ML032020280
| ML032020280 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/03/2003 |
| From: | Ernstes M Operator Licensing and Human Performance Branch |
| To: | Beasley J Southern Nuclear Operating Co |
| References | |
| 50-348/03-301, 50-364/03-301, ES-401, ES-401-2 50-348/03-301, 50-364/03-301 | |
| Download: ML032020280 (8) | |
See also: IR 05000348/2003301
Text
Final Submittal
FARLEY EXAM
50-348 & 50-36412003-301
MAY 19 - 26,2003
FINAL SAMPLE PLANS / W U I LlNtS
PWR Examination Outline
Form ES-401-2
Facility: Farley Nuclear Plant
Date of Exam: 5/19/03
RO WA Category Points
Tier
Group K
K
K
K
K
K
A
A
A
A
G
1
2
3
4
5
~
6
1
2
3
4
~
Vote: 1.
2.
3.
4.
5.
6.*
7.
h.
I.
Ensure that at least two topics from every WA category are sampled within each tier
of the RO outline (i.e., the "Tier Totals" in each WA category shall not be less than
two). Refer to Section D.1.c for additional guidance regarding SRO sampling.
The point total for each group and tier in the proposed outline must match that
specified in the table. The final point total for each group and tier may deviate by *I
from that specified in the table based on NRC revisions. The final RO exam must
total 75 points and the SRO-only exam must total 25 points.
Select topics from many systems and evolutions; avoid selecting more than two WA
topics from a given system or evolution unless they relate to plant-specific priorities.
Systemslevolutions within each group are identified on the associated outline.
The shaded areas are not applicable to the categoryhier.
The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA
Catalog, but the topics must be relevant to the applicable evolution or system. The
SRO WAS must also be linked to 10 CFR 55.43 or an SRO-level learning objective.
On the following pages, enter the WA numbers, a brief description of each topic, the
topics' importance ratings (IR) for the applicable license level, and the point totals for
each system and category. Enter the group and tier totals for each category in the
table above; summarize all the SRO-only knowledge and non-A2 ability categories in
the columns labeled " K and "A," Use duplicate pages for RO and SRO-only exams
For Tier 3, enter the WA numbers, descriptions, importance ratings, and point totals
on Form ES-401-3.
Refer to ES-401, Attachment 2, for guidance regarding the elimination of
inappropriate WA statements.
220f 34
NUREG-1021, Draft Revision 9
PWR Exar
Emergency and Abnormal Plant E
I
I
I
I
I
I
009EA2.15
OllEA1.03
01 51017AA2.08
015101 7AG2.4.50
022AA1.02
025AA2.04
026AK3.02
ElAPE # / Name / Safety Function
000027 Pressurizer Pressure Control
3.3/3.4
4.0/4.0
3.413.5
3.313.3
3.0L2.9
3.113.5
3.613.9
029EA2.07
038EG2.4.04
040AG2.1.23
000054 CE1EO6 Loss of Main
WIE11 Loss of Emergency Coolant
Recirc. 14
Recirc. / 4
W/EI 1 Loss of Emergency Coolant
R
4.214.3
4.014.3
3.9/4.0
BWIE04; W/E05 Inadequate Heat Trans-
S
PI - I n ~ s
of -
.Sink I 4
000040 (BW/EO5; CEIEO5; W/E12
Steam Line Rupture - Excessive deal
Transfer / 4
ation Outline
Form ES-401-2
lutions - Tier l1Group 1 (RO / SRO)
i
i
i
R
I
IR I tl
II
WA Topic@)
008AK2.02
1 2.712.7 1
1)
027AK2.03
1 2.6/2.8 I
11
027AG2.2.22
1 3.414.1 1
1)
040AK1.05
4.1J4.4
054AA2.01
4.3/4.4
~
~
054AG2.2.20
055EA2.04
3.714.1
056AK3.01
3.513.9
057AA1.04
3.513.6
058AK1.01
2.813.1
062AG2.1.20
4.314.2
065AA2.06
3.614.2
W1EllEG2.1.02
3.014.0
WlEllEK1.2
3.6/4.1
~
W/E05EA2.2
3.714.3
23 of 34
NUREG-1021, Draft Revision 9
KIA Category Totals:
2 2 2 3 5
4
Group PointTotal:
1 a/
1
0
0
0
3
3
7
24 of 34
NUREG-1021, Draft Revision 9
BW/E09: CE/A13: W/E09&E10 Natural Circ. / 4
BW/E13&E14 EOP Rules and Enclosures
CE/AI 1; W/EOB RCS Overcoollng - PTS / 4
CEIAIG Excess RCS Leakaqe I 2
R
W/E09EK2.2
3.W3.9
R
W/E08EA1.3
3.tY4.0
CE/EO9 Functional Recovery
WA Category Point Totals:
1 2 4 2 0 0
Group PointTotal:
9/
0
0
0
0
3
2
5
078 Instrument Air
103 Containment
103 Containment
KIA Category Point Totals:
260f 34
NUREG-I 021, Draft Revision 9
R
078A3.01
3.1/3.2
S
103A2.03
3.5/3.8
R
103K3.02
33/42
1 4
4
4
2 1 3 2 2 3
2
Group Point Total:
28/
0
0
0
0
0
0
0
2
0
0
2
4
27 of 34
NUREG-1021, Draft Revision 9
...
. ..
. .
.
Generic Knowledge and Abilities Outline (Tier 3)
Form ES-401-3
I
Facility:
Category
1.
Conduct of
Operations
2.
Equipment
Control
3.
Radiation
Control
4.
Emergency
Procedures
I Plan
270f 34
NUREG-1021, Draft Revision 9
.
.
.
...
...
270f 34
NUREG-1021, Draft Revision 9