fhrxu TXU Energy Comanche Peak Steam Electric Station P.O. Box 1002 (E01)
Glen Rose,TX 76043 Tel: 254 897 8920 Fax 254 897 6652 lance.terry@txu.com C. Lance Terry Senior Vice President &
Principal Nuclear Officer Ref:
EA-02-261 10CFR73.21 CPSES-200301247 Log# TXX-03107 July 7, 2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 U.S. Nuclear Regulatory Commission ATTN: Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation Room 5 D2, Mail Stop 0-5 E7 One White Flint North 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 UPDATE OF SCHEDULE PROGRESS FOR NRC ORDER FOR COMPENSATORY MEASURES RELATED TO ACCESS AUTHORIZATION - EA-02-261 (ATTACHMENT 2)
REF: 1. NRC Letter from Samuel J. Collins, Director Office of Nuclear Reactor Regulation to C. Lance Terry, Senior Vice president and Principal Nuclear Officer, Comanche Peak Steam Electric Station dated January 7, 2003
- 2.
Letter from C. Lance Terry, SVP&PNO, TXU Generating Company LP (TXU Energy) to Samuel J. Collins, NRR, 20 Day Answer to NRC Order EA-2-261 and Completion Schedule Gentlemen:
Via reference 2, TXU Generating Company LP (TXU Energy) responded to the Order (EA-02-261) identifying a completion schedule for all items identified in of the Order. This transmittal letter identifies the current progress and status of the items (via a schedule for achieving compliance with each requirement) described in Attachment 2 of the Order.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Calaway
- Comanche Peak
- Diablo Canyon Palo Verde South Texas Project Wof Creek
-6 OQ TXu F
Ilk
&-W-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
TXX-03107 Page 2 of 3 This answer is hereby submitted to the Commission in accordance with 10CFR50.4.
I state under penalty of perjury that the foregoing is true and correct.
Executed on July 7, 2003.
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC, Its General Partner C.L Senior Vi resident and Principal Nuclear Officer NSH/nh Attachments:
1.
Update and Schedule for Compliance with the Attachment 2 of the Order c -
T.P. Gwynn, Region IV W. D. Johnson, Region IV D. H. Jaffe, NRR Resident Inspectors, CPSES
Attachment to TXX-03107 Page 1 of 3 20 Day Answer to Order The NRC order of January 7, 2003, included the following reporting requirements:
A All Licensees shall, comply with the requirements described in Attachment 2 to this Order except to the extent that a more stringent requirement is set forth in the Licensee's security plan. The Licensees shall immediately begin implementation of the requirements in Attachment 2 to the Order and shall complete implementation no later than July 7, 2003, with the exception of:
compensatory measure B. 1.1 which shall be implemented no later than April 7, 2003 and, C.1.6 and C.1.8 which shall be completed no later than January 7, 2004.
B. 1. All Licensees shall, within twenty (20) days of the date of this Order, notify the Commission, (1) if they are unable to comply with any of the requirements described in Attachment 2, (2) if compliance with any of the requirements is unnecessary in their specific circumstances, or (3) if implementation of any of the requirements would cause the Licensee to be in violation of the provisions of any Commission regulation or the facility license. The notification shall provide the Licensees' justification for seeking relief from or variation of any specific requirement.
- 2. Any Licensee that considers that implementation of any of the requirements described in Attachment 2 to this Order would adversely impact safe operation of the facility must notify the Commission, within twenty (20)days of this Order, of the adverse safety impact, the basis for its determination that the requirement has an adverse safety impact, and either a proposal for achieving the same objectives specified in the Attachment 2 requirement in question, or a schedule for modifying the facility to address the adverse safety condition. If neither approach is appropriate, the Licensee must supplement its response to Condition B I of this Order to identify the condition as a requirement with which it cannot comply, with attendant justifications as required in Condition B 1.
C. 1. All Licensees shall, within twenty (20) days of the date of this Order, submit to the Commission, a schedule for achieving compliance with each requirement described in Attachment 2.
- 2. All Licensees shall report to the Commission, when they have achieved full compliance with the requirements described in Attachment 2.
to TXX-03 107 Page 2 of 3 TXU Energy Answer The TXU Energy answer below applies to all Compensatory Measures (CMs) identified in the Order. TXU Energy will be able to comply with the requirements of Attachment 2 of the Order.
Implementation Schedule for Attachment 2 to NRC Order EA-02-261 dated January 7, 2003.
-M ile R
d Status Plnor ned
'Compliane
- Implementation B
Unescorted Access Authorization Measures B.l.l Alternative Method For Access April 7,2003 Complete B.1.2 Access Categories July 7, 2003 Complete B.1.3 Verify True Identity July 7, 2003 Complete B.V.4 Initial Unescorted Access July 7, 2003 Complete B.l.5 Updated Unescorted Access July 7, 2003 Complete B.1.6 Psychological Evaluation July 7, 2003 Complete B. 1.7 Reinstated Access July 7, 2003 Complete C.l.l Implement Common Vehicle (PADS)
July 7, 2003 Complete C
Access Authorization Program Measures C.1.2 Access Denial Data Entry July 7,2003 Complete C.1.3 Personnel Follow-up at Other Plants July 7, 2003 Complete C..4 I OCFR26 Violation Notification July 7,2003 Complete C.1.5 Denied Access Actions July 7, 2003 Complete C.1.6 Conduct Re-investigations January 7, 2004 January 7, 2004 C.1.7 Screening of BI Screeners July 7, 2003 Complete
Attachment to TXX-03107 Page 3 of 3 CM
-T: ietle.
- -; -- ^
0 Rq
-u Status or Planned Com "Bani Ip ementation C
Access Authorization Program Measures C.1.8 Enhance Behavioral Observation January 7, 2004 January 7, 2004 C.1.9 Access Audit Program July 7, 2003 Complete C.1.10 Management of Personnel Information July 7, 2003 Complete