)(9) for a categorical exclusion from the requirements for an Environmental Impact Statement. Therefore, this revision to LAR 02-03 will neither adversely affect nor endanger the health and safety of the general public.

Should you have any questions regarding this letter, please contact Mr. James M. Peschel, Regulatory Programs Manager, at (603) 773-7194.

Very truly yours, FPL Energy Seabrook, LLC.

Gene F. St. Pierre Station Director A o l

U.S. Nuclear Regulatory Commission NYN-03055/Page 2 cc:

H. J. Miller, NRC Regional Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G. Dentel, NRC Senior Resident Inspector Mr. Donald Bliss, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301

0 FPL Energy Seabrook Station SEABROOK STATION UNIT 1 Flacility OeangLcse NPF8 Doce No 50443, Revisin to Lcense mendmet Requ st

tail03, "Chnge t TehnialSpeifiatons Associate WIh NuclerIsrmnain FPL Energy Seabrook, LLC submits this revision to License Amendment Request 02-03 pursuant to 10CFR50.90. The following information is enclosed in support of this revised License Amendment Request:

Markup and Retype of the Proposed Change I, Gene F. St. Pierre Station Director of FPL Energy Seabrook, LLC hereby affirm that the information and statements contained within this revision to License Amendment Request 02-03 are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

Gene F. St. Pierre Sworn and Subscribed Station Director beforsjne this

/6 day of July, 2003 Notary blic

MARKUP AND RETYPE PAGES The attached markup and retype pages reflect the currently issued revision of the Technical Specifications listed below.

Pending Technical Specifications or Technical Specification changes issued subsequent to this submittal are not reflected in the enclosed markup and retype pages. The enclosed retype should be checked for continuity with Technical Specifications prior to issuance.

The following Technical Specification is included in the attached markup:

Technical Specification Title Page(s)

Table 4.3-1 Reactor Trip System Instrumentation 3/4 3-9 Surveillance Requirements

S

-4 s-a TAL_43-1 REACTOR-TRI P SYSTEM INSTRUMENTATION SRVFII ANCF EfUNCIONALUNI

1. Manual Reactor Trip
2. Power Range, Neutron Flux
a. High Setpoint
b. Low Setpoint
3. Power Range, Neutron Flux, High Positive Rate
4. X eunFbW CHANNEL CHE N.A.

S S

CHANNEL CALIBMTION N.A.

D(2, 4, M(3 4 Q(4, 6),

R(4, 5)

R(4)

R(4)

ANALOG CHANNEL OPERATIONAL

.igES N.A.

REffUIREMEMT TRIP ACTUATING DEVICE OPERATIONAL TEST R(13)

ACTUATION LOGICNA.

N.A.

MODES FOR WHICH SURVEILLANCE I-fREOUIRE 1,2,3*,4*,5*

Q N.A.

N.A.

1,. 2 S/U(I)

N.A.

N.A.

1*** 2 Q

N.A.

N.A.

1, 2 I

I Z0+

S. Intermediate Range, Neutron Flux

6. Source Rangej Neutron Flux
7. Overtemperature AT
8. Overpower AT
9. Pressurizer Pressure--Low
10. Pressurizer Pressure--High
11.

Pressurizer Water Level--High

12.

Reactor Coolant Flow--Low S

S S

S S

S S

R(4, 5)

R R

R R

R R

S/U(),Q(9)

Q Q

Q Q

Q Q

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

2**, 3, 4, 5 1, 2 1, 2 1

1, 1

F r

S R(4, 5)

S/U(I)

N.A.

N.A.

1***, 2 Kr/Ir'E 7o

REACT FUNCTIONAL UNIT

1. Manual Reactor Trip
2. Power Range, Neutron Flux
a. High Setpoint
b. Low Setpoint
3. Power Range, Neutron Flux, High Positive Rate
4. NOT USED
5.

Intermediate Range, Neutron Flux

6. Source Range, Neutron Flux
7. Overtemperature AT
8. Overpower AT
9. Pressurizer Pressure-Low
10. Pressurizer Pressure-High
11. Pressurizer Water Level-High
12. Reactor Coolant Flow-Low TABLE 4.3-1 OR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS TRIP ANALOG ACTUATING CHANNEL DEVICE CHANNEL CHANNEL OPERATIONAL OPERATIONAL A

CHECK CALIBRATION TEST TEST L

N.A.

N.A.

N.A.

R(13)

N LCTUATION OGIC TEST l.A.

MODES FOR WHICH SURVEILLANCE IS REQUIRED 1,2,3*,4*,5*

S S

N.A.

S S

S S

S S

S S

D(2, 4),

M(3, 4),

Q(4, 6),

R(4, 5)

R(4)

R(4)

R(4, 5)

R(4, 5)

R R

R R

R R

Q N.A.

N.A.

N.A.

N.A.

1,2 1***, 2 1, 2 S/U(1)

Q S/U(1)

SIU(8),Q(9)

Q Q

Q Q

Q Q

N.A.

N.A.

I N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

2**, 3, 4, 5 1,2 1,2 I

1, 2 1

1 I

SEABROOK - UNIT 1 3/4 3-9 Amendment No. 36,