ML031990267

From kanterella
Jump to navigation Jump to search
Regarding Confirmation of Initial/Requalification Operator License Examination
ML031990267
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/16/2003
From: Lanksbury R
Division of Reactor Safety III
To: Peifer M
Nuclear Management Co
References
Download: ML031990267 (4)


Text

July 16, 2003 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS

Dear Mr. Peifer,

In a letter dated July 5, 2002, (NG-02-0533) your staff requested we schedule an initial license operator examination in November 2004. In a subsequent telephone conversation on June 16, 2003, between Mr. D. McNeil of my staff and Mr. C. Kress, DAEC Training Manager, the requested examination was tentatively scheduled to occur during the weeks of January 31, 2005 and February 7, 2005. On-site validation of the examination will occur at the station approximately 3 weeks before the examination administration. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your staff will develop the examination. Mr. Kress indicated that you are training approximately 16 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Mr. Kress also indicated there may be a desire to move the examination back to the last week of November 2004 or the first two weeks of December 2004. Finally, Mr. Kress confirmed that the week of November 1, 2004, scheduled for the biennial requalification program inspection (IP 71111.11B), was still within the anticipated requalification examination administration cycle.

Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. H. Peterson of my staff at 630-829-9707.

M. Peifer In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-331 License No: DPR-49 cc:

E. Protsch, Executive Vice President -

Energy Delivery, Alliant; President, IES Utilities, Inc.

J. Cowan, Chief Nuclear Officer J. Forbes, Senior Vice President J. Bjorseth, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel B. Lacy, Nuclear Asset Manager D. McGhee, Iowa Department of Commerce Chairman, Linn County Board of Supervisors State Liaison Officer Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.

Iowa State Representative C. Kress, Training Department

M. Peifer In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-331 License No: DPR-49 cc:

E. Protsch, Executive Vice President -

Energy Delivery, Alliant; President, IES Utilities, Inc.

J. Cowan, Chief Nuclear Officer J. Forbes, Senior Vice President J. Bjorseth, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel B. Lacy, Nuclear Asset Manager D. McGhee, Iowa Department of Commerce Chairman, Linn County Board of Supervisors State Liaison Officer Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.

Iowa State Representative C. Kress, Training Department DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML031990267.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd HPeterson RDLanksbury DATE 07/14/03 07/14/03 07/16/03 OFFICIAL RECORD COPY

M. Peifer ADAMS Distribution:

WDR DFT DSH RidsNrrDipmIipb GEG HBC GAW1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1 D. C. Trimble, NRR:DIPM:IOLB M. A. Bies, DRS