ML031690346
| ML031690346 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/09/2003 |
| From: | Cayia A Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC 2003-0054 | |
| Download: ML031690346 (5) | |
Text
N i
Committed to Nuclear Excele Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0054 GL 97-02 June 09, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of May 2003.
Sincerely, Site resident KML Attachment cc:
J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 e- Ie3q LI--,
1, UNII SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-266 Point Beach, Unit 1 6/06/2003 Kim M. Locke 755-6420 REPORTING PERIOD:
Mav 2003 (Month/Year)
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUITING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason A. Equipment Failure (Explain)
B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G. Operational Error (Explain) H.Other (Explain)
(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram
- 4. Continuation
- 5. Other (Explain)
SUMMARY
Unit I average daily power for the month of May was 513.6 MWe.
No Significant Operating Event occurred on Unit in May:
There were no LER's on Unit I in the month of May.
OPERATING DATA REPORT DOCKET NO.
50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 06/03/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET)
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWE-NET)
YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
- 5.
UNIT RESERVED SHUTDOWN HOURS
- 6. NET ELECTRICAL ENERGY (MWH) 744.0 744.0 0.0 382,114.5 3,623.0 3,623.0 0.0 1,849,246.0 235,222.4 231,681.5 846.9 107,400,555.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 522.0 516.0 MONTH I,
I
UNIT SHUTDOWNS DOCKET NO.
UN1T NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-301 Point Beach, Unit 2 6/06/2003 Kim M. Locke 755-6420 REPORTING PERIOD:
May 2003 (Month/Year)
(1) Reason A. Equipment Failure (Explain)
B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)
(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram
- 4. Continuation
- 5. Other (Explain)
SUMMARY
Unit 2 average daily power for the month of May was 485.1 MWe.
The following Significant Operating Event occurred on Unit 2 in May:
Steam Leak from 2P-28A, Steam Generator Feed Pump casing.
The following LER's were sent to the NRC in the month of May:
2003-002 TS Required shutdown due to TSAC 3.1.6.B.2 not met 2003-001 Containment Accident Fan Backfraft Damper Fan Failure 2003-003 Failure to place instrument channel in trip as specified by LCO 3.3.1 NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A N/A
OPERATING DATA REPORT DOCKET NO.
50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNll 2 DATE 06/03/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET)
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)
YEAR TO DATE CUMULATIVE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
- 5. UNIT RESERVED SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (MWH) 744.0 744.0 0.0 360,884.5 3,577.0 3,535.4 0.0 1,785,159.0 229,330.1 226,301.1 302.2 106,572,962.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15,1997 522.0 518.0 MONTH
.