ML031990304

From kanterella
Jump to navigation Jump to search
Regarding Confirmation of Initial/Requalification Operator License Examination
ML031990304
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/16/2003
From: Lanksbury R
Division of Reactor Safety III
To: Kanda W
FirstEnergy Nuclear Operating Co
References
Download: ML031990304 (4)


Text

July 16, 2003 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS

Dear Mr. Kanda,

In a letter dated April 15, 2002, (PY-CEI/OIE-0563L) your staff requested we schedule an initial license operator examination in November 2004. In a subsequent telephone conversation on June 17, 2003, between Mr. D. McNeil of my staff and Mr. J. Kelly, Perry Station ILT Lead, the requested examination was tentatively scheduled to occur during the weeks of November 29, 2004 and December 6, 2004. On-site validation of the examination will occur at the station approximately 3 weeks before the examination administration. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As requested in your letter, Region III examiners will develop the examination. Your letter indicated that you are training approximately 12 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule.

Finally, Mr. Kelly confirmed that the week of October 4, 2004, scheduled for the biennial requalification program inspection (IP 71111.11B), was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. M. Bielby of my staff at 630-829-9762.

W. Kanda In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.:

50-440 License No.:

NPF-58 cc:

B. Saunders, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health R. Collings, Training Department

W. Kanda In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.:

50-440 License No.:

NPF-58 cc:

B. Saunders, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health R. Collings, Training Department DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML031990304.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd MBielby RDLanksbury DATE 07/14/03 07/14/03 07/16/03 OFFICIAL RECORD COPY

W. Kanda ADAMS Distribution:

AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1 D. C. Trimble, NRR:DIPM:IOLB M. A. Bies, DRS