ML031920277

From kanterella
Jump to navigation Jump to search
Revision 9 to EP-PS-109, Technical Support Center (TSC) Radio Communicator: Emergency Plan-Position Specific Procedure.
ML031920277
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/24/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EP-PS-109, Rev 9
Download: ML031920277 (4)


Text

Jun. 24, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-29670 USER INFORMATION:,&

Name: ACH* MMP t: 28401 CA#:0363 Address: A Ph 254-3 TRANSMITTAL INFORMATION:

TO: _-E :CI itlJE 1 06/24/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

109 - 109 - TECHNICAL SUPPORT CENTER (TSC) RADIO COMMUNICATOR: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 05/01/2003 ADD MANUAL TABLE OF CONTENTS DATE: 06/23/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-109 REPLACE: REV:9 REPLACE: REV:9 REMOVE: PCAF 2003-1329 REV: N/A ADD: PCAF 2003-1329 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

( C (8 Tab 2 EP-PS-1 09-2 EMERGENCY ORGANIZATION CONTROL ROOM EMERGENCY DIRECTOR l (SHIFT MANAGER) lIl l EMERGENCY PLAN SHIFT TECHNICAL NRC OPERATORS ADVISOR (STA) COMMUNICATOR(S)

COMMUNICATOR EP-AD-000-406, Revision 16, Page 1 of 3

( (

Tab 2 EP-PS-1 09-2 TSC ORGANIZATION EMERGENCY DIRECTOR*

I I l Additional I

, Rad Staff :

Proposed NRC Rev. 5-02 Susquehanna Steam Electric Station Non-Operations Units 1and 2 Support Personnel (9)_

Emergency Plan Ref. Sec. 6.2.12 TSC ORGANIZATION 9 report 0 66 minutes I GURF 5.2 Non-Operations Support Personnel Ref. Sec. 6.2.12 5 report 0 90 minutes Designates minimum requirements In accordance with Table B.1 for 60-minute response.


Individuals may be located in the OSC, TSC, or Rield.

  • Designates positions required for TSC activation.

EP-AD-000-406, Revision 16, Page 2 of 3

I (

Tab 2 EP-PS-1 09-2 EOF ORGANIZATION Proposed NRC Rev. 5-02 Susquehanna Steam Electric Station Units I and 2 Emergency Plan EOF ORGANIZATION Designates minimum requirements In accordance with Table 6.1 for 90 minute response.

FIGURE 6.3

  • Designates positions required for EOF activation.

EP-AD-000-406, Revision 16, Page 3 of 3