ML031920040
| ML031920040 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/27/2003 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| EP-PS-249, Rev 1 | |
| Download: ML031920040 (7) | |
Text
Jun. 27, 2003 Page l of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-30872 US INFORMATION Name:GE OSE M Address CSA2 Pho /
254-3194 TRANSMITTAL INFORMATION:
EMPL#:28401 CA#:0363 TO:
06/27/2003 LOCATIO:
DOCUMENT CONTROL DESK FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
249 -
249 -
EOF DOSE CALCULATOR REMOVE MANUAL TABLE OF CONTENTS DATE: 06/24/2003 ADD MANUAL TABLE OF CONTENTS DATE: 06/26/2003 CATEGORY: PROCEDURES TYPE: EP ID:
EP-PS-249 REMOVE:
REV:0 ADD:
REV: 1 REMOVE: PCAF 2002-1660 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC I NUCLEAR DEPARTMENT PROCEDURE l
_l EOF DOSE CALCULATOR:
EP-PS-249 Revision 1 Emergency-Plan-Position Specific Instruction Page 1 of 3 QUALITY CLASSIFICATION:
APPROVAL CLASSIFICTION:
(
) QA Program (x)
Non-QA Program
( )
Plant;/`,
( )
Non-Plant (X)
Instruction/
EFFECTIVE DAT E:
4 6 cUa3 PERIODIC REVIEW FREQ NOY:
Two Years PERIODIC REVIEW-G-s RECOMMENDED REVIEWS:
All Proredurb Ower:
Nuclear Emergency Planning Re ponsible Supervisor Primary Dose Assessment Supervisor Responsible FUM:
Supervisor-Nuclear Emergency Planning Responsible Approver:
General Manager-Plant Support FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1
EP-PS-249 Revision 1 Page 2 of 3 EOF DOSE CALCULATOR:
Emergency-Plan-Position-Specific Instruction WHEN:
EOF is activs HOW NOTIFIED:
Paged/telept REPORT TO:
Dose Assess WHERE TO REPORT:
Emergency C OVERALL DUTY:
Analyze plume characteristics and effects.
MAJOR TASKS:
Verify operability of PICSY and MIDAS.
Determine status of TSC dose calculations.
Monitor PICSY, (METNENT screen), notifying the Dose Assessment Staffer/Dose Assessment Supervisor of significant changes.
Perform dose calculations.
ated ione
- ment Supervisor Operations Facility TAB
TAB A TAB B TAB C REVISION:
0 0
2 TAB D 1
EP-PS-249 Revision 1 Page 3 of 3 SUPPORTING INFORMATION:
TAB:
Met/Vent Data Acquisition TAB 1 MIDAS Operation Procedure TAB 2 Intentionally Blank TAB 3 PICSY Vent Release Rates Guidelines TAB 4 Intentionally Blank TAB 5 Identification of Release in Progress TAB 6
REFERENCES:
SSES Emergency Plan NUREG-0654 Planning Standards and Evaluation Criteria NUREG-0731 Guidelines for Utility Management Structure and Technical Resources EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents FDA Guidance:
'Accidental Radioactive Contamination of Human Food and Animal Feed Recommendations for State and Local Governments Federal Register (pages 47073 to 47083)
NCRP Report 55, "Protection of the Thyroid Gland in the Event of Releases of Radioiodine' (National Council on Radiation Protection and Measurements)
NUMARC Graded Response Study 10 CFR Appendix B National Interim Primary Drinking Water Regulations, (PA 570/9-76-003, U.S. Environmental Protection Agency, Washington D.C.)
Commonwealth of Penna. State Emergency Operations Plan Luzerne County Emergency Response Plan Columbia County Emergency Response Plan EC-RADN-1 002 MIDAS Source Term Calculation
TAB C EP-PS-249-C Revision 2 Page 1 of 1 MAJOR TASK:
Monitor PICSY (METNENT screen), notifying the Dose Assessment Staffer and Dose Assessment Supervisor of significant changes.
SPECIFIC TASKS:
HOW:
Monitor PICSY METNENT Screen.
HELP METEOROLOGICAL DATA ACQUISITION See TAB 1 1 a.
Report met conditions that affect monitoring stratfey currently in use to the Dose Assessment Supervisor and Dose Assessment Staffer.
(1)
Wind shift greater than 900 (2)
Wind change that alters affected sector (3)
Rain or snow (4)
Change of two or more stability classes based on A t or sigma theta data.
lb.
Report total release rate(s) change.
(1)
Data suspect (white)
(2)
Release in progress identified HELP Identification of Release In Progress See TAB 6 (3)
EAL 15.1 or 15.2 criteria exceeded (4)
Trend indicating potential for increase of release rate.
TAB D EP-PS-249-D Revision 1 Page 1 of 2 MAJOR TASK:
Perform Dose Calculations SPECIFIC TASKS:
HOW:
- 1.
When directed by the Dose Assessment Supervisor/Dose Assessment Staffer, prepare to perform a MIDAS dose calculation.
- 2.
Run MIDAS dose calculation.
HELP MIDAS OPERATION PROCEDURE See TAB 2 2a.
Follow directions provided for the type of calculation requested.
2b.
Print two copies of the "MIDAS Dose Assessment Summary Sheet."
(1)
Ensure inputs are correct.
(2)
File one copy in the ODose Calculator Log."
(3)
Insert one copy in the "Dose Summary Package for review with the DAST.
- 3.
Review "MIDAS Dose Assessment Summary Sheet", verifying content.
HELP PICSY VENT RELEASE RATE GUIDELINES See TAB 4 3a.
Identify and report any release or EAL triggers that are exceeded to DAST.
3b.
Initial and date the report when review is completed.
- 4.
Assemble reports for review.
4a.
Assemble reports in the following order:
(1)
MIDAS Dose Assessment Summary Sheet
TAB D EP-PS-249-D Revision 1 Page 2 of 2 SPECIFIC TASKS:
HOW:
(2)
Remote Monitoring Report applicable to Menu E-W calculations (3)
If projected doses exceed the PAG Values at 10 miles, the applicable MIDAS "More Reports" printout that indicates the distance in which the projected dose is less than the PAG values.
- 5.
Review Dose Summary Package with 5a.
the Dose Assessment Staffer.
File package for future reference. (The Dose Assessment Staffer may first discuss the Package contents with the Dose Assessment Supervisor.)