MONTHYEARML23349A0362023-12-14014 December 2023 NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability ML23338A1192023-11-21021 November 2023 NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23262A7432023-09-19019 September 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 Acceptance of Relief Request I5R-26 ML23186A1482023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt 10 CFR 50.69 ML23186A1412023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-505 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23118A1652023-04-28028 April 2023 NRR E-mail Capture - Request for Additional Information Quad Cities, Unit 2, Alternative Request I6R-11 ML23083B9572023-03-24024 March 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-564 ML23055A0392023-02-24024 February 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Amendment to Adopt TSTF-416 ML23052A0772023-02-21021 February 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance Timely Renewal Exemption Request ML22357A0392022-12-23023 December 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of I6R-10 Related to Repair of Penetration N-11B ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23004A0262022-12-16016 December 2022 NRR E-mail Capture - Draft Request for Additional Information - Quad Cities Alternative RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves (EPD L-2022-LLR-0070) ML22348A0452022-12-14014 December 2022 NRR E-mail Capture - Draft Request for Additional Information Regarding Quad Cities Alternative I6R-09 ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22290A0662022-10-17017 October 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-04 Related to HPCI Drain Pot Solenoid Valve Testing ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22224A0222022-08-12012 August 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative I6R-09 Related to Use of Certain 2013 Edition ASME Code Requirements ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22206A0352022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Quad Cities Alternative Related to Sblc Nozzle Inspection ML22193A0412022-07-11011 July 2022 NRR E-mail Capture - RAI Quad Cities License Amendment to Expand the Use of Prime Methods ML22187A1832022-07-0606 July 2022 NRR E-mail Capture - Completion of Activities Related to EPID L-2022-LLD-003, Quad Cities Potential NOED ML22182A1992022-07-0101 July 2022 NRR E-mail Capture - RAI Alternative RV-11, Code Case OMN-28 ML22164A7852022-06-13013 June 2022 NRR E-mail Capture - RAI Quad Cities Amendment for Spent Fuel Pool Storage Analysis ML22164A8562022-06-13013 June 2022 NRR E-mail Capture - RAI Quad Cities Alternative RV-08, Safety Relief Valves ML22164A8582022-06-13013 June 2022 NRR E-mail Capture - RAI Alternative RV-09, MSSVs ML22101A0932022-04-11011 April 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Relief I6R-01 Related to SLC Nozzle Inner Radius Inspection ML22077A4122022-03-18018 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-06 Related to MSSV Setpoint Testing ML22076A0322022-03-17017 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-03 Related to PIV Leak Test Frequency ML22075A0752022-03-16016 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-07 Related to MSIV Stroke Testing ML22068A0062022-03-0909 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-11 Related to OMN-28, Valve Position Verification ML22068A0552022-03-0909 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-09 Related to MSSV Testing ML22068A1512022-03-0909 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-10 Related to Code Case OMN-28, MOV Testing ML22067A2172022-03-0808 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative Related to MSRV Testing ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22039A2042022-02-0808 February 2022 NRR E-mail Capture - Public Meeting Dresden/Quad Cities - Proposed Alternative to Use ASME Code Case N-921 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21342A3842021-12-0808 December 2021 NRR E-mail Capture - Request for Additional Information: Quad Cities 1 & 2 License Amendment Request Transition to GNF3 Fuel ML21342A3402021-12-0808 December 2021 Acceptance Review: License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times ML21322A3112021-11-18018 November 2021 Acceptance Review: Quad Cities Units 1 and 2 - License Amendment Request New Fuel Vault Storage and Spent Fuel Pool Criticality Methodologies ML21312A5612021-11-0808 November 2021 Acceptance Review: Quad Cities, Units 1 and 2 - License Amendment Request Regarding Transition to GNF3 Fuel ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application 2023-09-22
[Table view] |
Text
Duke Wheeler - Draft Quad 6c RAI R~sponse Page 1 From: 'Maher, William D.' <william.maher~exeloncorp.com>
To: *Bob Palla (E-mail) <rIp3@nrc.gov>, Duke Wheeler (E-mail) <dxw~nrc.gov>
Date: 7/11/03 1:17PM
Subject:
Draft Quad 6c RAI Response Attached you will find our draft response to 6c of the RAI's for Quad Cities ER.
If you should have any questions, please feel free to contact me at any time.
Bill
<<<AltemateResponse6c.doc>>
This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies.
This e-mail is intended solely for the use of the individual or entity to which it is addressed. f you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. f you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You.
CC: NFulvio, Albert A." <albertfulvio~exeoncorp.com>, Polaski, Fred W."
<fred.polaski@exeoncorp.com>, Nosko, John M. <john.nosko@exeoncorp.com>, Tzomes, Chancellor <ca.tzomes @exeloncorp.com>
Response 6(c):-
fIn the IPEEE submittal, Exelon estimated that after the resolution of the seismic outliers, the plant high confidence in low probability of failure (HCLPF) would be at least 0.24g which is less than the 0.3g review level earthquake used in the IPEEE. During the EPU evaluation, the staff noted that if the HCLPF capacity was increased to 0.3g, the resulting CDF would be about an order of magnitude reduction in risk from the IPEEE plant condition. Please identify the systems, structures, and components (SSCs) that limit the plant HCLPF. For those SSCs below 0.3g, justify why modifications to increase seismic capacity would not be cost beneficial when evaluated consistent with the regulatory analysis guidelines."
Upon completion of the USI A-46 outliers in February, 2003 as noted in Response 6(b),
the current HCLPF for Quad Cities is at least 0.24g. The order of magnitude reduction in CDF noted above from the IPEEE plant condition is a conservative estimate based on a plant with a HCLPF of 0.15g. This estimate was made using a bounding method first introduced by Exelon in the RAI responses for the Dresden Extended Power Uprate submittal. Using the same conservative approximations with a plant HCLPF of 0.24g would yield approximately a 2E-6/yr reduction in seismic CDF (i.e., much less than an order of magnitude). However, this should not be compared to a similar reduction in the internal events CDF due to the over-simplification and conservative bias involved in the calculation. Additionally, this 2E-6/yr reduction would be representative of a plant with all SSCs at exactly 0.24g, whose equipment was all modified to handle 0.3g. In fact, the majority of SSCs at Quad Cities already have HCLPF values of at least 0.3g.
Thirty-four SSCs or categories of cable trays remain with a HCLPF value of 0.24g or higher, but that have not been verified to 0.3g. These remaining SSCs include the following:
- 4 categories of cable trays where improvements have been made to meet 0.24g, but where walkdowns and re-analysis have not been performed to determine how to qualify them to 0.3g. Significant modifications could be required to further increase the seismic capacity.
- 1 is the 2A 125V battery charger, which is good to 0.27g. Additional anchorage improvements would be required to extend the HCLPF to 0.3g.
- 3 RHRSW pump room coolers. Any modification would involve some complicated scaffolding design and construction, as well as some kind of analysis of the coolers and design of the modifications.
- The balance consists of 4 Switchgear and 22 MCCs. They consist of both essential AC and some 250VDC components. They all are currently considered to have 0.24g HCLPF values. The limit is related to the concrete pad itself and/or bonding of the embedded strap to the concrete.
Some of these components are near walls, but generally they are in the middle of rooms where bracing would involve installing some kind of 'legs' to brace them from the floor, and these potential enhancements could hinder access for maintenance or other activities. Further improvements are not practical.
EPRI has estimated that the SQUG modifications resulted in expenses of $1.4M per plant, but it is estimated that Quad Cities had more SQUG outliers than the average plant. To address the items listed above, it is estimated that this would require a similar effort to the SQUG modifications, or more than $2.OM.
Limited benefit would be obtained by improving the plant HCLPF to 0.3g for all SSCs.
As noted above, the maximum benefit is conservatively estimated at about 2E-6/yr, but practically the actual maximum benefit is quite less. The cost estimate of more than
$2.0M precludes this as being cost-beneficial. Cost benefits from individual improvements can also not be easily made at this time without extensive analysis efforts. As such, it is judged that further modifications to increase seismic capacity are not warranted. The best use of available capabilities is to determine the estimated averted costs and benefits by using the internal events CDF as a measure (with extra margin considered to account for potential benefits from external events as described in Response 7(c)).