- No-l Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pplweb.com June 12,2003 U. S. Nuclear Regulatory Cornmission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005639 The May 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yo S, Richard L. Anderson P 413,%fOA; JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 06/14/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (Ul)
- 2.
Reporting Period:
May 2003
- 3.
Design Electrical Rating (Net MWe):
1115
- 4.
Maximum Dependable Capacity (Net MWe):
1105 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 728.74 0
792,540 Yr.-to-Date 3623 3623 3607.7 0
3,978,337 Cumulative 175,152 145,487.5 143,261.5 0
147,231,886 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 6/14/2003 J. J. Hennings (570) 542-3747 REPORT MONTH May 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
Summary: The only significant power reduction in May was on 5/03. To perform planned maintenance on the main transformer, the Turbine/Generator was required to be off-line. On May 3, 2003 the Turbine/Generator was taken off line while the reactor power remained at 17%. Maintenance was completed, and the Turbine/Generator placed on line later that day. 100% power was reached on May 5, 2003 1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Date:
6114/2003 Telephone:
(570) 542-3747 Challenaes to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNrr DATE COMPLETED BY TELEPHONE 50-388 Two 6/14/03 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (U2)
- 2.
Reporting Period:
May 2003
- 3.
Design Electrical Rating (Net MWe):
1172*
- 4.
Maximum Dependable Capacity (Net MWe):
1153*
5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
861,017 Yr.-to-Date 3,623 2,609.4 2,564.9 0
2,758,834 Cumulative 160,392 138,758.8 136,771.6 0
142,869,828 NOTES:
During the U2 1 Ptb Refueling Outage, the Main Turbine was replaced with a newly designed HP and three LP turbines. Preliminary Rating Data: The Design Rating and Maximum Dependable Capacity Rating may change following the analysis of the official Performance/Acceptance Test performed in early June.
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 6114/2003 J. J. Hennings (570) 542-3747 REPORT MONTH May 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor l
3ummarf No signdicant power changes in May.
l No shutdowns this month.
Summary:. No significant power changes in May.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by: J. J. Hennings Date:
06/1412003 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.