July 2, 2003 MEMORANDUM TO:

Chairman Diaz FROM:

William D. Travers /RA/

Executive Director of Operations

SUBJECT:

RESPONSE TO OFFICE OF THE INSPECTOR GENERAL EVENT INQUIRY, CASE NO.01-01S, NRC ENFORCEMENT OF REGULATORY REQUIREMENTS AND COMMITMENTS AT INDIAN POINT, UNIT 2" NRC staff agrees with the factual content and findings of the subject Inspector General (IG) report, dated April 25, 2003. The report covers the period of transition to the revised Reactor Oversight Process (ROP) and recognizes that the staff provided continued heightened oversight of Indian Point 2 assuring safety of operations. The IG report acknowledges staff efforts to address the Indian Point Unit 2 reactor protection system concerns expressed by an engineering consultant.

The report contained no specific recommendations or areas for improvement. As such, we plan no actions beyond the ongoing program of heightened oversight developed through the ROP process and documented in the annual assessment letter dated March 4, 2003.

cc:

Commissioner McGaffigan Commissioner Merrifield SECY OCA OGC OPA CFO

MEMORANDUM TO:

Chairman Diaz July 3, 2003 FROM:

William D. Travers /RA/

Executive Director of Operations

SUBJECT:

RESPONSE TO OFFICE OF THE INSPECTOR GENERAL EVENT INQUIRY, CASE NO.01-01S, NRC ENFORCEMENT OF REGULATORY REQUIREMENTS AND COMMITMENTS AT INDIAN POINT, UNIT 2" NRC staff agrees with the factual content and findings of the subject Inspector General (IG) report, dated April 25, 2003. The report covers the period of transition to the revised Reactor Oversight Process (ROP) and recognizes that the staff provided continued heightened oversight of Indian Point 2 assuring safety of operations. The IG report acknowledges staff efforts to address the Indian Point Unit 2 reactor protection system concerns expressed by an engineering consultant.

The report contained no specific recommendations or areas for improvement. As such, we plan no actions beyond the ongoing program of heightened oversight developed through the ROP process and documented in the annual assessment letter dated March 4, 2003.

cc:

Commissioner McGaffigan Commissioner Merrifield SECY OCA OGC OPA CFO DISTRIBUTION:

W. Travers, EDO M. Malloy, OEDO C. Paperiello, DEDMRS EDO R/F (G20030219)

W. Kane, DEDR A. Blough, RI P. Norry, DEDM B. Holian, RI W. Dean, OEDO S. Richards, NRR S. Burns, OGC P. Eselgroth, RI K. Cyr, OGC T. Walker, RI S. Collins, NRR P. Milano, NRR OIG File DOCUMENT NAME: G:\\BRANCH2\\IP2 Comm Team\\Green Tickets\\IG Report No. 01-01 G draft response revision5.wpd. After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy



















 

















 

 



 



 !"#

 !$#

 !$#

 !$#

 !$#

%!#







 

&



%'#

 

 (