June 2003 Monthly Operating Report for Perry Nuclear Power Plant, Unit 1
ML032040219
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/14/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2718L
Download: ML032040219 (3)


Text

FENOC Fffstergy Aear Opeating Cany Perry Nuclear Power Plant 10 Center Road P0. Box 97 Perry, Ohio 44081 July 14, 2003 PY-CEINRR-2718L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the June 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region m Administrator NRC Project Manager NRC Resident Inspector tl**.

OPERATING DATA REPORT UNIT:

Perry DATE:

77/03

1.

Docket: 50-440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period: June 2003

4.

Utility Contact T. PhelDs

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

7.

Maximum Dependable Capacity (Net MWe):

1260 1235

8.

Hours Reactor was Critical

9.

Hours Generator On-Une

10.

Unit Reserve Shutdown Hours

11.

Net Electrical Energy (MWeH)

This Month 720.0 720.0 0.0 867.503.0 Yr-to-Date 3.060.6 2.999.1 0.0 3AA.211 0 Cumulative 107.964.1 49ns -fl A

, vv.ou:w.

0.0 4 sn fnnA A')1 A s

§ u.wo.zz.u Page 1

k UNIT SHUTDOWNS REPORT MONTH - June 2003 DOCKET NO: 50440 NAME: Perry Nuclear Power Plant DATE: 7/7/03 CONTACT: T. Phelos TELtPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I

Hours 2

3

SUMMARY

The Perry Plant ran the entire month of June 2003.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

Ucense Examination F - Administrative G - Operational Error (explain)

H -Other (explain)

3. METHOD:

1 - Manuel 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2