ML031890904

From kanterella
Jump to navigation Jump to search
Arkansas, Unit 2, License Amendment Request, Revision of Section 6.0, Administrative Controls
ML031890904
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/30/2003
From: Anderson C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN060303
Download: ML031890904 (3)


Text

= Entergy Entergy Operations, Inc.

1448 S.R. 333 Russeilville, AR 72801 Tel 501-858-4888 Craig Anderson Vice President Operations ANO 2CAN060303 June 30, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

License Amendment Request Revision of Section 6.0, Administrative Controls Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6

REFERENCES:

1. Letter dated January 31, 2002, License Amendment Request Revision of Section 6.0, Administrative Controls for Consistency with ANO-1 Improved Technical Specifications (2CAN010203)
2. Letter dated June 26, 2002, Revision of Section 6.0, Administrative Controls For Consistency with ANO-1 Improved Technical Specifications (2CAN060203)
3. Letter dated July 18, 2002, Supplement to Amendment Request to Revise Section 6.0, Administrative Controls (2CAN070204)

Dear Sir or Madam:

Pursuant to 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests the following amendment for Arkansas Nuclear One, Unit 2 (ANO-2):

1) reorganization of the ANO-2 Technical Specifications (TS) Section 6.0, Administrative Controls; 2) modification of the actions and surveillance requirements (SRs) of various other TSs to support the reorganization of Section 6.0; 3) modification to several actions and SRs that are related to systems that are shared by ANO-2 and ANO, Unit I (ANO-1); and 4) changes to various TS bases as needed to support the above changes.

This letter supercedes the previous submittals related to the revision of TS Section 6.0 (References 1, 2, and 3). The license amendment request currently in review at the NRC for the extension of the ANO-2 Emergency Diesel Generator Allowable Outage Time affects pages in this submittal.

The proposed change has been evaluated in accordance with 10 CFR 50.91(a)(1) using criteria in 10 CFR 50.92(c) and it has been determined that this change involves no significant hazards considerations. The bases for these determinations are included in the attached submittal.

2CAN060303 Page 2 of 3 The proposed change includes new commitments as summarized in Attachment 4. The NRC has approved similar Technical Specification changes for Nine Mile Point Unit 1.

Entergy requests approval of the proposed amendment by October 15, 2003 in order to provide an implementation period between the ANO refueling outages. Once approved, the amendment shall be implemented within 120 days. Although this request is neither exigent nor emergency, your prompt review is requested.

If you have any questions or require additional information, please contact Dana Millar at 601-368-5445.

I declare under penalty of peJury that the foregoing is true and correct. Executed on June 30, 2003.

Sincerely, CGA/dm Attachments:

1. Analysis of Proposed Technical Specification Change
2. Proposed Technical Specification Changes (mark-up)
3. Changes to Technical Specification Bases Pages - For Information Only
4. List of Regulatory Commitments
5. Proposed Technical Specification Changes (clean pages)

2CAN060303 Page 3 of 3 cc:

Mr. Thomas P. Gwynn Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas W. Alexion MS 0-7D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205