ML031840235

From kanterella
Jump to navigation Jump to search
Closed Meeting Kewaunee IA-03-024 Predecisional Enforcement Conference
ML031840235
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/02/2003
From: Creed J
Division of Reactor Safety III
To:
References
IA-03-024
Download: ML031840235 (3)


Text

NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS NOT OPEN TO PUBLIC ATTENDANCE July 2, 2003 IA-03-024 Individual: Contract Supervisor Name of Facility: Kewaunee Nuclear Power Plant Docket No: 50-305 Date and Time of Meeting August 5, 2003, at 9:00 a.m. (CDT)

Location of Meeting: U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Purpose of Meeting: Predecisional Enforcement Conference to discuss: (1) an apparent violations of NRC FFD requirements regarding a failure to take action regarding detection of alcohol on a plant employee and (2) an apparent violation including inaccurate information provided to an OI investigator regarding the FFD concern noted above. This meeting is not open for public observation because it involves an investigation report that is not publicly available.

NRC Attendees:

C. Pederson, Director, Division of Reactor Safety, RIII J. Creed, Safeguards Program Manager B. Clayton, Enforcement/Investigation Officer T. Madeda, Physical Security Inspector Others as Designated Other Attendees:

Day and Zimmerman, Inc. Management Representatives Others as Designated

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to James R. Creed at 630-829-9857 by COB August 1, 2003 Approved By: /RA/

James R. Creed Safeguards Program Manager Division of Reactor Safety Distribution:

F. Congel (FJC), Director, Office of Enforcement D. Dambly (DCD), Assistant General Counsel for Material Litigation and Enforcement, OGC B. W. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR L. Marsh (LBM), Acting Director, Division of Licensing Project Management, NRR M. Banerjee (MXB), NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Roland (WHR), Project Directorate, Division of Licensing Project Management, NRR L. Rossbach (LWR), Project Manager, Project Directorate, Division of Licensing Project Management, NRR B. Rogers (BHR), NRR M. Fahey (MKF), OI:HQ G. E. Grant (GEG), Director, Division of Reactor Projects, RIII S. A. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. J. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII P. Louden, Chief, Branch 5, Division of Reactor Projects R. Krsek, SRI, Kewaunee DRS Branch Chiefs B. Clayton (HBC), Enforcement/Investigations Officer, RIII C. Weil, RIII B. Berson, RIII R. Paul, RIII R. M. Lickus (RML2), State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2)

V. Mitlyng (VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA OEMAIL OEWEB DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031840235.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME TMadeda:aa CWeil for PLouden JCreed BClayton DATE 07/2/03 07/2/03 07/2/03 07/2/03 OFFICIAL RECORD COPY