FENOC Perry Nuclear Power Plant FkstEneW Nut-Sear Operaft Cwpmy
~~~~~~~~~~~~~
Box 97 FfrsEnergyNudear OperatIl Comflpanfly Perry, Ohio 44081 June 12, 2003 PY-CELNRR-2716L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the May 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, for VroK.
igaki Manager - Regulatory Affairs Attachment cc: NRC Region I Administrator NRC Project Manager NRC Resident Inspector
~~~~
OPERATING DATA REPORT UNIT:
Perry DATE:
6/9/03
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: May 2003
- 4.
Utility Contact T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235
- 8.
Hours Reactor was Critical
- 9.
Hours Generator On-Line
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
This Month 82.3 23.1 0.0 0.0
- Yr-tomDate 2.340.6 2.279.1 0.0 0 CAFP7nR n Cumulative 107.244.1 104.549.4 0.0 119.140.919.0 Page 1 L.<v<.f vU.v
UNIT SHUTDOWNS REPORT MONTH - May 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 6/9/03 CONTACT: T. Phelos TELEPHONE: (440) 280-7660
SUMMARY
- At the end of May 2003, the Perry Plant was In startup.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
Ucense Examination F - Administrative G - Operational Enor (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continuaton 5 - Other No.
Date Type Duraton Reasbn Method Cause and Corrective Action to Prevent Recurrence I
Hours 2
3 03-01 415/03 S
720.9 C
4 The Perry Plant entered refuel outage #9 at 0001 on 4/5/03 and remained shutdown unti 5/31/03 at 0053 when the unit was synchronized to the grid to commence Cycle 10.