ML032020264

From kanterella
Jump to navigation Jump to search
May 2003 Exam 50-348/2003-301 Draft Written Exam Sample Outlines
ML032020264
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/03/2003
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Beasley J
Southern Nuclear Operating Co
References
50-348/03-301, 50-364/03-301 50-348/03-301, 50-364/03-301
Download: ML032020264 (8)


See also: IR 05000348/2003301

Text

Draft Submittal

(Pink Paper)

FARLEY EXAM

50-348 & 50-364/2003-301

MAY 19 - 26,2003

1.

Written Exam Sample outlines

ES-401

PWR Examination Outline

Form ES-401-2

Facility: Farley Nuclear Plant

Date of Exam: 5/19/03

I

Vote: 1.

2.

3.

4.

5.

6.*

7.

h.

I.

Ensure that at least two topics from every WA category are sampled within each tier

of the RO outline (Le., the "Tier Totals" in each WA category shall not be less than

two). Refer to Section D.l .c for additional guidance regarding SRO sampling.

The point total for each group and tier in the proposed outline must match that

specified in the table. The final point total for each group and tier may deviate by +I

from that specified in the table based on NRC revisions. The final RO exam must

total 75 points and the SRO-only exam must total 25 points.

Select topics from many systems and evolutions; avoid selecting more than two WA

topics from a given system or evolution unless they relate to plant-specific priorities.

Systems/evolutions within each group are identified on the associated outline.

The shaded areas are not applicable to the categoryher.

The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA

Catalog, but the topics must be relevant to the applicable evolution or system. The

SRO WAS must also be linked to 10 CFR 55.43 or an SRO-level learning objective.

On the following pages, enter the WA numbers, a brief description of each topic, the

topics' importance ratings (IR) for the applicable license level, and the point totals for

each system and category. Enter the group and tier totals for each category in the

table above; summarize all the SRO-only knowledge and non-A2 ability categories in

the columns labeled " K and "A," Use duplicate pages for RO and SRO-only exams

For Tier 3, enter the WA numbers, descriptions, importance ratings, and point totals

on Form ES-401-3.

Refer to ES-401, Attachment 2, for guidance regarding the elimination of

inappropriate WA statements.

220f 34

NUREG-1021, Draft Revision 9

ES-401

PWR Examination Outline

Form ES-401-2

Emergency and Abnormal Plant Evolutions -Tier I/Group 1 (RO / SRO)

I

I

I

I

I

I

I

I

I

I

I

E/APE # / Name/ Safety Function

K K K A

A

G

WA Topic@)

IR

1

2

3

1

2

000007 (BW/EOZ&EIO CEIE02) Reactor

Trip - Stabilization - Recovely / 1

I

I

I

I

I

I

I

I

I

I

000040 (BW/EOS; CE/EOS; WE12

Transfer I 4

Feedwater / 4

Steam Line Rupture - Excessive t i

eat

000054 (CE/EO6) Loss of Main

surizer Vapor Space

000027 Pressurizer Pressure Control

S

040AK1.05

4.114.4

R

054AA2.01

4.314.4

WE11 Loss of Emergency Coolant

Recirc. I 4

S

W/EllEG2.1.02

3.014.0

W/EI 1 Loss Of Emergency Coolant

R

WlEllEK1.2

3.W4.1

WIE05EA2.2

3.7/4.3

Recirc. / 4

I

,

,

,

,

I

I

I

I

23 of 34

NUREG-I 021, Draft Revision 9

I

2 2 2 3

5

4

Group PointTotal:

1

0

0

0

3

3

KIA Category Totals:

240f 34

NUREG-1021, Draft Revision 9

18/

7

CE/EO9 Functional Recovery

KIA Category Point Totals:

1 2 4

250f 34

NUREG-1021, Draft Revision 9

2 0 0 Group Point Total:

9/

0

0

0

0

3

2

5

078 Instrument Air

103 Containment

103 Containment

R

KIA Category Point Totals:

1 4

4

260f 34

NUREG-I 021, Draft Revision 9

R

078A3.01

3.1I3.2

s

103A2.03

3.5I3.8

103K3.02

3.8/4.2

4

2 1 3 2

2 3

2

Group PointTotai:

281

0

0

0

0

0

0

0

2

0

0

2

4

21 of 34

NUREG-1021, Draft Revision 9

27of 34

NUREG-1021, Draft Revision 9