ML031830533
| ML031830533 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/01/2003 |
| From: | Louden P Division of Nuclear Materials Safety III |
| To: | Cayia A Nuclear Management Co |
| References | |
| Download: ML031830533 (4) | |
Text
July 1, 2003 Mr. Alfred J. Cayia Site Vice-President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
PUBLIC MEETING TO DISCUSS THE POINT BEACH NUCLEAR PLANT SELF-ASSESSMENT IN PREPARATION FOR NRC SUPPLEMENTAL INSPECTION PER PROCEDURE 95003
Dear Mr. Cayia:
This refers to the public meeting held on June 24, 2003, in Manitowoc, Wisconsin, to discuss preparations by the NRC and Point Beach Nuclear Plant for the upcoming three team inspections that will be conducted as part of the NRCs 95003 supplemental inspection efforts.
At this meeting, the NRC presented general information about the NRCs Reactor Oversight Process and specific information about the 95003 team inspections. Mr. Mano Nazar, you, and members of your staff presented information on corrective actions taken for recent problems with the auxiliary feedwater system related to instrument air and to recirculation line orifices, the development and status of your Excellence Plan to improve station performance, and your preparations for the 95003 supplemental inspection.
The handouts provided at the meeting by the NRC and by your staff and a listing of principal NRC and Nuclear Management Company attendees are attached as Enclosures 1, 2 and 3 to this letter.
In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
A. Cayia If you have any questions regarding this meeting, please contact me at (630) 829-9627.
Sincerely,
/RA by M. Kunowski acting for/
Pat Louden, Acting Chief Branch 7 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosures:
- 1) NRC Handout
- 2) NMC Handout
- 3) List of Principal Attendees cc w/encl:
R. Grigg, President and Chief Operating Officer, WEPCo John Paul Cowan, Chief Nuclear Officer Licensing Manager D. Weaver, Nuclear Asset Manager Joseph Jensen, Plant Manager Gordon P. Arent, Manager, Regulatory Affairs Jonathan Rogoff, Esquire General Counsel Mano K. Nazar, Senior Vice President J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer D. Markwardt, Manitowac County Board Chairman N. Crowley, Director, Manitowac Emergency Management G. Novickis, Chairman, Kewaunee County Board The Honorable Darin A. Jeanquart G. Buckley, Two Rivers City Manager L. Hucek, Director, Kewaunee Emergency Management C. Meyer, President, Village of Mishicot INPO
DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML031830533.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MKunowski/trn MKunowski acting for AVegel DATE 7/01/03 7/01/03 OFFICIAL RECORD COPY
A. Cayia ADAMS Distribution:
WDR DFT DWS H. Nieh (HKN), OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Point Beach DRPIII DRSIII PLB1 JRK1 PUBLIC MEETING PRINCIPAL ATTENDEES June 24, 2003 Nuclear Management Company, LLC Mano Nazar Senior Vice-President, NMC Fred Cayia Site Vice-President, Point Beach Joe Jensen Plant Manager, Point Beach Doug Johnson Team Manager, Point Beach Excellence Team Dan Fadel Director of Engineering, Point Beach Gordon Arent Regulatory Affairs Manager, Point Beach NRC Geoff Grant Director, Division of Reactor Projects Pat Louden Chief, Branch 5, and Acting Chief, Branch 7, Division of Reactor Projects Ken Riemer Chief, Plant Support Branch Deirdre Spaulding Project Manager, Office of Nuclear Reactor Regulation Mike Morris Resident Inspector, Point Beach Mike Kunowski Project Engineer, Assistant Team Leader, 95003 Inspection Team