TMI SRO License Exam 05/12/03 TMI-I OPERATOR TRAINING JOB PERFORMANCE MEASURE B.1.a Page 1 of 6
B.1.a Revision 1 05/12/2003 TASK TITLE:
PERFORM EMERGENCY BORATION (ALTERNATE PATH REQUIRES BACKUP METHOD TO BE IMPLEMENTED)
TASK NUMBER:
004C070101 Perform boration of the RCS from the BAMT or the RBAT.
TIF:
3.24 KIA
REFERENCE:
System:
Chemical and Volume Control (004)
KIA:
A4.07 (Page 3.1-19)
Ability to manually operate and/or monitor in the control room:
boration/dilution.
Rating (ROISRO):
3.913.7 POSITION:
S R O H R O H N L O O EVALUATION METHOD:
PERFORM H SIMULATE 0 EVALUATION LOCATION:
SIMULATOR [XI IN-PLANT 0 CONTROL ROOM 0 OTHER 0 TASK STANDARDS: Examinee initiates emergency boration flow from the BAMT to the Makeup (in accordance with Guide I), verifies total RCS injection flow is greater than 50 gpm (in accordance with Rule 5.
APPROXIMATE COMPLETION TIME: 10 minutes TIME-CRITICAL TASK COMPLETION TIME:
NA minutes REQUIRED TOOLS OR MATERIALS: OP-TM-EOP-010 Abnormal Transients Rules, Guides and Graphs.
REFERENCES:
OP-TM-EOP-010 Abnormal Transients Rules, Guides and Graphs.
ALTERNATE PATH JPM? YES SIMULATOR SETUP:
INITIALIZATION:
- 2. Activate malfunctions and DI overrides listed below.
- 3. Manually trip the reactor.
- 4. Adjust Pressurizer level setpoint to 100 inches (25%)
- 5. Allow RCS pressure and temperature to stabilize in post-trip window.
EVENT TRIGGERS: NIA MALFUNCTIONS:
MU24A - Makeup Valve ES Alignment Failure (MU-V-14A).
MU24B - Makeup Valve ES Alignment Failure (MU-V-14B).
RD0203 - Stuck Rod (Group 1 ROd3).
RD0226 - Stuck Rod (Group 4 Rod 1).
REMOTE FUNCTIONS: N/A OVERRIDES:
02A5S59-ZDIPBOMUV14A (0FF)- Overrides MU-V-14A OPEN Pushbutton DI (false).
02A5S77-ZDIPBOMUV14B (OFF) - Overrides MU-V-14B OPEN Pushbutton DI (false).
MONITOR: N/A Page 2 of 6
B. 1.a Revision I 0511 2/2003 READ TO STUDENT When I tell you to begin, you are to PERFORM EMERGENCY BORATION OF THE RCS. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
The reactor was manually tripped from full power.
Two safety rods failed to drop.
The reactor is SHUTDOWN.
RCS T-ave is 555°F.
RCS Pressure is returning to post trip window.
INITIATING CUE:
The Unit Supervisor directs you to perform RCS emergency boration, in accordance with OP-TM-EOP-010, Rule 5, Emergency Boration.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 3 of 6
JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to PERFORM RCS EMERGENCY BORATION. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
The reactor was manually tripped from full power.
Two safety rods failed to drop.
The reactor is SHUTDOWN.
RCS T-ave is 555°F.
RCS Pressure returning to post trip window.
INITIATING CUE:
The Unit Supervisor directs you to perform RCS emergency boration, in accordance with OP-TM-EOP-010, Rule 5, Emergency Boration.
TIME CRITICAL: NO Page 4 of 6
- 6
- 7 STEP STANDARD SIU ll I
1 2
- 3 4
5 Examinee opens MU-V-51.
Examinee obtains a copy of OP-TM-EOP-010, Abnormal Transients Rules, Guides and Graphs, and begins implementation of Rule 5, Emergency Boration.
Examinee attempts to open MU-V-14A and MU-V-14B.
Examinee recognizes failure of MU-V-14A and MU-V-14B.
14A and MU-V-14B.
Examinee references Guide 1, Emergency Boration Backup Methods.
Examinee verifies at least 1 Makeup Pump is operating.
With Rule 5, Emergency Boration, in hand, the examinee depresses the OPEN pushbuttons for MU-V-14A and MU-V-14B.
Examinee depresses the OPEN pushbuttons for MU-V-14A and MU-V-14B on Console Center.
Examinee notes inability to open both MU-V-Examinee obtains a copy of Guide 1, Emergency Boration Backup Methods.
Examinee verifies that a Makeup Pump is operating by checking the Makeup Pump red breaker status light is illuminated.
Examinee starts both boric acid injection pumps CA-P-1A and CA-P-1 B.
Examinee returns to Rule 5, Emergency Boration, and verifies adequate RCS injection flow exists.
~~~
~~~~~~~~
Examinee depresses the OPEN pushbutton for MU-V-51 (emergency boration valve from BAMT), and observes the valve opens (red light illuminates, green light de-energizes).
Examinee starts both boric acid injection pumps CA-P-1A and CA-P-1 B by turning the control switches to START.
0 Examinee verifies lights status: red energized, green de-energized.
0 Pump stroke counters can be heard clicking.
Examinee verifies greater than 50 gpm total RCS injection flow (MU, SI & HPI) using RCS Makeup and RCP Seal Injection flow meters on Console Center.
- e > 50 GPM verified, JPM may be terminated.
END TASK Page 5 of 6
- 6. I.a Revision 1 OW1 2/2003 JPM CHANGE HISTORY PAGE
~
REVISION 1
~
DATE 04/12/03 05/12/03 REFERENCE TITLE OP-TM-EOP-01 0 Abnormal Transients Rules, Guides and Graphs Abnormal Transients Rules, Guides and Graphs OP-TM-EOP-010 DESCRIPTION (Include AI # if Appropriate) per NRC validation comments Page 6 of 6
TMI-1 OPERATOR TRAINING JOB PERFORMANCE MEASURE I I.2.05.130 B.1.b TMI SRO License Exam OW1 2/03 Page 1 of 7
B.1.b 1 1.2.05.130 Revision 4 05/12/2003 TASK TITLE:
RESPOND TO AN INADVERTENT ES ACTUATION TASK NUMBER: 0000300501 Respond to an inadvertent ES actuation.
TIF:
3.72 KIA
REFERENCE:
System:
01 3 Engineered Safety Features Actuation System (ESFAS)
Ability to (a) predict the impacts of the following malfunctions or operations on ESFAS; and (b) based Ability on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Inadvertent ESFAS actuation.
WA:
A2.06 (Page 3.2-26)
Rating (RO/SRO): 3.7/4.0 POSITION:
S R O H R O H N L O O EVALUATION METHOD:
PERFORM SIMULATE [7 EVALUATION LOCATION:
SIMULATOR [XI IN-PLANT [7 CONTROL ROOM OTHER 0 TASK STANDARDS:
HPI flow to RCS terminated and reactor does not trip on high RCS pressure.
APPROXIMATE COMPLETION TIME: 10 minutes.
TIME-CRITICAL TASK COMPLETION TIME:
NA.
CONDITION CRITICAL:
Yes, Failure criteria is if the reactor trips on High RCS Pressure due to increase in RCS inventory.
REQUIRED TOOLS OR MATERIALS: OP 11 05-3, Safeguards Actuation System, pages 31 and 32, Rev. 43.
REFERENCES:
11 05-3 Safeguard Actuation system Rev. 43.
ALTERNATE PATH JPM? YES; This JPM is ALTERNATE-PATH because the A-train 1600# Manual ES channels cannot be re-enabled after defeat per OP 1105-3, or the actuation will reoccur due to the relay failure mode. In addition, only one makeup pump is running and must be left on for makeup and seal injection.
SIMULATOR SETUP:
INITIALIZATION:
EVENT TRIGGERS:
NIA.
MALFUNCTIONS:
N/A.
REMOTE FUNCTIONS:
OVERRIDES:
MO N IT0 R:
NIA.
Initialize the simulator at IC16.
Start MU-P-?A, start IC-P-IB, stop IC-P-IA, and stop MU-P-1B.
Change CCR12 to NS.
Activate DI Override 02A4S66ZDIPBlRCA ON PBIIRCA to ON.
Page 2 of 7
B.1.b 1 1.2.05.130 Revision 4 05/12/2003 READ TO STUDENT When I tell you to begin, you are to RESPOND TO THE INADVERTENT ES ACTUATION. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
0 0
0 0
The plant is at 100% power, steady state.
MU-P-1A is running with cooling by NSCC, and IC-P-1 B is running, in preparation for MU-P-1 B system outage.
The tagging order for MU-P-1 B is being prepared at this time.
There is no major equipment out of service, and there are no surveillances in progress.
Train 'A' ES actuation occurred 10 seconds ago, and has been declared inadvertent by the Unit Supervisor.
INITIATING CUE:
The Unit Supervisor directs you to RESPOND TO THE INADVERTENT ES ACTUATION, in accordance with 1105-3, Safeguards Actuation System, section 4.2, Actions for Inadvertent Actuations - Level 2.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 3 of 7
JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When you are told to begin, you are to RESPOND TO THE INADVERTENT ES ACTUATION. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
The plant is at 100% power, steady state.
MU-P-1A is running with cooling by NSCC, and IC-P-1 B is running, in preparation for MU-P-1 B system outage.
The switching order for MU-P-1 B is being prepared at this time.
There is no major equipment out of service, and there are no surveillances in progress.
An ES actuation that occurred 10 seconds ago has been declared inadvertent by the Unit Supervisor.
INITIATING CUE:
The Unit Supervisor directs you to RESPOND TO THE INADVERTENT ES ACTUATION, in accordance with 11 05-3, Safeguards Actuation System, section 4.2, Actions for Inadvertent Actuations - Level 2.
TIME-CRITICAL: NO Page 4 of 7
f3.l.b 11.2.05.130 Revision 4 031 2/2003 STEP STANDARD I SlU NOTE: Although ESAS bypassldefeat steps are delineated in 1105-3, it is management EXPECTATION that the Examinee can perform these steps from memory.
I/
L Examinee verifies that the ES Actuation was not due to a valid signal.
Examinee requests permission to clear (Defeat) ES actuation signal.
Examinee verifies no valid ES actuation is present and that it is an inadvertent ES actuation.
0 RCS Pressure is normal for plant condition RB Pressure normal (< 2psig)
Examinee requests permission to clear (Defeat) ES actuation signal from the Unit Supervisor.
CUE:
When asked for permission to clear ES Actuation, as the Unit Supervisor grant permission to ONLY DEFEAT the ES Actuation Signal.
ll Examinee defeats Train A 1600# manual ES actuation signals.
NOTE: If examinee defeats and then re-enables the channels per OP 1105-3, the channels will re-actuate due to the relay failure mode. If this occurs the Examinee will be required to DEFEAT the signals again.
Examinee reopens MU-V-36 using pushbutton on CC, and verifies MU-V-37 open.
NOTE: It is critical that the Examinee does not operate MU Pump for > 30 seconds with flow < 40 gpm (OP 11 04-2, Makeup and Purification System).
Examinee continues operation of MU-P-IA, since it is supplying RCS makeup and RCP seal injection flow.
Examinee depresses ENABLWDEFEAT pushbuttons (ONE TIME EACH) to DEFEAT on CC: PB2/RCA, PBYRCA, and PBWRCA Indications that Train A 1600# manual ES actuation signals have been successfully defeated:
Yellow defeat lamps illuminated on CC pushbuttons for PB2/RCA, PB3/RCA, and PBWRCA.
Train A 1600# Manual Actuation blue lamps de-energized on Panel PCR.
~
~
~
Examinee depresses MU-V-36 open pushbutton.
Indications that MU-V-36 opens:
0 0
Red OPEN pushbutton lamp illuminates.
Green CLOSE pushbutton lamp de-energizes.
Examinee verifies MU-V-37 is open.
Indications that MU-V-37 is open:
0 a
Red OPEN pushbutton lamp is de-energized.
Green CLOSE pushbutton lamp is i I lu m inated.
MU-P-1A is NOT secured as indicated by no change in status on CC:
Red breaker closed light remains illuminated.
Green breaker open lamp remains de-energized.
0 Page 5 of 7
6.l.b 11.2.05.130 Revision 4 STEP Examinee closes MU-V-16A and MU-V-16B using pushbuttons on CC, to terminate HPI flow as indicated on CC.
NOTE: JPM may be terminated if the reactor trips due to high RCS pressure.
Examinee verifies MU-V-12 open, and then closes MU-V-14A.
Reset 27/86 lockout relays if actuated.
NOTE: 27/86 relays do not actuate, therefore they do not need to be reset.
STANDARD
- 6
- 7 8
MU-V-16A and MU-V-16B are closed.
Indications on CC pushbuttons:
0 Green CLOSE lamps are energized.
0 Red OPEN lamps are de-energized.
Reactor trip on high RCS pressure constitutes a JPM failure.
MU-V-12 is verified open by observation of Appendix R sticker applied to the control console at MU-V-12 OPENKLOSE pushbuttons.
MU-V-14A is closed by depressing the CLOSE pushbutton on CC.
Indications that MU-V-14A is closed:
Status at CC pushbuttons:
0 Green CLOSE lamp is illuminated.
Red OPEN lamp is de-energized.
Examinee identifies that the 27/86 lockout relays have not actuated and do not need to be reset.
Indications that 27/86 lockout relays have not actuated:
Status at PCR status lamps:
0 0
White lamp for Bus 1 P is de-energized.
White lamp for Bus 1 P is de-energized.
12003 SIU -
END TASK Page 6 of 7
REVISION 4
DATE 05/12/03 B.1.b 11.2.05.130 Revision 4 05/12/2003 JPM CHANGE HISTORY PAGE Page 7 of 7
TMI SRO License Exam OW1 2/03 TMI-1 OPERATOR TRAINING JOB PERFORMANCE B.l.c MEASURE Page 1 of 6
B. 1.c Revision 1 05/12/2003 TASK TITLE:
RESPOND TO HIGH PRESSURE INJECTION INITIATION (ALT PATH - MU-V-14A FAILS TO OPEN).
TASK NUMBER:
0004C240501 Respond to a large break LOCA.
TI F:
4.21 KIA
REFERENCE:
System:
Emergency Core Cooling System (006)
WA:
A2.02 (Page 3.3-5)
Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS, and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: loss of flow path.
Rating (RO/SRO):
3.9/4.3 POSITION:
S R O H R O H N L O O EVALUATION METHOD:
PERFORM H SIMULATE 0 EVALUATION LOCATION:
SIMULATOR H IN-PLANT 0 CONTROL ROOM 0 OTHER TASK STANDARDS: Using OP-TM-EOP-010 Guide 4, HPI Failure, examinee bypasses Channel A ESAS signals, stops MU-P-1 A.
APPROXIMATE COMPLETION TIME: 15minutes TIME-CRITICAL TASK COMPLETION TIME:
NA minutes REQUIRED TOOLS OR MATERIALS: OP-TM-EOP-01 0 Abnormal Transients Rules, Guides and Graphs.
REFERENCES:
OP-TM-EOP-010 Abnormal Transients Rules, Guides and Graphs.
OP 1105-3, Engineered Safeguards Actuation, pages 10 through 14, Rev. 43.
ALTERNATE PATH JPM? YES SIMULATOR SETUP:
INITIALIZATION:
- 1. Select IC-I 6 - 100% hot full power (MOC)
- 2. Activate malfunctions and DI override listed below.
EVENT TRIGGERS: N/A MALFUNCTIONS:
MU24A - Makeup Valve ES Alignment Failure (MU-V-14A).
THO5 at 0.3%.
REMOTE FUNCTIONS: N/A OVERRl D ES:
02A5S59-ZDIPBOMUV14A (0FF)- Overrides MU-V-14A OPEN Pushbutton DI (false).
MONITOR: N/A Page 2 of 6
B. 1.c Revision 1 0511 212003 READ TO STUDENT When I tell you to begin, you are to RESPOND TO AN ECCS ACTUATION. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
The reactor was manually tripped from full power.
There is a LOCA inside the RB ESAS has received an automatically actuation signal.
INITIATING CUE:
The Unit Supervisor directs you to verify and respond to the ECCS actuation.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 3 of 6
JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to RESPOND TO AN ECCS ACTUATION. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
0 0
0 The reactor was manually tripped from full power.
There is a LOCA inside the RB ESAS has received an automatically actuation signal.
INITIATING CUE:
The Unit Supervisor directs you to verify and respond to the ECCS actuation.
TIME CRITICAL: NO Page 4 of 6
B.l.c Revision 1 0511 212003 STEP STANDARD SlU
~~
CUE: If requested, concur with attempt to manually open MU-V-14A.
2 1 Examinee announces failure of MU-V-14A I 0s-24 Section 4.6.1
- I to automatically open, and may request CRS concurrence to attempt to manually open MU-V-14A.
Examinee diagnoses MU-V-14A is closed.
OS-24 Section 4.6.1 If a safety system has or should have actuated, then ensure that all components are in the required position or state.
If a safety system has or should have actuated, then ensure that all components are in the required position or state.
i 9
3 c--
Note: Task may be terminated when Guide 4 actions are completed.
END TASK Examinee depresses MU-V-14A OPEN pushbutton to attempt to open the valve.
~
_ _ _ _ ~ _ _ _ _
5 Examinee obtains a copy of OP-TM-EOP-01 0 Guide 4, HPI Failure.
Examinee depresses MU-V-14A open pushbutton and recognizes that the valve does not open (still indicates closed).
~~~
Examinee obtains a copy of OP-TM-EOP-010 Guide 4, HPI Failure.
r Examinee requests US concurrence to implement Guide 4, HPI Failure.
~~~
Examinee requests US concurrence to implement Guide 4, HPI Failure.
CUE: When requested, concur with implementation of Guide 4, HPI Failure.
CUE: If Guide 4 NOT requested, ask Examinee for recommendations. Do NOT allow A.O. (Aux Operator) to go locally to operate valve, if requested by examinee. Recommendations must be Control Room I actions.
- 6
- 7
- 8 Examinee bypassesldefeats Channel A ESAS signals applicable to MU-P-IA.
NOTE: Examinee may also bypassldefeat Train B actuation, but there will no effect on plant response.
Examinee stops MU-P-1A.
Examinee verifies adequate HPI flow exists, using Guide 4 Figure.
Examinee announces completion of Guide 4, HPI Failure and returns card to holder.
Examinee depresses all 3 A Train 1600 psig ESAS bypass pushbuttons.
0 Channel Bypassed lights are illuminated.
If RCS pressure 2950 psig, Examinee depresses all 3 A Train 500 psig ESAS bypass pushbuttons.
0 Channel Bypassed lights are illuminated.
Examinee depresses 2 A Train 4 psig ESAS DEFEAT pushbuttons.
0 Channel DEFEAT lights are illuminated.
Examinee turns MU-P-1A control switch to stop position, and verifies breaker status lights: green light illuminated, red light de-energized.
Examinee determines that adequate HPI flow exists, since flow is greater than the lower flow limit indicated on Guide 4 figure.
Examinee announces completion of Guide 4, HPI Failure and returns card to holder.
Page 5 of 6
B.l.c Revision 1 0511 2/2003 REVISION 0
1 DATE 04/12/03 05/12/03 JPM CHANGE HISTORY PAGE REFERENCE TITLE OP-TM-EOP-010 Abnormal Transients Rules, Guides and Graphs none DESCRIPTION (Include AI # if Appropriate) post NRC validation comments incorporated Page 6 of 6
TMI SRO License Exam 0511 2/03 TMI-I OPERATOR TRAINING JOB PERFORMANCE MEASURE B.1.d Page 1 of 8
B.1.d Revision 1 0511 2/2003 TASK TITLE:
RESPOND TO HIGH PRESSURE INJECTION INITIATION (ALT PATH - DH-V-66 FAILS TO OPEN).
TASK NUMBER:
OOOC240501 Respond to a large break LOCA.
TIF:
4.21 KIA
REFERENCE:
System:
Emergency Core Cooling System (006)
KIA:
A4.05 (Page 3.3-5)
Ability to manually operate and/or monitor in the control room:
Transfer of ECCS flow paths prior to recirculation.
Rating( RO/SRO):
3.913.8 POSITION:
SRO(XIRO(XI N L O O EVALUATION METHOD:
PERFORM SIMULATE 0 EVALUATION LOCATION:
SIMULATOR IN-PLANT 0 CONTROL ROOM 0 OTHER 0 TASK STANDARDS: Using OP-TM-EOP-010 Guide 3, LPI Failure, examinee stops DH-P-1 B, directs an Auxiliary Operator to open DH-V-38A and DH-V-38B, and then maximizes LPI flow (13000 gpm) while balancing flow from DH-P-1A between the two LPI trains.
APPROXIMATE COMPLETION TIME: 25 minutes TIME-CRITICAL TASK COMPLETION TIME:
NA minutes REQUIRED TOOLS OR MATERIALS: OP-TM-EOP-010 Abnormal Transients Rules, Guides and Graphs.
REFERENCES:
OP-TM-EOP-010 Abnormal Transients Rules, Guides and Graphs:
Guide 21, Transfer to RB Sump Recirculation.
Rule 2, HPVLPI Throttling.
Guide 3, LPI Failure ALTERNATE PATH JPM? YES SIMULATOR SETUP:
INITIALIZATION:
- 1. Select IC-I 6 - 100% hot full power (MOC)
- 2. Activate malfunctions and DI override listed below.
- 3. Trip all 4 RCPs.
- 4. Allow BWST level to lower to 9.5 feet, sump level >32 - 63.
- 5. MAY NEED to use temporary stickers to give desired RB sump and BWST LEVELS (for the sake of setup time compression)
- 7. Then PTL all MUPs.
EVENT TRIGGERS: N/A MALFUNCTIONS:
THO4A at 95%, ramped over 10 seconds (LOCA at A Hot Leg Nozzle.).
REMOTE FUNCTIONS: DHR14 will be used to open DH-V-38A and DH-V-38B during this exercise.
OVERRIDES:
03A6S44-ZDIPBODHV6B (0FF)- Overrides DH-V-6B OPEN Pushbutton DI (false).
MONITOR: NIA Page 2 of 8
B.1.d Revision 1 051 2/2003 READ TO EXAMINEE When I tell you to begin, you are to perform procedural actions to TRANSFER TO RB SUMP RECIRCULATION.
Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions.
Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
The reactor was manually tripped from full power.
There is a LOCA inside the RB.
ESAS has automatically actuated and is defeatedlbypassed.
LPI flows have been throttled.
HPI flow has been terminated.
Core Flood tanks have discharged into the reactor vessel.
BWST level is approaching 9.5 feet.
RB Flood level is > 32 inches.
Both Reactor Building Spray Pumps BS-P-1NB are operating.
INITIATING CUE:
The Unit Supervisor directs you to perform procedural actions to transfer to RB Sump recirculation, in accordance with OP-TM-EOP-010 Guide 21, Transfer to RB Sump Recirculation.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 3 of 8
JPM INSTRUCTION SHEET DIRECTIONS TO EXAMINEE:
When I tell you to begin, you are to perform procedural actions to TRANSFER TO RB SUMP RECIRCULATION.
Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions.
Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
The reactor was manually tripped from full power.
There is a LOCA inside the RB.
ESAS has automatically actuated and is defeated/bypassed.
LPI flows have been throttled.
HPI flow has been terminated.
Core Flood tanks have discharged into the reactor vessel.
BWST level is approaching 9.5 feet.
RB Flood level is > 32 inches.
Both Reactor Building Spray Pumps BS-P-1NB are operating.
INITIATING CUE:
The Unit Supervisor directs you to perform procedural actions to transfer to RB Sump recirculation, in accordance with OP-TM-EOP-010 Guide 21, Transfer to RB Sump Recirculation.
TIME CRITICAL: NO Page 4 of 8
B.l.d Revision 1 0511 212003 Examinee obtains a copy of OP-TM-EOP-310 Guide 21, Transfer to RB Sump Recirculation.
STEP STANDARD SIU Examinee announces initiation of RB Sump Recirculation over the plant page and radio.
Examinee verifies RB Flood level >32 inches.
Examinee attempts to open DH-V-6A and DH-V-6B.
Examinee diagnoses DH-V-6B will not open.
Examinee announces inability to open DH-V-6B, and requirement to perform Response Not Obtained Actions for this equipment failure.
Examinee obtains a copy of OP-TM-EOP-010 Guide 21, Transfer to RB Sump Recirculation.
Examinee announces initiation of RB Sump Recirculation over the plant page and radio in accordance with Step 1 of Guide 21, Transfer to RB Sump Recirculation.
Flood level indicator con Console Right (CR) indicates >32 inches.
Examinee depresses OPEN pushbuttons for DH-V-6A and DH-V-6B to open the valves.
Indications that DH-V-6A is open.
Indications on CC pushbuttons:
0 0
Red OPEN pushbutton lamp is illuminated.
Green CLOSE pushbutton lamp is de-energized.
Indications that DH-V-6B is closed.
Indications on CR pushbuttons:
0 0
Green CLOSE pushbutton lamp is illuminated.
Red OPEN pushbutton lamp is de-energ ized.
Indications that DH-V-6B is closed.
Indications on CR pushbuttons:
0 0
Green CLOSE pushbutton lamp is illuminated.
Red OPEN pushbutton lamp is de-energized.
Examinee announces failure of DH-V-6B to open, and requests US concurrence to stop DH-P-1 B and to initiate Guide 3, LPI Failure. This is required by Step 3 (remedial action) of Guide 21, Transfer to RB Sump Recirculation.
CUE: As Unit Supervisor, concur that DH-P-1 B should be stopped, and Guide 3, LPI Failure, should be implemented.
CUE: WHEN the Examinee requests permission to bypasddefeat ES signals, as Unit Supervisor, give examinee permission to bypassldefeat ESAS.
Page 5 of 8
B.1.d Revision 1 Using Guide 21, Transfer to RB Sump Recirculation, Examinee stops DH-P-1 B in 05/
STEP I
STANDARD Examinee rotates DH-P-1 B control switch (CR) counter-clockwise to stop the Pump.
accordance with Response Not Obtained column.
Indications that DH-P-1 B is stopped:
Green breaker closed lamp is illuminated.
I Red breaker closed lamr, is de-eneraized.
Examinee requests US concurrence to initiate Guide 3, LPI Failure.
Examinee obtains a copy of OP-TM-EOP-010 Guide 3, LPI Failure.
In accordance with Guide 3, LPI Failure, Examinee closes DH-V-4B.
Examinee US concurrence to initiate Guide 3, LPI Failure. This is required by Step 3 (remedial action) of Guide 21, Transfer to RB Sump Recirculation.
CUE: As Unit Supervisor, concur that Guide 3, LPI Failure, should be implemented.
Examinee depresses DH-V4B CLOSE pushbutton on CR.
Indications that DH-V-4B is closed:
0 Green CLOSE pushbutton lamp is illuminated.
Red OPEN pushbutton lamp is de-I energized.
Examinee asks if either DH-V-38A or DH-V-38B is inaccessible.
- 7 8
- 9
- I 0
- I 1 12 CUE: WHEN the Examinee requests permission to bypassldefeat Train A ES signals, as Unit Supervisor, give examinee permission to bypassldefeat ESAS.
Examinee asks if either DH-V-38A or DH-V-38B is inaccessible tpo determine procedure flow path in accordance with Guide 3, step 2.0.2.
CUE: DH-V38A and DH-V-38B are both accessible at this time.
Examinee directs an Auxiliary Operator to open DH-V-38A and DH-V-38B.
NOTE: Expected response time is in excess of 10 minutes. Therefore, time compression will be used for this in-plant operation to expedite the examination.
Examinee directs an Auxiliary Operator to open DH-V-38A and DH-V-38B in accordance with Step 4 of Section 2.0 in Guide 3, LPI Failure.
Examinee announces applicability of OP-TM-EOP-010 Rule 2, HPI/LPI Throttling, removes the card from the holder, and obtains US concurrence to perform implement the rule during the pending operations.
~
~~~
~~~
OS-24 Section 4.1.6.B Rules and Guides The following sequence is used when Rule based action is required:
- 1. Announce the applicable rule.
- 2. Pull the applicable rule card.
- 3. The US provides concurrence.
- 4. Perform the Rule based actions.
- 5. Report completion of Rule based action and return card to holder.
112003 SlU Page 6 of 8
B.l.d Revision 1 When BWST level reaches 6.33 feet or RB Flood level >56 inches, Examinee closes DH-V-5A.
- I 3 Examinee depresses DH-V-SA CLOSE pushbutton on cc.
Indications that DH-V-5A is closed:
0 Green CLOSE pushbutton lamp is illuminated.
Red OPEN pushbutton lamp is de-eneraized.
14
- I 5
STEP Following report that DH-V-38A and DH-V-38B have been opened, examinee uses Rule 2 and Guide 3 to balance LPI flow between the two trains by throttling open DH-V-4B and throttling closed DH-V-4A within the flow limits of Rule 2, HPVLPI Throttling.
Examinee announces completion of Guide 3 and Rule 2, and returns Guide 3 and Rule 2 to the holders.
~
Examinee returns to Guide 21, Transfer to RB Sump Recirculation (Step 4), to continue suction transfer.
STANDARD Operate DH-V-4A and DH-V-4B in accordance with Step 5 of Section 2.0 in Guide 3, LPI Failure.
THROTTLE LPI flow to maximum controllable 13300 gpm in accordance with Section C of Rule 2, HPI/LPI Throttling.
THEN (Since BS pump is operating) THROTTLE LPI flow to maximum controllable 13000 gpm in accordance with Section C of Rule 2, HPI/LPI Throttlinn OS-24 Section 4.1.6.B Rules and Guides as described above.
Examinee returns to Guide 21, Transfer to RB Sump Recirculation (Step 4), to continue suction transfer.
NOTE: Step 3 (remedial action) of Guide 21, Transfer to RB Sump Recirculation, requires the operator to INITIATE Guide 3.
OS-24 Section 4.1.2.B INITIATE: Begin the action described (steps or procedure) and continue with the controlling procedure in parallel.
NOTE: This JPM may be terminated at this point if BWST level is not lowering towards 6.33 feet.
DH-V-6A is opened suction flow from the RB Sump significantly reduces BWST level draw-12003 SIU 3nce 16 Examiner: If not already done, terminate this JPM when Guide 21, step 4.1 (#I6 above) is complete.
END TASK Page 7 of 8
DATE P
04/12/03 05/1 2/03 B.l.d Revision 1 05/12/2003 JPM CHANGE HISTORY PAGE REFERENCE TITLE OP-TM-EOP-01 0 Abnormal Transients Rules, Guides and Graphs DESCRIPTION (Include AI ## if ADDroDriatel per NRC validation comments Page 8 of 8
TMI SRO License Exam 05/12/03 TMI-1 OPERATOR TRAINING JOB PERFORMANCE MEASURE B.l.e Page 1 of 7
B.1.e 11.2.05.XXX Revision 0 05/12/2003 TASK TITLE:
Perform Turbine Valve Testing on a CIV (Combined Intermediate Valve).
TASK NUMBER:
0450040201 TIF:
During power ops, perform main turbine valve testing.
2.90 K/A
REFERENCE:
System:
Steam Generator System (035)
WA:
2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.
Rating( ROISRO):
3.914.0 POSITION:
SRO[XIRO[XI N L O U EVALUATION METHOD:
PERFORM [XI SIMULATE 0 EVALUATION LOCATION:
SIMULATOR IN-PLANT CONTROL ROOM [7 OTHER TASK STANDARDS: TG-CIV-1 tested satisfactorily IAW procedure.
APPROXIMATE COMPLETION TIME: 15 minutes.
TIME-CRITICAL TASK COMPLETION TIME:
NA minutes REQUIRED TOOLS OR MATERIALS: 11 06-1 Rev 109 Appendix C section 2.0 with steps 2. I.I,
- 2. I
.2, 2. I
.5, 2.1.7, 2.1.8, 2.2.1.I, 2.2.1.2, and 2.2.1.5 N/Ad; steps 2.2.1.3 and 2.2.1.4 signed off.
REFERENCES:
1106-1 Rev 109, Appendix C, section 2.1 and 2.2.
ALTERNATE PATH JPM? NO SIMULATOR SETUP:
INITIALIZATION:
Initialize the Trainer to IC16 100% power, ICs in automatic, Xenon equilibrium, BOC.
Reduce power to 90%
Start Second EHC pump (both running)
When stable, place ICs SG/Rx Demand to HAND.
Make Snapshot after plant stabilizes.
EVENT TRIGGERS: N/A MALFUNCTIONS: None REMOTE FUNCTIONS: N/A OVERRIDES: N/A MONITOR: N/A Page 2 of 7
B.1.e 11.2.05.XXX Revision 0 05/12/2003 READ TO STUDENT When I tell you to begin, you are to PERFORM Turbine Valve Testing on Combined Intermediate Valve TG-CIV-1 ONLY IAW 1106-1 Appendix C. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
Reactor power is 90%, with ICs in Manual on SGlRx Demand only.
There are NO maintenance activities in progress.
Turbine valve testing preparations have been made IAW 1106-1 Appendix C.
INITIATING CUE:
The Unit Supervisor directs you to PERFORM Turbine Valve Testing on Combined Intermediate Valve TG-CIV-I ONLY IAW 1106-1 Appendix C, section 2.2. Do NOT test any other valves.
(Hand examinee copy of 1106-1 Rev 109 Appendix C section 2.0 with steps 2.1.1, 2.1.2, 2.1.5, 2.1.7, 2.1.8, 2.2.1.I, 2.2.1.2, and 2.2.1.5 NIAd; steps 2.2.1.3 and 2.2.1.4 signed off.)
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 3 of 7
JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to PERFORM Turbine Valve Testing on Combined Intermediate Valve TG-CIV-1 ONLY IAW 1106-1 Appendix C. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
Reactor power is 90%, with ICs in Manual on SG/Rx Demand only.
There are NO maintenance activities in progress.
Turbine valve testing preparations have been made IAW 1106-1 Appendix C.
INITIATING CUE:
The Unit Supervisor directs you to PERFORM Turbine Valve Testing on Combined Intermediate Valve TG-CIV-I ONLY IAW 1106-1 Appendix C, section 2.2. Do NOT test any other valves.
(Obtain copy of 1106-1 Rev 109AppendixC section 2.0with steps2.1.1, 2.1.2, 2.1.5, 2.1.7, 2.1.8, 2.2.1.1, 2.2.1.2, and2.2.1.5N/Ad;steps2.2.1.3and2.2.1.4signedoff.)
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 4 of 7
6.l.e 1 I
.2.05.XXX Revision 0 0511 2/2003 1
STEP STANDARD SIU Examinee reviews procedure precautions and steps.
Procedure reviewed by examinee CUE: As examinee reviews procedure, respond as needed for clarification, i.e. ENDPOINT on testing is step 2.2.2.12.
2
- 3
- 4
- 5
- 6 7
8
- 9
- 10
- I1 From Main Display screen, EXIT to Main Menu Page #I.
From Main Menu page #1 select screen
- 23 Valve Stroke Test Prereqs.
Select FULL STROKE test and execute command on screen #23.
Exit to Main Menu Page #l and select VALVE STROKE TESTING under #23.
Select the desired CIV (Full Stroke) to be tested on the VALVE STROKE TESTING screen. (A plotlgraph appears)
On the TRIGGERED PLOT display, verify FULL-STROKE is a logic (1).
Review steps 7 - 11 prior to performance.(PER PROCEDURE NOTE)
Initiate test by selecting START and execute command.
Observe plot for smooth stem stroking and FAST CLOSING of both valves (CIVis made up of IV Intercept Valve and ISV Intercept Stop Valve) 0 note sharp drop in position indication in last 10% of travel.
As soon as both valves are closed, select STOP to terminate test.
Examinee gets Main Menu Page # I on the screen.
Examinee gets #23 Valve Stroke Test Prereqs on Main Menu Page #l.
Examinee executes FULL STROKE test.
Examinee selects VALVE STROKE TESTING on Main Menu Page #1.
Examinee selects CIV-I on the Valve Stroke Testing screen.
Examinee verifies Full Stroke logic (1) on the TRIGGERED PLOT display.
Examinee reviews procedure steps 7 - I
- 1.
Examinee executes START command.
Examinee observes closing and FAST CLOSURE of CIV on plot.
0 NOTE: Examinee MUST wait until both valves (IV and ISV) stroke before performing next step.
0 NOTE: Examinee may request local observer report on CIV position/fast closure. IC0 roleplay as required.
Examinee selects STOP (after IV and ISV close).
Page 5 of 7
B. I
.e 11.2.05.XXX Revision 0 STEP Verify valves then return to previous open position.
Once valves reopen, select MORE OPTIONS e
THEN select SAVE IMAGE STANDARD SIU Examinee verifies CIV-1 open position.
NOTE: Examinee may request local observer report on CIV open position. IC0 roleplay as required.
Examinee selects MORE OPTIONS, then SAVE IMAGE.
NOTE: Examine should terminate this JPM at this time.
END TASK Page 6 of 7
JPM CHANGE HISTORY PAGE B.1.e 11.2.05.XXX Revision 0 05/12/2003 REVISION 0
DATE 0511 2/03 REFERENCE TITLE I1 06-1 Appendix C Section 2.0 DESCRl PTlON (Include AI # if Appropriate)
New JPM, replacement to be used per NRC (validation of SRO-21 Exam.)
Page 7 of 7
TMI SRO License Exam OW1 2/03 TMI-1 OPERATOR TRAINING JOB PERFORMANCE MEASURE B.l.f Page 1 of 7
B. 1.f Revision 1 031 2/2003 TASK TITLE:
RETURN REACTOR BUILDING EMERGENCY COOLING SYSTEM TO ENGINEERED SAFEGUARDS STANDBY.
TASK NUMBER:
OOOC240501 Start up the reactor building recirculation system.
TIF:
2.72 KIA
REFERENCE:
System:
Containment Cooling System (CCW) (022)
WA:
A4.01 (Page 3.5-7)
Rating(RO/SRO):
3.613.6 Ability to manually operate and/or monitor in the control room:
CCS fans.
POSITION:
S R O H R O H N L O O EVALUATION METHOD:
PERFORM SIMULATE [7 EVALUATION LOCATION:
SIMULATOR IN-PLANT CONTROL ROOM 0 OTHER 0 TASK STANDARDS: Reactor Building Emergency Cooling System is returned to ES standby condition in accordance with OP-TM-534-901, RB Emergency Cooling Operations.
APPROXIMATE COMPLETION TIME: 20 minutes TIME-CRITICAL TASK COMPLETION TIME:
NA minutes REQUIRED TOOLS OR MATERIALS: OP-TM-534-901, RB Emergency Cooling Operations, Rev. 0.
REFERENCES:
OP-TM-534-901, RB Emergency Cooling Operations, Rev. 0.
ALTERNATE PATH JPM? NO SIMULATOR SETUP:
IN IT1 ALE ATlON :
- 2. Utilize Section 4.1 of OP-TM-534-901, RB Emergency Cooling Operations, to manually start and operate the RB Emergency Cooling System, operating both RR-P-IA and RR-P-1 B pumps and all three AH-E-I-NB/C fans (slow speed).
EVENT TRIGGERS: N/A MALFUNCTIONS: N/A REMOTE FUNCTIONS:
OVERRIDES: NIA MONITOR: N/A CCR32 - NS-V-85 Page 2 of 7
B.l.f Revision 1 05/12/2003 When I tell you to begin, you are to perform procedural actions to RETURN REACTOR BUILDING EMERGENCY COOLING SYSTEM TO ES STANDBY. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
Reactor power is loo%, with ICs in full automatic.
A small Main Steam System leak inside the RB was isolated one hour ago.
RB Emergency Cooling was manually initiated to limit RB pressure and temperature.
0 0
Both RB Emergency Cooling pumps (RR-P-1NB) are operating.
All three AH-E-1NBIC fans running in slow speed.
RB ambient conditions have now been returned to normal.
INITIATING CUE:
The Shift Manager directs you to perform procedural actions to RETURN REACTOR BUILDING EMERGENCY COOLING SYSTEM TO ES STANDBY, in accordance with Section 5.0 of OP-TM-534-901, RB Emergency Cooling Operations.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO Page 3 of 7
JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to perform procedural actions to RETURN REACTOR BUILDING EMERGENCY COOLING SYSTEM TO ES STANDBY. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
Reactor power is 1 OO%, with ICs in full automatic.
A small Main Steam System leak inside the RB was isolated one hour ago.
RB Emergency Cooling was manually initiated to limit RB pressure and temperature.
0 0
Both RB Emergency Cooling pumps (RR-P-1NB) are operating.
All three AH-E-1NBIC fans running in slow speed.
RB ambient conditions have now been returned to normal.
INITIATING CUE:
The Shift Manager directs you to perform procedural actions to RETURN REACTOR BUILDING EMERGENCY COOLING SYSTEM TO ES STANDBY, in accordance with Section 5.0 of OP-TM-534-901, RB Emergency Cooling Operations.
TIME CRITICAL: NO Page 4 of 7
B. 1.f Revision 1 0511 212003
- Denotes Sequential Step STEP STANDARD SIU 1
2 3
4 5
6 7
8 9
10 L
- Denotes Critical Elements Cue: Provide Examinee with a copy of OP-TM-534-901, RB Emergency Cooling Operations.
Examinee verifies RB Pressure c 1.O psig.
NOTE: Procedure does not specify how to verify RB Pressure 4. 0 psig.
Examinee may check reactor building pressure indicators on Panel PCL,PLF, or CR, or even use Process Computer indications (points A0101-0103, A0455, A0457, A0473, A0928, A0929, A0930, and A0931), or SPDS/P-T Plot.
Examinee verifies RB temperatures e1 30°F.
NOTE: Procedure does not specify how to verify RB temperatures e1 30°F.
Examinee may check REACTOR BUILDING AMBIENT TEMPERATURE RECORDER TR-655 on Panel PLF, or Process Computer indications (points A0538. A0539. A0540. and A0573).
Examinee asks if E-Plan was activated.
CUE: E-Plan was NOT activated.
Examinee stops RR-P-lA, and then places the control switch in Normal After Stop position.
Examinee stops RR-P-16, and then places the control switch in Normal After Stop position.
Examinee closes RR-V-1 A.
Examinee closes RR-V-1 B.
Examinee closes RR-V4A.
1 RB pressure is c 1.O psig, as indicated on RX BLDG PRESSURE PI-1 186 on Panel PCL.
or 1
RB pressure is 4. 0 psig at Plant Computer (points A0101-0103, A0455, A0457, A0473, A0928, A0929, A0930, and A0931) or SPDS/P-T Plot.
I All RB temperatures indicate c 130°F on REACTOR BUILDING AMBIENT TEMPERATURE RECORDER TR-655 on Panel PLF.
or b
All RB temperatures indicate c 130°F on Process Computer points A0538, A0539, A0540, and A0573.
Examinee closes RR-V-4B.
Examinee closes RR-V-4C.
Examinee acknowledges E-Plan was not activated.
B RR-P-1A is shutdown, as indicated by Green light illuminated, Red light de-energized, and zero amps indicated on CC.
Control switch is in Normal After Stop, as indicated by Green Flag in control switch window on CC.
RR-P-1 B is shutdown, as indicated by Green light illuminated, Red light de-energized, and zero amps indicated on CR.
Control switch is in Normal After Stop, as indicated by Green Flag in control switch window on CR.
B RR-V-1A is closed, as indicated by Green light illuminated and Red light de-energized on CC.
RR-V-1 B is closed, as indicated by Green light illuminated and Red light de-energized on CR.
RR-V-4A is closed, as indicated by Green light illuminated and Red light de-energized on CR.
RR-VaB is closed, as indicated by Green light illuminated and Red light de-energized on CR.
RR-V-4C is closed, as indicated by Green light illuminated and Red light de-energized on CR.
Page 5 of 7
B. 1.f Revision 1 12003 SIU 11 12 13 14 15 16 17 18 19 STEP Examinee closes RR-V-4D.
Examinee closes RR-V-3A.
Examinee closes RR-V3B.
Examinee closes RR-V-3C.
Examinee Stops AH-E-IA, and then starts AH-E-1A in fast speed.
Examinee Stops AH-E-1 B, and then starts AH-E-1 B in fast speed.
Examinee Stops AH-E-IC, and then starts AH-E-IC in fast speed.
Hang an EST (Equipment Status Tag) on NS-V-84 (or 85).
Notify Chemistry manager to notify PADER.
STANDARD RR-V-4D is closed, as indicated by Green light illuminated and Red light de-energized on CR.
RR-V3A is closed, as indicated by Green light illuminated and Red light de-energized on CR.
RR-V-3B is closed, as indicated by Green light illuminated and Red light de-energized on CR.
RR-V-3C is closed, as indicated by Green light illuminated and Red light de-energized on CR.
0 AH-E-1A is stopped, as indicated by Green light illuminated and both Red lights de-energized on CR.
e AH-E-1A is operating in fast speed, as indicated by extreme right Red light illuminated, with center Red and left Green lights de-energized, on CR.
AH-E-1 B is stopped, as indicated by Green light illuminated and both Red lights de-energized on CR.
0 AH-E-1 B is operating in fast speed, as indicated by extreme right Red light illuminated, with center Red and left Green lights de-energized, on CR.
0 AH-E-1C is stopped, as indicated by Green light illuminated and both Red lights de-energized on CR.
e AH-E-IC is operating in fast speed, as indicated by extreme right Red light illuminated, with center Red and left Green lights de-energized, on CR.
CUE: When examinee indicates need to hang EST, inform examinee that EST is hung.
CUE: When examinee indicates need to call Chemistry manager, inform examinee that Chemistry manager has been notified.
NOTE: The Examinee should terminate this JPM at this time.
END TASK Page 6 of 7
REVISION 0
1 DATE 04/12/03 05/12/03 B.1.f Revision 1 0511 212003 JPM CHANGE HISTORY PAGE REFERENCE TITLE OP-TM-534-901 RB Emergency Cooling Operations OP-TM-534-901 Rev 0 DESCRIPTION (Include AI # if Appropriate) post NRC validation changes Page 7 of 7
TMI-I OPERATOR TRAINING JOB PERFORMANCE MEASURE B.1.g Page 1 of 6
B.l.g 11.2.05.XXX Revision 1 05/12/2003 TASK TITLE:
EMERGENCY DIESEL GENERATOR FAILS TO AUTO LOAD ON A BLACKOUT TASK NUMBER:
0640030101 Load an emergency diesel generator.
TIF: 2.63 KIA
REFERENCE:
System:
064 KIA:
A4.06 Rating:
3.9/3.9 POSITION:
S R O H R O B N L O O EVALUATION METHOD: PERFORM [XI SIMULATE 0 EVALUATION LOCATION: SIMULATOR [XI IN-PLANT CONTROL ROOM 0 OTHER TASK STANDARDS: EG-Y-1 B output breaker, G I 1-02, is closed and supplying power to the 1 E 4160V Bus with voltage maintained between 4.1 and 4.15kV.
APPROXIMATE COMPLETION TIME: 10 minutes TIME-CRITICAL TASK COMPLETION TIME: NA REQUIRED TOOLS OR MATERIALS: OP-TM-861-902, Diesel Generator EG-Y-1 B Emergency Operations, Rev. 2.
REFERENCES:
OP-TM-EOP-001, Reactor Trip, Step 3.7,page 5, Rev 2.
OP-TM-AOP-020, Loss of Station Power, Step 3.2, page I, Rev. 0.
OP-TM-861-902, Diesel Generator EG-Y-I B Emergency Operations, Rev. 2.
ALTERNATE PATH JPM? YES SIMULATOR SETUP: 1. Trip the reactor and stabilize plant conditions.
- 2. Set EGR12 @ 0%.
- 3. Activate malfunction EDOI.
INITIALIZATION: IC-16 EVENT TRIGGERS:
Event 1 :
Event =ZDIDGSTRT(2)
Command = DMF EGO1 B.
MALFUNCTIONS: EDOI - Station Blackout.
EGO1 B - EG-Y-1 B Fails to Start.
REMOTE FUNCTIONS: EGR12 @ 0%.
OVERRIDES: 03A6S56-ZDIGI 102(3) NAP OFF.
MONITOR: NA.
Page 2 of 6
B.1.g 11.2.05.XXX Revision 1 05/12/2003 READ TO STUDENT When I tell you to begin, you are to ENERGIZE THE 1E 4160V BUS. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The plant was stable at 100% power when the following sequence of events occurred:
0 The reactor tripped when a Loss of Off Site Power occurred.
0 EG-Y-1 B failed to automatically start and energize 1 E 41 60V Bus.
The Immediate Actions of OP-TM-EOP-001, Reactor Trip, have been completed, and OP-TM-AOP-020, Loss of Station Power, is being implemented.
INITIATING CUE:
The Unit Supervisor directs you to energize the 1 E 4160V Bus using EG-Y-1 B in accordance with OP-TM-861-902, section 4.1, Manually Start and Load EG-Y-1 B onto I E 41 60V Bus.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: NO.
Page 3 of 6
JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to ENERGIZE THE 1E 4160V BUS. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The plant was stable at 100% power when the following sequence of events occurred:
The reactor tripped when a Loss of Off Site Power occurred.
0 EG-Y-1 B failed to automatically start and energize 1 E 4160V Bus.
The Immediate Actions of OP-TM-EOP-001, Reactor Trip, have been completed, and OP-TM-AOP-020, Loss of Station Power, is being implemented.
INITIATING CUE:
The Unit Supervisor directs you to energize the 1 E 4160V Bus using EG-Y-1 B in accordance with OP-TM-861-902, section 4.1, Manually Start and Load EG-Y-1B onto 1E 4160V Bus.
Page 4 of 6
- Denotes Critical Elements
- 6 Examinee transfers EG-Y-1 B exciter control to Manual and adjusts manual voltage rheostat to obtain 4.1 to 4.15 kV.
5 Sequential Step STEP EG-Y-1 B exciter is in Manual AND voltage is adjusted to obtain between 4.1 and 4.15 kV, as read on Bus Volts meter on CR.
Examinee may verify EG-Y-1 B was in ES standby when the event began.
- 7 Examinee verifies 1 E 4160V bus is de-energized.
Examinee manually closes G I 1-02 using control switch on CR.
CR.
0 0
0 Gll-02 is manually closed using control switch on Indications that Gll-02 is closed:
Second half of overhead lighting illuminates.
Red breaker closed lamp is illuminated Green breaker open lamp is de-energized.
Examinee ensures both feeder breakers (1 SA-E2 and 1 SB-E2) are open.
Examinee depresses 1 B Diesel Generator Start pushbutton for approximately 8 seconds.
Examinee diagnoses generator voltage is NOT between 4.1 and 4.1 5 kV.
B.l.g 11.2.05.XXX Revision 1 0511 212003 STANDARD CUE: As Unit Supervisor, inform Examinee that EG-Y-IB was in ES Standby when the event began.
Examinee verifies 1E 4160V Bus is de-energized by checking that the 1 E 4160V Bus Volt indication is at OkV.
Examinee verifies 1 SA-E2 breaker is open by observing breaker status lights:
0 0
0 Green breaker open lamp is illuminated.
Red breaker closed lamp is de-energized.
Amber breaker disagreement lamp is energized.
Examinee verifies 1SB-E2 breaker is open by observing breaker status lights:
0 0
0 Green breaker open lamp is illuminated.
Red breaker closed lamp is de-energized.
Amber breaker disagreement lamp is de-energized.
Examinee depresses 1 B Diesel Generator Start PB for approximately 8 seconds. Diesel Generator starts, and accelerates to 900 rpm, as indicated at EG-Y-1 B tachometer on CR.
EG-Y-1A output voltage is less than 4.1 kV.
READY TO LOAD lamp is NOT LIT.
SIU END TASK Page 5 of 6
JPM CHANGE HISTORY PAGE B.1.g 11.2.05.XXX Revision 1 0511 2/2003 DATE 6/03/200 1
0511 2/2003 REFERENCE TITLE NA OP-TM 861-902 Diesel Generator EG-Y-1 B Emergency Operations DESCRI PTI ON (Include AI # if Appropriate)
Initial issue.
Revised JPM based upon new procedure.
Page 6 of 6
B.2.a Revision 1 05/12/2003 TMI-1 OPERATOR TRAINING JOB PERFORMANCE MEASURE B.2.a RESPOND TO A LOSS OF INSTRUMENT AIR (ESTABLISH LOCAL MANUAL CONTROL, AND OPEN MU-V-26)
Page 1 of 5
B.2.a Revision 1 05/12/2003 TASK TITLE:
RESPOND TO A LOSS OF INSTRUMENT AIR (ESTABLISH LOCAL MANUAL CONTROL, AND OPEN MU-V-26)
TASK NUMBER:
0000650504 TIF: 3.94 KIA
REFERENCE:
System:
004 WA:
A2.11 Rating:
3.6 14.2 POSITION: S R O H R O H N L O H EVALUATION METHOD: PERFORM SIMULATE EVALUATION LOCATION: SIMULATOR 0 IN-PLANT CONTROL ROOM 0 OTHER 0 TASK STANDARDS: Local control of MU-V-26 has been established, and valve has been manually opened.
APPROXIMATE COMPLETION TIME: 10 minutes.
TIME-CRITICAL TASK COMPLETION TIME:
NIA minutes.
REQUIRED TOOLS OR MATERIALS: OP 1104-2, Makeup and Purification System, page 113, Rev. 129.
REFERENCES:
EP 1202-36 Loss of Instrument Air, Rev.31.
OP 1 104-2 Makeup and Purification, page 11 3, Rev. 129.
302-660 Makeup And Purification System Flow Diagram.
ALTERNATE PATH JPM? NO READ TO STUDENT When I tell you to begin, you are to ESTABLISH LOCAL MANUAL CONTROL, AND OPEN MU-V-26 AS DIRECTED BY THE UNIT SUPERVISOR. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The Reactor is critical.
Reactor Coolant Pumps are operating.
Instrument Air pressure in the Auxiliary Building is reducing.
INITIATING CUE:
The Unit Supervisor directs you to:
- 1. Obtain a copy of OP 11 04-2, Makeup and Purification System to be used to establish local manual control of RCP Seal Return Isolation Valve MU-V-26.
- 2. Report to MU-V-26 area and establish communication with the Control Room.
You are being provided a copy of the current procedure to be used to manually operate MU-V-26.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: No Page 2 of 5
B.2.a Revision 1 0511 212003 JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to ESTABLISH LOCAL MANUAL CONTROL, AND OPEN MU-V-26 AS DIRECTED BY THE UNIT SUPERVISOR. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The Reactor is critical.
Reactor Coolant Pumps are operating.
Instrument Air pressure in the Auxiliary Building is reducing.
INITIATING CUE:
The Unit Supervisor directs you to:
- 1. Obtain a copy of OP 1104-2, Makeup and Purification System to be used to establish local manual control of RCP Seal Return Isolation Valve MU-V-26.
- 2. Report to MU-V-26 area and establish communication with the Control Room.
You are being provided a copy of the current procedure to be used to manually operate MU-V-26.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: No Page 3 of 5
B.2.a Revision 1 05/12/2003 STEP STANDARD SIU
- 4 1
Communications is established with the Control Room.
NOTE: Examinee will need to:
0 Be signed on an RWP.
0 Obtain a ladder (ladder station located behind 1 M 480 V bus, 305 AB near primary A 0 central)
Obtain HP supportlpermission to reach above 7 OR obtain appropriate anti-C gloves.
CUE: Inform the Examinee that communications have been established.
Establish communications with the Control Room at MU-V-26 area.
Remove the pin from the clevis.
Run handwheel down to align rod clevis holes with hole in the valve stem.
I I Examinee removes the pin from the clevis.
Examinee turns manual handwheel clockwise to lower the rod clevis until the clevis holes are aligned with the hole in the valve stem.
CUE: Inform the Examinee that helshe now has possession of the pin.
Insert pin through rod clevis and valve stem.
Examinee slides pin through the clevis and valve stem holes to engage the manual operator to the valve stem.
CUE: Inform the Examinee that the holes are aligned.
- 5 Use hand wheel to open MU-V-26 as directed by the Unit Supervisor.
Examinee turns manual handwheel counter-clockwise to manually open MU-V-26,(stem rises).
CUE: Inform the Examinee that the Pin is inserted through the holes, and the manual operator is engaged.
NOTE: Examiner may ask examinee to identify how to determine MU-V-26 initial position. (ANSWER: Stem indication risen and/or control room indication)
CUE: After local manual control has been established and MU-V-26 has been opened, inform the Examinee that the task is complete.
END TASK Page 4 of 5
B.2.a Revision 1 05/1212003 JPM CHANGE HISTORY PAGE REFERENCE DESCRIPTION (Include AI # if Appropriate)
New JPM.
Per NRC post validation comments SRO-21 Page 5 of 5
B.2.b 1 1.2.05.1 10 Revision 6 05l12l2003 TMI-I OPERATOR TRAINING JOB PERFORMANCE MEASURE B.2. b TRANSFER PRESSURIZER GROUP 8 HEATERS FROM THE BOP POWER SUPPLY TO THE I P 480 VOLT ES SWITCHGEAR.
Page 1 of 9
B.2.b 11.2.05.1 10 Revision 6 0511 Z2003 TASK TITLE:
TRANSFER PRESSURIZER GROUP 8 HEATERS FROM THE BOP POWER SUPPLY TO THE 1P 480 VOLT ES SWITCHGEAR.
TASK NUMBER:
010C010201 TIF: 3.59 WA
REFERENCE:
System:
01 0 KIA:
A2.01 Rating: 3.3/3.6 POSITION:
SRO rn NLO rn EVALUATION METHOD: PERFORM 0 SIMULATE EVALUATION LOCATION: SIMULATOR 0 IN-PLANT rn CONTROL ROOM 0 OTHER 0 TASK STANDARDS:
Pressurizer Heater Group 8 is energized from the I P 480V ES Bus (simulated).
APPROXIMATE COMPLETION TIME: 20 minutes.
TIME-CRITICAL TASK COMPLETION TIME: NIA minutes.
REQUIRED TOOLS OR MATERIALS:
OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters, Rev. 0.
Pressurizer Heater Key Tags (4): K1, L1, L2, and L3.
Photographs (3): Disconnect Assembly Cabinet, Disconnect Device, Pzr Heater Breaker
REFERENCES:
OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters, Rev. 0.
ALTERNATE PATH JPM? NO READ TO STUDENT When I tell you to begin, you are to TRANSFER PRESSURIZER GROUP 8 HEATERS FROM THE BOP POWER SUPPLY TO THE I P 480V ES SWITCHGEAR in accordance with OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The Reactor is shutdown due to loss of off-site power.
Off-Site power is not expected to return in the near future.
The decision has been made to transfer Pressurizer Heater Group 8 power to the 1 P 480V ES Bus.
INITIATING CUE:
The Unit Supervisor directs you to transfer Group 8 Pressurizer Heaters from the BOP power supply to the 1 P 480V ES Bus, using OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: No Page 2 of 9
B.2.b 11.2.05.1 10 Revision 6 05/12/2003 JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to TRANSFER PRESSURIZER GROUP 8 HEATERS FROM THE BOP POWER SUPPLY TO THE 1P 480V ES SWITCHGEAR in accordance with OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The Reactor is shutdown due to a loss of off-site power.
Off-Site power is not expected to return in the near future.
The decision has been made to transfer Pressurizer Heater Group 8 power to the 1 P 480V ES Bus.
INITIATING CUE:
The Unit Supervisor directs you to transfer Group 8 Pressurizer Heaters from the BOP power supply to the 1 P 480V ES Bus, using OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: No Page 3 of 9
B.2.b 11.2.05.1 10 Revision 6 0511 212003
- Denotes Critical Elements
- Denotes Sequential Step STEP
\\
STANDARD SIU CUE: Provide Examinee with a copy of OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters, CUE: Inform examinee that all prerequisites are satisfied.
pages 1,2, and 3, Rev. 0.
1 2
- 3
- 4
- 5 Examinee reports to the 1 B Pressurizer Heater MCC on the 322' elevation of the turbine building, west of the 12th Stage Extraction Steam Header.
~~~
~~
Examinee may describe requirements to wear protective gear and request a backup safety person.
Examinee de-energizes Pressurizer Heater Group 8 by opening breaker Unit 2B on 1 B Pressurizer Heater MCC.
Examinee locks open Unit 28 breaker by rotating Key K1 (clockwise).
Examinee pulls Keys K1 and L1 straight out to remove them from the breaker door.
Keys in hand: K1 and L1.
Examinee proceeds to Pressurizer Heater Group 8 Isolation device SI, located west of the 1 B Pressurizer Heater MCC.
Keys in hand: K1 and Ll.
Examinee reports to 1 B Pressurizer Heater MCC.
Note: Examinee may inform establish communications with control room.
If Examinee describes requirements to wear protective gear and request a backup safety person, provide the following response:
CUE: For this task you would normally be required to don protective equipment and use a safety person. Compliance with these requirements is vitally important to ensure safe, successful completion of the assignment. For purposes of this examination, since we are not opening or operating any equipment, we will simulate the use of the protective equipment, and I will act as your backup safety person.
Circuit breaker Unit 2B on 1 B Pressurizer Heater MCC is open.
NOTE: Handle on front of the door must be pulled downward, rotating in the clockwise direction, to open the breaker.
CUE: Inform Examinee the breaker is open.
Keys K1 and L1 are removed from their respective locks on the breaker door.
CUE:
Dispense key tag KI.
Dispense key tag Ll.
Keys in hand: K1 and L1.
Examinee proceeds to Pressurizer Heater Group 8 Isolation Device SI.
Page 4 of 9
B.2.b 11.2.05.110
- 6
- 7
- 8 "9
- IO STEP Keys in hand: K1 and L1.
Examinee unlocks the enclosure door for Pressurizer Heater Group 8 Isolation Device SI by inserting and then rotating (clockwise) Key K1.
0 Key K1 is now captured in its lock.
Examinee opens the enclosure door for Isolation Device S1.
Keys in hand: L1.
Keys in hand: L1 Examinee unlocks SI disconnect assembly by inserting and rotating Key L1 (clockwise).
Key L1 is now captured in the lock.
Key L3 can be removed.
Examinee removes Key L3 from SI enclosure by pulling Key L3 straight out.
0 0
Keys in hand: L3.
Keys in hand: L3.
Examinee uses the socket and ratchet wrench inside the enclosure to remove the four bolts that hold the disconnect assembly in place Keys in hand: L3.
Keys in hand: L3.
Examinee removes S I disconnect assembly.
Keys in hand: L3.
Keys in hand: L3.
Examinee closes SI enclosure door Examinee locks S I enclosure door by rotating Key K1 (counterclockwise).
0 Key K1 is no longer captured in its lock.
Examinee pulls Key K1 straight out to remove Key K1 from S I enclosure door.
Keys in hand: K l and L3.
STANDARD S I enclosure door is open.
CUE: Inform Examinee that the lock on the door is unlocked and open.
0 Retrieve K I key tag.
0 Dispense Picture #I.
The disconnect assembly is unlocked and Key L3 is removed.
CUES:
0 Retrieve key tag Ll.
0 Dispense key tag L3.
Four bolts removed.
CUE: Inform Examinee all four bolts have been removed.
Examinee pulls the handle straight out to remove the disconnect assembly S I from the enclosure.
CUE: Inform Examinee disconnect assembly is removed from the enclosure.
0 Dispense Picture #2, Disconnect Assembly.
S I enclosure door is closed and locked. Key K1 is removed.
CUE:
0 Dispense key tag KI.
0 Retrieve Picture #I.
evision t
/ I 21200:
SIU Page 5 of 9
B.2.b Revision I1 21200:
SIU -
11
- I2
- I 3
- I4
- I 5 STEP Keys in hand: K1 and L3.
Examinee proceeds to disconnect assembly SI Alternate enclosure located in the (Control Tower) 1 P ES 480V switchgear room on the north wall.
Keys in hand: K1 and L3.
Keys in hand: K1 and L3.
Examinee unlocks S I Alternate enclosure door by inserting and then rotating (counterclockwise) Key K1.
0 Key K1 is now captured in this lock.
Examinee opens the S I Alternate enclosure door.
Keys in hand: L3.
Keys in hand: L3.
Examinee inserts S I disconnect assembly into SI Alternate Enclosure.
Keys in hand: L3.
Keys in hand: L3.
Examinee inserts and tightens the four bolts to fasten the disconnect assembly to the alternate enclosure.
Keys in hand: L3.
Keys in hand: L3.
Examinee locks the S I disconnect assembly into the S I Alternate Enclosure by inserting and then rotating Key L3 (counterclockwise).
Key L3 is now captured in the lock.
Key L2 can now be removed.
0 Examinee removes Key L2.
Keys in hand: L2.
STANDARD Examinee is at S I Alternate enclosure with the disconnect assembly and Keys K1 and L3.
Alternate enclosure door for SI is open.
CUE: Inform Examinee the enclosure door is unlocked and open.
Retrieve K I key tag.
0 Dispense Picture #I.
0 Remind Examinee that helshe is holding the wrench, the disconnect assembly, and the bolts.
Holding the handle, Examinee pushes disconnect assembly SI straight into the receptacle to make the connections inside the alternate enclosure.
CUE: Inform Examinee that the disconnect assembly is connected inside the alternate enclosure.
Disconnect assembly is fastened inside of the alternate enclosure.
CUE: Inform the examinee that the bolts are 0
Retrieve Picture #2, Disconnect tightly bolted in place.
Assembly.
The disconnect assembly is locked and Key L2 is removed.
CUES: The disconnect assembly is locked into place.
0 Retrieve key tag L3.
0 Dispense key tag L2.
Page 6 of 9
B.2.b 11.2.05.110 Revision 6 STEP Keys in hand: L2.
Examinee closes S1 Alternate enclosure door.
Examinee locks S1 Alternate enclosure door closed by inserting and rotating Key K1 (counterclockwise).
Examinee removes Key K1 from S1 Alternate enclosure door by pulling Key K l straight out.
Keys in hand: K1 and L2.
Keys in hand: K1 and L2.
Examinee reports to Unit 3A on 1 P 480V ES Bus.
Examinee may describe requirements for use of protective equipment and safety backup person, in preparation for racking in Unit 3A.
Examinee opens Unit 3A enclosure door.
Keys in hand: K1 and L2.
Keys in hand: K1 and L2.
Examinee unlocks Unit 3A mechanical interlock (prevents breaker from being racked in to the connected position) by inserting and then rotating Keys K1 and L2 in their respective locks in breaker Unit 3A at 1 P 480V ES Bus.
Keys in hand: None.
Examinee communicates with Control Room to verify Pressurizer level is greater than 80 inches.
Examinee communicates with Control Room to verify Pl-02 feeder current is 4 5 0 amperes.
Examinee communicates with Control Room to verify either diesel generator breaker G1-02 breaker is open, or EG-Y-1A load is e2850 kW.
STANDARD S1 enclosure door is closed and locked, and Key K1 is removed.
CUE: S I Alternate enclosure door is closed and locked.
0 Dispense key tag KI.
0 Retrieve Picture #I.
Examinee at Unit 3A on 1 P 480V ES Bus with protective equipment, breaker enclosure door simulated OPEN.
NOTE: Current requirements for safety gear are; hardhat, flash goggles, Flamex apron and rubber gloves. Examinee may simulate use of safety gear during this examination.
CUE: Dispense Picture #3.
Key L2 rotated and interlock unlocked.
CUE:
0 Retrieve key tag KI.
0 Retrieve key tag L2.
Pressurizer level is greater than 80 inches.
CUE: Pressurizer level is 110 inches, and steady.
Pi-02 feeder current is 4 5 0 amperes.
CUE: P1-02 feeder current is I10 amperes, and steady.
EG-Y-1A load is e2850 kW.
CUE: G1-02 breaker is closed. EG-Y-1A load is 1200 kW, and steady.
I1 21200 s / u Page 7 of 9
B.2.b 11.2.05.1 10 STEP STANDARD SIU JPM may be terminated at this time.
END TASK
- 22 Page 8 of 9 Examinee reports to the local control panel for Group 8 Pressurizer Heaters (north wall of the 1 P 480V ES Bus room).
Examinee energizes Group 8 Pressurizer heaters from 1P 480V ES Bus by rotating the local control switch clockwise to the close position.
Examinee energizes Group 8 Pressurizer heaters from 1 P 480V ES Bus by rotating the local control switch clockwise to the close position.
0 Local control panel switch rotated to the close position.
0 Red breaker status light is illuminated.
0 Green breaker light is de-energized.
B.2.b 11.2.05.110 Revision 6 05/12/2003 REV1 SI ON 4
5 6
JPM CHANGE HISTORY PAGE DATE 11/16/2000 04/12/2003 0511 2/2003 REFERENCE TITLE OP-TM-220-901 DESCRIPTION (Include AI # if Appropriate)
Modified in response to ETTS Item #35801.
Revised JPM to match new procedure OP-TM-220-902, Emergency Power Supply for Pressurizer Heaters.
revised per NRC validation comments SRO-21 Page 9 of 9
B.2.c 11.2.05.033 Revision 8 0511 2/03 TMI-1 OPERATOR TRAINING JOB PERFORMANCE MEASURE I I.2.05.033 B.2.c RESET EF-P-I OVERSPEED TRIP LEVER Page 1 of 5
B.2.c 11.2.05.033 Revision 8 05f 12/03 TASK TITLE:
RESET EF-P-I OVERSPEED TRIP LEVER TASK NUMBER:
0610120104 TIF: 3.29 WA
REFERENCE:
System:
061 AuxiliarylEmergency Feedwater (AFW) System WA:
A2.04 Rating:
3.413.8 POSITION: S R O H R O H N L O B EVALUATION METHOD: PERFORM SIMULATE EVALUATION LOCATION: SIMULATOR 0 IN-PLANT [XI CONTROL ROOM OTHER 0 TASK STANDARDS:
EF-P-1 has been reset.
APPROXIMATE COMPLETION TIME: 10 minutes.
TIME-CRITICAL TASK COMPLETION TIME: NIA minutes.
REQUIRED TOOLS OR MATERIALS:
e OP-TM-EOP-010, Guide 16.1, EFW Failure - Failure of EF-P-1 to Start, Rev. I.
Gloves (Optional - since no manipulations will actually be performed).
REFERENCES:
OP-TM-EOP-010, Guide 16.1, EFW Failure - Failure of EF-P-1 to Start, Rev. I.
ALTERNATE PATH JPM? NO READ TO STUDENT When I tell you to begin, you are to RESET EF-P-1 OVERSPEED TRIP, USING OP-TM-EOP-010 Guide 16.1.
Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions.
Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The Reactor tripped due to a loss of Main Feedwater.
When EFW auto started, EF-P-1 tripped on overspeed.
OP-TM-EOP-010 Guide 16.1 is in progress.
Steam pressure to EF-P-1 is 150 psig, as read on MS-PI-204.
MS-V-13A and MS-V-136 are both closed at the present time.
INITIATING CUE:
The Unit Supervisor has directed you to:
Obtain copy of the in progress OP-TM-EOP-010, Guide 16.1.
Report to EF-P-1, establish communications with the control room, and then await further instructions.
ARE THERE ANY QUESTIONS?
TIME CRITICAL: No Page 2 of 5
B.2.c 11.2.05.033 Revision 8 0511 2/03 JPM INSTRUCTION SHEET DIRECTIONS TO STUDENT:
When I tell you to begin, you are to RESET EF-P-I OVERSPEED TRIP. Before you start, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps and make notifications as if you were actually performing the task.
INITIAL CONDITIONS:
The Reactor tripped due to a loss of Main Feedwater When EFW auto started, EF-P-1 tripped on overspeed.
OP-TM-EOP-010 Guide 16. I is in progress.
Steam pressure to EF-P-1 is 150 psig, as read on MS-PI-204.
MS-V-13A and MS-V-13B are both closed at the present time.
I INITIATING CUE:
The Unit Supervisor has directed you to:
0 0
Obtain copy of the in progress OP-TM-EOP-010, Guide 16.1.
Report to EF-P-1, establish communications with the control room, and then await further instructions.
TIME-CRITICAL: NO Page 3 of 5
B.2.c 11.2.05.033 Revision 8 0511 2/03 STEP STANDARD SIU 1
2 Locate EF-P-1 in the basement of the Intermediate Building.
Establish communications with the control room.
established.
EF-P-1 is located.
Communication with the control room is CUE: Roleplay as CRO as needed.
- 3 With steam pressure greater than 50 psig, open trap drain isolation valve MS-V-52 to reduce steam pressure to less than 50 psig.
The Examinee locates and opens MS-V-52 by rotating the handwheel in the counterclockwise direction.
The Examinee notifies the Control Room that MS-V-52 is open.
The Examinee closes MS-V-52 by rotating the handwheel in the clockwise direction.
The Examinee notifies the Control Room that MS-V-52 is closed.
CUE: The CRO, utilizing proper communications acknowledges MS-V-52 is closed.
Valve arm on EF-P-1 stop valve has been raised from the vertical position to the horizontal position.
The trip finger locking device (spring) is moved so that the trip finger can be rotated.
NOTE: MAP annunciator J-1-2 EFW TURB PMP OS TRIP, is expected to CLEAR in the Control Room.
CUE: If the reset operation is completed correctly, inform the Examinee that the valve arm and the trip finger are now oriented such that the valve arm can be latched to the trip finger.
The valve arm is latched to the trip finger.
CUE: Inform the Examinee that the valve arm is held in the horizontal position by the trip finger if helshe correctly describes steps 5&6.
The Control Room is notified.
CUE: The CRO, as part of three-way communications, acknowledges EF-P-1 is reset.
- 4
- 5 II NOTE: The Examinee should terminate this JPM at this time.
When MS-PI-204 (CR or locally) indicates c 50 psig, close MS-V-52.
When MS-PI-204 c 50 psig, reset the governor trip lever.
END TASK
- 6 Page 4 of 5 Examinee latches the valve arm to the trip finger and allows the trip finger locking device to rest on the trip finger.
7 Contact the Control Room to report EF-P-1 is reset.
JPM CHANGE HISTORY PAGE B.2.c 11.2.05.033 Revision 8 0511 2/03 REVISION 7
8 REFERENCE 05/12/03 DESCRIPTION (Include AI # if Appropriate) per NRC validation comments SRO-21 Page 5 of 5