May 2003 Monthly Operating Report for Susquehanna, Units 1 & 2
ML031820629
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/12/2003
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005639
Download: ML031820629 (7)


Text

% I I

IJIJ~ 4 e

.4

  • No-l Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pplweb.com June 12,2003 U. S. Nuclear Regulatory Cornmission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005639 The May 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yo S, Richard L. Anderson P 413,%fOA; JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 06/14/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susguehanna Steam Electric Station (Ul)

2.

Reporting Period:

May 2003

3.

Design Electrical Rating (Net MWe):

1115

4.

Maximum Dependable Capacity (Net MWe):

1105 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 728.74 0

792,540 Yr.-to-Date 3623 3623 3607.7 0

3,978,337 Cumulative 175,152 145,487.5 143,261.5 0

147,231,886 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 6/14/2003 J. J. Hennings (570) 542-3747 REPORT MONTH May 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.

Summary: The only significant power reduction in May was on 5/03. To perform planned maintenance on the main transformer, the Turbine/Generator was required to be off-line. On May 3, 2003 the Turbine/Generator was taken off line while the reactor power remained at 17%. Maintenance was completed, and the Turbine/Generator placed on line later that day. 100% power was reached on May 5, 2003 1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. Hennings Date:

6114/2003 Telephone:

(570) 542-3747 Challenaes to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNrr DATE COMPLETED BY TELEPHONE 50-388 Two 6/14/03 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susguehanna Steam Electric Station (U2)

2.

Reporting Period:

May 2003

3.

Design Electrical Rating (Net MWe):

1172*

4.

Maximum Dependable Capacity (Net MWe):

1153*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

861,017 Yr.-to-Date 3,623 2,609.4 2,564.9 0

2,758,834 Cumulative 160,392 138,758.8 136,771.6 0

142,869,828 NOTES:

During the U2 1 Ptb Refueling Outage, the Main Turbine was replaced with a newly designed HP and three LP turbines. Preliminary Rating Data: The Design Rating and Maximum Dependable Capacity Rating may change following the analysis of the official Performance/Acceptance Test performed in early June.

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 6114/2003 J. J. Hennings (570) 542-3747 REPORT MONTH May 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor l

3ummarf No signdicant power changes in May.

l No shutdowns this month.

Summary:. No significant power changes in May.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by: J. J. Hennings Date:

06/1412003 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.