ML031990232
| ML031990232 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/16/2003 |
| From: | Lanksbury R Division of Reactor Safety III |
| To: | Skolds J Exelon Generation Co |
| References | |
| Download: ML031990232 (3) | |
Text
July 16, 2003 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS: CLINTON POWER STATION
Dear Skolds:
In a letter dated July 18, 2002, (RS-02-123) your staff requested we schedule an initial license operator examination in January 2004 and in November 2004. In a subsequent telephone conversation on June 19, 2003, between Mr. D. McNeil of my staff and Mr. K. McCall, Clinton Station Operations Training Manager, the requested examinations were tentatively scheduled to occur during the weeks of January 5, 2004, and January 12, 2004. The second examination was tentatively scheduled to occur during the weeks of November 15, 2004, and November 22, 2004. On-site validation of the examination will occur at the station approximately 3 weeks before the examinations are administered. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examinations at a mutually acceptable date.
As stated in your letter, your staff will develop the examinations. Mr. McCall indicated that you are training approximately 13 candidates for the January 2004 examination and 11 candidates for the November 2004 examination. Please inform us if the number of candidates declines below 10 for either examination as this will impact the examination schedule. Mr. McCall confirmed that the week of September 29, 2003, scheduled for the biennial requalification program inspection (IP 71111.11B), was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the initial examinations informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. B. Palagi of my staff at 630-829-9611.
J. Skolds In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Roger D. Lanksbury, Chief Operations Branch Docket No. 50-461 License No. NPF-62 cc:
Site Vice President - Clinton Power Station Clinton Power Station Plant Manager Regulatory Assurance Manager - Clinton Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing T. Shortell, Training Department
J. Skolds In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Roger D. Lanksbury, Chief Operations Branch Docket No. 50-461 License No. NPF-62 cc:
Site Vice President - Clinton Power Station Clinton Power Station Plant Manager Regulatory Assurance Manager - Clinton Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing T. Shortell, Training Department ADAMS Distribution:
AJM DFT JBH1 DCT RidsNrrDipmIipb GEG HBC PLL DRPIII DRSIII PLB1 JRK1 M. A. Bies, DRS DOCUMENT NAME:
To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd BPalagi RDLanksbury DATE 07/14/03 07/14/03 07/16/03 OFFICIAL RECORD COPY