Transmittal of NPDES Monthly Report Forms for the Month of June 2003
ML032040622
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/14/2003
From: Root E
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
PY-CEI/OEPA-0403L
Download: ML032040622 (9)


Text

FENOC Pery Nuclear Power Plant 10 Center Road Perry, Ohio 44081 Edward K. Root 440-280-5646 Manager - Radwaste. Envirnntal, Chemistry Fax: 440-280-5681 July 14,2003 PY-CEIIOEPA-0403L 4

Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/MOR P.O. Box 1049 ---

Columbus, Ohio 43216-1049 Ladies and Gentlemen:

Enclosed are the NPDES monthly report forms for the month of June 2003. The Preliminary Effluent Limit for copper was exceeded during this period. A separate letter was mailed detailing this issue in accordance with Part II of the National Pollutant Discharge Elimination System Permit.

If you have questions or require additional information, please contact Mr. Leo Harte at (440) 280-5514.

Very truly yours, Enclosures cc: NRC Region III NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440)

I, 'I- e. .r~tC -.-

J"; - s- .

1 A

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application: 71812 PerryNuclearPowerPlant 004 June 2003 3IB00016*GD 10 Center Rd. Sampiing Station

Description:

PerryOH44081 Point Representative of Discharge in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst:

in(2) - Enter frequency of sampling CCB 125 Leo J. Harte (1) 3 3 1 3 1 3 (2) 1 1 999 1 999 1 (00400) (01119) (00011) (34044) (50050) (50064) (78739) pH Copper, Total Water Temperature Oxidants, Total Flow Rate Chlorine, Free orination/Brominat S.U. Recoverable F Residual MGD Available Duration Day ug/l mg/l . mg/I Minutes 01 63 71.1 0.U1 70 02 65 55.7 0.02 65 03 8.69 72 51.8 0 60 04 41 70 49.1 0.2 -65 05 71 50.6 0.06 70 06 8.65 69 49.5 0.02 75 07 72 50 0.01 65 08 1 73 45.7 0.04 35 09 73 62.7 0.1 95 10 8.69 70 89.3 0.01 85 11 74 91.2 0.02 75 12 74 63.2 0 91 13 8.61 74 64 0.01 85 14 73 55.2 0.02 so 15 76 55.5 0.02 80 16 76 47.9 0.02 77 17 8.86 76 45.5 0.03 80 18 75 49.8 0.11 90 19 72 60.2 0.02 75 20 8.64 -74 62.6 0.01 83 21 _ 74 48.3 0.02 70 22 j 71 53.1 0.01 75 231 _ 77 52.4 0 75 24 1 8.74 79 54.5 0.01 75 25 j 77 64.6 0.05 80 261 ____ _ _ 1 78 64.9 0 - 85 27 8.69 79 81.8 0.03 - - 110 28 76 96.8 0.08 65 29 77 86.3 0.04 70 30 79 92.2 0.03 94 31 OTAL 69.57 41 2209 0 1865.5 1 2300 AVG N/A 41 73.6333 62.1833 0.0333 76.6667 MAtX 8.86 41 79 96.8 0.2 110 MIN 8.61 41 63 0 45.5 0 35 ertify under the penalty of law that I have personally examined and am familiar with the Information submitted and based on my quiry of those individuals immediately responsible for obtaining the Information, I believe the submitted Information Is true, accurate id complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fine and Imprisonment.

)ate Report Completed: Siatujesop1eporter Title of Reporter:

07/08/2003 t Manager, Environmental orm No EPA 4500 (8-91) Page 1 of 3enerated by SWIMS) ormerly EPA SURI

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application: 718120 Perry Nuclear Power Plant 004 June 2003 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Perry OH 44081 Point Representative of Discharge

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application: 71812 Perry Nuctear Power Plant 601 June 2003 3IB00016*GD Perry' Nuclear Power Plant mpigSaonDsrto:

I0 Center Rd.SapigSainDsrto:

PerryOH4408l Discharge from Regenerate Neutralization Pits in(1) -Enterl1for Continuous, 2for Composite, 3for Grab Sample Reporting Lab: Analyst:

in(2) -Enter frequency of sampling CCB 125 Leo J. Harte OC- 3 3 3 1 ________

(2) 1 1 1 999 (0040 0) pH (00530)

Total Suspended (00550)

Oil and rease, f (50050)

Flow ate S.13. Solids Total MGD Day 1 mg/i -~~~~~~~~~ 0.0184 02 __ _ _ _A__ __ _ _ _

~03: -- AH 04 tAH ---- ___________

05 t .All__--

___ _____________AH} -__________ - __

08 7.46 10 j __AA 0.018 09 _ _ _ _ _ _ _ _ _ _ _ _ _ _ A _ - _ __ _ _ _ _ __ _ _ _ _ _

12 869 I AA -606017 - ____-- _ _

13 ~l AH___.

14 .J All___H 15 . .__ AH 16 All 17 7.3 -. 0018 -___

18 All 19 I ~ l AH___ --- - _

220 8.39 9 AA 0.015 22 - All.- -.- -- - -- - . ~~

~~~~~~~~

~~~~~~~~~~~~~~~~~~~ --- -

23 Al) -- ___----.---------

24 AH 25 ___]I AH 26 IAllH -- ~ -__

27 8.14 6 AA001 28 All


---~~~~.. .- - I - . --~

OTAL 47.76 34 0 0.104 j 0 0 AVG N/A 8.5 0 0.0173 (_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

MAX 8.6 10 0 0.018 f_______________

MIN 7.3 6 0 0.015 ( 0 0

.ertify under the penalty of law that have personally examined and am familiar with the information submitted and based on my quiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate id complete. am aware that there are significant penalties for submitting false nformation, including the possibility of fine and imprisonment.

Date Report Completed: Sigt f porter: Title of Reporter:

07/08/2003 Manager, Environmental aorm No EPA 4500 (8-91) Page of Generated by SWIMS) ormerly EPA SIURI

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application: 71W'20 PerryNuclearPowerPlant 601 June 2003 31B00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Perry OH 44081 Discharge from Regenerate Neutralization Pits feportlng Code Result Date dditlonal Remarks Mdl l 00550 06/08/2003 aessthan MDL. 5.

00550 06/12/2003 Less than MDL. 5.

00550 06/20/2003 ess than MDL. 5.

00550 06/27/2003 ess than MDL. 5.

50050 06/02/2003 No discharge performed this ate.

50050 06/03/2003 No discharge performed this date.

50050 06/04/2003 To discharge performed this date.

50050 06/05/2003 o discharge performed this date.

50050 06/06/2003 o discharge performed this date.

50050 06/07/2003 No discharge performed this date.

_ _050 06/09/2003 discharge performed this date. _ _

50050 06/09/2003 lo discharge performed this date.

50050 06/10/2003 To discharge performed this date.

50050 06/11/2003 To discharge performed this date.

50050 06/13/2003 go discharge performed this date.

50050 06/14/2003 go discharge performed this date.

50050 06/15/2003 go discharge performed this date.

50050 06/16/2003 go discharge performed this date.

50050 06/16/2003 o discharge performed this date.

50050 06/19/2003 go discharge performed this date.

50050 06/21/2003 o discharge performed this date.

50050 06/22/2003 o discharge performed this date.

50050 06/23/2003 o discharge performed this date.

50050 06/24/2003 o discharge performed this date.

50050 06/25/2003 o discharge performed this date. -

50050 06/26/2003 o discharge performed this date.

50050 06/28/2003 o discharge performed this date.

50050 06/29/2003 06/30/2003 lodischarge g4o discharge performed this date.

1ONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application: 71812 DerryNuclearPowerPlant 602 June 2003 31800016*GD eny Nuclear Power Plant Sampling Station

Description:

PerryOH440O1 Discharge from Chemical Cleaning Lagoon in() - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst:

in2)-Enter frequency of sampling CCB 125 Leo J. Harte (1) _ 2

____--2 3 2 3 1 (2) 998 998 1 998 1 999 (00980) (01119) (00400) (00530) (00550) (50050)

Iron, Total Copper. Total pH Total Suspended Oil and Grease, Flow Rate Recoverable Recoverable S.U. Solids Total MGD Day ug/l__ ug/l __ g gtl . ..

01 AL 02 03 04 _ _ _

05 06 _

07 08 09 _______

10 12 13 _ _

14 16 18 __ _

21_

-- i1 -_

24 22 _

25 -_

26 3

28 I /

-29 jj._ _

30 __

31 _ _

rOTAL 0 0 0 0 0 0 0 AVG 0 N/A UAX 0 MIN __ 0 0 0 0 __

  • _

certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my iquiry of those individuals Immediately responsible for obtaining the Information. I believe the submitted Information Is true. accurate nd complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fine and mprisonment Date Report Completed: Sign ureP~porter. Title of Reporter:

07/08/2003 C Manager, Environmental

orr No EPA 4500 (8-91)

Page 1 of Generated by SWIMS)

ormerly EPA SURI

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application: 718120 Perry Nuclear Power Plant 602 June 2003 31B00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Perry OH 44081 Discharge from Chemical Cleaning Lagoon Feportlng Code pesult Date 00980 06/01/2003 ro Additional Remarks discharge performed for the month.

jMdl

MONTHLY REPORT FORM 4500 MON.hLY RE.ORTFORM 4508 Name, Address City, County, ZIP: Station Code: Rbported Date (Month Year): Application: 71812 Perry Nuclear Power Plant 800 4Ui6 003 31B00016*GD Perry Nuclear Power Plant S S D cito 10 Center Rd. Sampling Station Descrption PerryOH44081 Intake Water from Lake Erie in(1) - Enter 1 for Continuous. 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst:

in(2) - Enter frequency of sampling CCB 125 Leo J Harte (1) 3 .1 _ _ _ _ _ _ _ , _ _ _ _ __ _ _ _ _- _ _ __---I (2) 1 999 l (01119) (00011)

Copper. Total ater Temperature Recoverable F Day ug/h _.. _ . __.._ -

01 57 02 57 03 65 04 30 58 05 57 06 56 07 57 08 57 09 60 10 60 11 62 12 62 13 61 14 63 15 64 16 62 17 62 18- 59 _ _

19 59 20 59 211 59 22_ _57_ _ _

23 1 _ 63 66 25 66 26 68 .__

27 1_7 § 28 I- 70 29j 71 __ _ _

30 j 71 31 _ _ _ _ _

73TAL 0 1859 0 0 0 0 0 AVG 30 61.9667 30 71 MIN 30 56 0 0 0 0 0 certify under the penalty of law that I have personally examined and am familiar with the Information submitted and based on my iquiry of those Individuals Immediately responsible for obtaining the Information I believe the submitted Information Is true, accurate nd complete. I am aware that there are significant penalties for submitting false Infomation, including the possibility of fine and imprisonment I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Date Report Completed: Si porter Title of Reporter 07/08/2003 CX177- Manager, Environmental orm No EPA 4500 (8-91) Page 1 of Generated by SWIMS)

ormerly EPA SURI

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code! Reported Date (Month Year): Application: 71820 Perry Nuclear Power Plant 800 June 2003 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Peny OH 44081 Intake Water from Lake Erie