MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] Category:Manual
MONTHYEARML23345A0672023-11-28028 November 2023 Technical Specifications Bases Manual ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual ML23345A0842023-11-28028 November 2023 Technical Requirements Manual ML23345A0882023-11-28028 November 2023 Technical Requirements Manual ML23195A0342023-07-0606 July 2023 Technical Requirements Manual, Revision 21 ML23195A0352023-06-30030 June 2023 Revisions to Technical Requirements Manual ML23195A0332023-06-29029 June 2023 Technical Requirements Manual ML23107A1292023-03-31031 March 2023 Technical Specifications Bases, Unit 2 ML23107A1322023-03-31031 March 2023 Technical Requirements Manual, Unit 2 ML23025A0362023-01-16016 January 2023 Technical Specifications Bases Manual ML23017A0462023-01-0606 January 2023 Technical Specifications Bases, Manual ML23017A0552023-01-0606 January 2023 Technical Specification Bases, Manual ML22363A0972022-12-15015 December 2022 Technical Requirements Manual, Revision1 ML22363A0982022-12-15015 December 2022 Technical Requirements Manual, Rev. 1 for Section 4.7 ML22363A0992022-12-14014 December 2022 Technical Requirements Manual, Revision 28 ML22363A1022022-12-14014 December 2022 Technical Requirements Manual, Revision 29 ML22363A1012022-12-0909 December 2022 Technical Requirements Manual, Rev. 12 for Section 2 ML22363A1002022-12-0707 December 2022 Technical Requirements Manual, Rev.11 ML22287A1192022-10-0606 October 2022 Technical Requirement Manual ML22287A1202022-10-0606 October 2022 Technical Requirement Manual ML22180A1942022-06-10010 June 2022 Technical Specification Bases Unit 1 Manual ML22180A1952022-06-10010 June 2022 Technical Specifications Bases Unit 2 Manual ML22136A1582022-04-29029 April 2022 Technical Specification Bases Manual ML22123A0582022-04-22022 April 2022 Transmittal of Technical Requirements Manual ML22123A0752022-04-22022 April 2022 Technical Requirements Manual Unit 2 ML22101A0282022-03-30030 March 2022 Revised Technical Specification Bases Unit 1 Manual ML22101A0442022-03-30030 March 2022 Technical Requirements Manual ML22039A0352022-01-18018 January 2022 Technical Requirements Manual, Revision 4 ML22039A0462022-01-18018 January 2022 Technical Specifications Bases Manual, Revision 8 ML22039A0322022-01-17017 January 2022 Technical Requirements Manual, Rev. 4 ML22011A1392022-01-0404 January 2022 Electrical Station - Technical Requirements Manual, Unit 1 ML22011A1452022-01-0404 January 2022 Electrical Station, Unit 2 - Technical Requirements Manual Unit 2 ML21224A1882021-08-0202 August 2021 Technical Specifications Bases Unit 2 Manual ML21224A1892021-08-0202 August 2021 Technical Requirements Manual Unit 2 ML21209A5212021-07-16016 July 2021 Technical Requirements Manual ML21209A5202021-07-16016 July 2021 Technical Requirements Manual ML21202A1512021-07-0202 July 2021 Technical Requirements Manual ML21202A1592021-07-0202 July 2021 Technical Requirements Manual ML21190A0522021-06-24024 June 2021 Technical Requirements Manual ML21196A1812021-06-24024 June 2021 Technical Requirements Manual PLA-7927, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-79272021-04-26026 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 ML21091A2232021-03-19019 March 2021 Technical Requirements Manual ML21070A1812021-02-26026 February 2021 Transmittal of Technical Requirements Manual ML21070A1822021-02-26026 February 2021 Technical Requirement Manual, Unit 2 ML21014A4452020-12-17017 December 2020 Technical Specifications Bases Manual ML21029A0572020-12-17017 December 2020 Technical Specification Bases Manual, Revision 16 ML21014A2252020-12-0101 December 2020 Technical Requirements Manual ML20304A1562020-10-13013 October 2020 Technical Requirements Manual ML20304A1582020-10-13013 October 2020 Technical Requirements Manual ML20129J9042020-04-23023 April 2020 Technical Requirements, Unit 1, Manual 2023-07-06
[Table view] |
Text
Jun. 27, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-30539 USER IEFORMATION:
Name:G EMPL#:28401 CA#:0363 Address: s Ph 254-3194 TRANSMITTAL INFORMATION:
TO: AO"U e v 06/27/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC -MANUAL ASSIGNED TO YOU:
108 - 108 - ONSITE EMEGENCY MONITORING TEAM (OSCAR): EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 06/24/2003 ADD MANUAL TABLE OF CONTENTS DATE: 06/26/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-108 REMOVE: REV:8 ADD: REV: 9 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC NUCLEAR DEPARTMENT PROCEDURE HP TECH I (OSCAR) EP-PS-108 EMERGENCY PLAN POSITION-SPECIFIC INSTRUCTION Revision 9 Page 1 of 3 QUALITY CLASSIFICATION: APPROVAL IFIgAi1ON:
( ) QA Program (X) Non-QA Program ( ) Plaqf / ) Non-Plant
( X) Instruto EFFECTIVE DABT: 4 , -
PERIODIC REVIEW FREQUENCY: 2 Years PERIODIC REVIEW"151 U AT L RECOMMENDED REVIEWS:
~ll Prqcodur r: Nuclear Emergency Planning Responsible Supervisor Primary Rad Protection Coordinator Responsible FUM: Supv.-Nuclear Emergency Planning Responsible Approver: Vice President-Nuclear Operations FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1
EP-PS-1 08 Revision 9 Page 2 of 3 HP TECH I (OSCAR): Emergency Plan Position-Specific Procedure WHEN: At requ( lst of Shift Manager HOW NOTIFIED: Working hours - Telephone or plant page REPORT TO: Shift Matnager until Technical Support Center (TSC) is activa Lted, then to HP Radioman; and after the EOFisi activated, the Field Team Director.
WHERE TO REPORT: Initially Ithe Control Room, then the TSC.
OVERALL DUTY:
Locate and perform surveys of the plume.
MAJOR TASKS: TAB: REVISION:
Prepare for OSCAR Deployment TAB A 6 Obtain Briefing. TAB B- 3 Prepare for Monitoring. TAB C 6.
Survey Plume and Report Results. TAB D 5 Report Unusual Observations or TAB E 5 Measurements.
Return to Site When Directed. TAB F 4
EP-PS-1 08 Revision 9 Page 3 of 3 SUPPORTING INFORMATION: TAB:
Onsite Emergency Monitoring Team Locations TAB 1 OSCAR Survey Techniques TAB 2 Forms TAB 3
- Survey Data Form with RMS Inoperable RMS Operating Instructions TAB 4
REFERENCES:
SSES Emergency Plan NUREG-0654, Planning Standards and Evaluation Criteria NUREG-0731, Guidelines for Utility Management Structure and Technical Resources, September 1980 HP-TP-443, Use of Portable Radiation Survey Meters
TABA EP-PS-1 08-A Revision 6 Page 1 of 1 MAJOR TASK:
Prepare for OSCAR Deployment.
SPECIFIC TASKS: HOW:
- 1. Obtain OSCAR monitoring team 1a. Go to the Health Physics Office. Obtain equipment. the following:
(1) OSCAR Van keys (4 keys: Van doors, Van ignition, Van storage locker, and Gate 50).
(2) VHF Radio, and spare battery.
(3) Cell telephone.
(4) Survey Meter (R02, R02A).
(5) EP-PS-1 08.
(6) Kl Tablets -
- 2. Proceed to Control Room 2a. Proceed to the Control Room when an Emergency Classification is declared or when directly contacted (i.e., by phone, plant page, or HP .Supervision).
TAB B EP-PS-1 08-B Revision 3
-Page 1 of 2 MAJOR TASK:
Obtain Briefing.
SPECIFIC TASKS: HOW: -
- 1. Report to Control Room. 1a. Identify yourself by saying Onsite Emergency Monitoring Team (Oscar) present."
- 2. Obtain briefing from Shift 2a. Ask key questions, such as:
Manager/Control Room personnel.
(1) Is there a release in progress or is one imminent?
(2) What is the cause or source of the release?
(3) Does the Control Room/HP 11Dose Calculator want OSCAR deployed?
- 3. IfOSCAR is to be deployed, obtain 3a. Contact HP II Dose Calculator in the meteorological data and a briefing TSC to let him know that you have from HP II Dose Calculator. arrived at the Control Room.
3b. Verify operational status of Remote Monitoring System (RMS).
3c. Discuss travel route to affected sector or monitoring position:
(1) Consider which gatehouse to exit.
(2) Most direct route.
(3) Weather and road conditions.
(4) Any other restrictions to traveling the roads depicted in TAB 1.
3d. Read and sign-in on RWP #8001 If not already done.
3e. Discuss the need for protective clothing.
TAB B EP-PS-1 08-B Revision 3 Page 2 of 2 SPECIFIC TASKS: HOW:
- 4. When TSC is activated and in control of the emergency, obtain a briefing from the TSC Dose Calculator.
- 5. If OSCAR is not to be deployed, 5a. Provide in-plant (India) team coverage.
support plant response as required by Control Room personnel.
NOTE:
Read and sign-in on RWP #8000 when appropriate.
5b. If not neededby-Control Room personnel, report to TSC.
TAB C EP-PS-1 08-C Revision 6 Page 1 of 2 MAJOR TASK:
Prepare for Monitoring.
SPECIFIC TASKS: HOW:
- 1. Proceed to OSCAR Van.
- 2. Upon reaching the Van, establish 2a. Turn on mobile and portable VHF radios, communications with the HP II Dose tune to channel #1, and call HP II Dose Calculator/HP Radioman, or the Field Calculator/HP Radioman, or FTD.
Team Director (FTD).
NOTE:
Verify fuel status of the van as sufficient for OSCAR -needs.
Discuss refueling contingencies with the TSCIEOF as necessary.
- 3. Activate RMS. HELP RMS Operating Instructions See TAB 4
- 4. Inform HP II Dose Calculator/HP 4a. Verify (via radio) with HP 11Dose Radioman, or FTD that you are ready Calculator/HP Radioman, and FTD that for dispatch. the RMS terminals located in the TSC and EOF are receiving radiological and locational telemetry from OSCAR.
4b. Obtain updated briefing information, if available, from the HPII Dose Calculator/HP Radioman, or FTD. Ask:
(1) Is there a release in progress or is one imminent?
(2) What is the cause or source of the release?
(3) Is OSCAR to be deployed immediately?
(4) What is OSCAR's initial monitoring assignment?
TAB C EP-PS-1 08-C Revision 6 Page 2 of 2 SPECIFIC TASKS: HOW:
- 5. Drive OSCAR outside the protected 5a. Complete Form NDAP-QA-0648-4 area, when directed. (copies available inside OSCAR Van) and submit to Security at the South Gatehouse.
5b. Exit the South (or North) Gatehouse; ensure that you retain custody of your TLD and PAD. Drive OSCAR to the affected sector (or potential affected sector) as directed by the HP 11Dose Calculator/HP Radioman, or FTD.
- 6. If directed to traverse Beach Grove NOTE: -
Road, it is permissible to pass through Vehicle barriers may be posted to vehicle barriers. prevent public access to Beach Grove Road. It Is permissible to pass through the barriers.
6a. Ensure that barriers are replaced if you move them for access.