Category:Technical Specifications
MONTHYEARML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-22-0091, Correction of Technical Specification Typographical Omission2022-02-24024 February 2022 Correction of Technical Specification Typographical Omission ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17333A0792017-12-0606 December 2017 Reissue of Corrected Technical Specification Page 3.6.6-3 NL-17-1974, Supplemental Submittal of Corrected Technical Specification Pages for the AST, TSTF-448 and TSTF-312 Amendment Package2017-11-21021 November 2017 Supplemental Submittal of Corrected Technical Specification Pages for the AST, TSTF-448 and TSTF-312 Amendment Package NL-17-1067, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request2017-06-0808 June 2017 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement ML16272A1892016-10-0303 October 2016 Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2) ML15289A2272016-06-10010 June 2016 Issuance of Amendments Related to TSTF-432-A, Revision 1 ML16083A2652016-05-17017 May 2016 Issuance of Amendments to Revise Technical Specification 3.4.14 NL-16-0034, License Amendment Request and 10 CFR 50.12 Exemption Request, Optimized Zirlo Fuel Rod Cladding2016-03-16016 March 2016 License Amendment Request and 10 CFR 50.12 Exemption Request, Optimized Zirlo Fuel Rod Cladding NL-15-1956, Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions2016-03-14014 March 2016 Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions NL-15-2062, Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 22015-11-25025 November 2015 Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 2 NL-15-0722, Technical Specification 3.3.5 Loss of Power Diesel Generator Start Instrumentation License Amendment Request2015-11-20020 November 2015 Technical Specification 3.3.5 Loss of Power Diesel Generator Start Instrumentation License Amendment Request ML15180A3342015-08-0303 August 2015 Issuance of Amendments ML15083A0982015-06-0202 June 2015 Issuance of Amendments (TAC Nos. MF4828, MF4829, MF4889, and MF4890) ML14308A0482015-03-10010 March 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) NL-15-0188, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.52015-02-13013 February 2015 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5 NL-14-0115, Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.52014-09-17017 September 2014 Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5 ML14155A3022014-08-15015 August 2014 Issuance of Amendment Regarding Minimum Condensate Storage Tank Level Technical Specifications ML14069A3442014-05-13013 May 2014 Issuance of Amendments to Incorporate the Schedule for Degraded Grid Voltage Modification NL-12-0867, License Amendment Request to Technical Specification 3.7.6, Condensate Storage Tank2012-08-20020 August 2012 License Amendment Request to Technical Specification 3.7.6, Condensate Storage Tank NL-12-0868, Request to Revise Technical Specifications Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report2012-08-15015 August 2012 Request to Revise Technical Specifications Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report NL-12-1226, License Amendment Request to Allow Nexus Nuclear Data Methodology in the Preparation of the Core Operating Limits Report2012-08-14014 August 2012 License Amendment Request to Allow Nexus Nuclear Data Methodology in the Preparation of the Core Operating Limits Report NL-12-1552, Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating2012-07-23023 July 2012 Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating NL-12-0403, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-28028 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-11-0299, Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.42012-01-18018 January 2012 Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.4 NL-10-0272, License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated..2010-10-29029 October 2010 License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. NL-09-1676, Request to Revise Technical Specification 3.7.8, Service Water System (Sws).2009-10-21021 October 2009 Request to Revise Technical Specification 3.7.8, Service Water System (Sws). NL-09-1622, Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (Sws).2009-10-0808 October 2009 Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (Sws). NL-09-1861, License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report2009-09-15015 September 2009 License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report ML0917706642009-09-0404 September 2009 Southern Nuclear Operating Company Plants, License Amendments, Regarding Elimination of Working Hour Restrictions from Technical Specifications ML0827300082008-09-29029 September 2008 Tech Spec Pages for Amendment Nos. 178 and 171 Revised TS for Limiting Condition for Operation 3.9.3, Containment Penetrations. NL-08-0832, Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications.2008-06-12012 June 2008 Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications. ML0818202472008-05-23023 May 2008 Updated Final Safety Analysis Report, Revision 21, Technical Specifications Bases NL-06-2801, Technical Specification Amendment Request, Containment Leakage Rate Testing Program2007-11-0505 November 2007 Technical Specification Amendment Request, Containment Leakage Rate Testing Program NL-07-1079, Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization2007-07-17017 July 2007 Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization ML0719804822007-07-16016 July 2007 Tech Spec Pages for Amendments 175 and 168 Regarding Technical Specification Changes to Reflect Change in Organizational Structure 2023-08-24
[Table view] |
Text
Pressurizer PORVs 3.4.11 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. More than one block valve F.1 Place associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. PORVs in manual control.
AND F.2 Restore one block valve 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to OPERABLE status.
AND F.3 Restore remaining 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> block valve to OPERABLE status.
G. Required Action and G.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition F not AND met.
G.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1 NOTES
- 1. Not required to be met with block valve closed in accordance with the Required Action of Condition B or E.
- 2. Not required to be performed prior to entry into MODE 3.
- 3. Not required to be performed for Unit 2 for the remainder of operating cycle 16 for block valve Q2B31 MOV8000B.
Perform a complete cycle of each block valve. 92 days Farley Units 1 and 2 3.4.11-3 Amendment No. 146 (Unit 1)
Amendment No. 151 (Unit 2)
Pressurizer PORVs 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.2 Not required to be performed prior to entry into MODE 3.
Perform a complete cycle of each PORV during 18 months MODE 3 or 4.
SR 3.4.11.3 Perform a complete cycle of each PORV using the 18 months backup PORV control system.
SR 3.4.11.4 -- NOTE Required to be performed only for Unit 2 for the remainder of operating cycle 16.
Check power available to the Unit Two PORV block 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> valve Q2B31MOV8000B.
Farley Units 1 and 2 3.4.11-4 Amendment No. 146 (Unit 1)
Amendment No. 151 (Unit 2)
Pressurizer PORVs B 3.4.11 BASES ACTIONS G.1 and G.2 (continued)
If the Required Actions of Condition F are not met, then the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. In MODES 4, 5, and 6, the PORVs are not required OPERABLE.
SURVEILLANCE SR 3.4.11.1 REQUIREMENTS Block valve cycling verifies that the valve(s) can be closed if needed.
The basis for the Frequency of 92 days is the ASME Code, Section Xl (Ref. 3). If the block valve is closed to isolate a PORV that is capable of being manually cycled, the OPERABILITY of the block valve is of importance, because opening the block valve is necessary to permit the PORV to be used for manual control of reactor pressure. If the block valve is closed to isolate an otherwise inoperable PORV, the maximum Completion Time to restore the PORV and open the block valve is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, which is well within the allowable limits (25%) to extend the block valve Frequency of 92 days. Furthermore, these test requirements would be completed by the reopening of a recently closed block valve upon restoration of the PORV to OPERABLE status (i.e., completion of the Required Actions fulfills the SR).
This SR is modified by two Notes. Note I modifies this SR by stating that it is not required to be met with the block valve closed, in accordance with the Required Action of this LCO. Note 2 modifies this SR to allow entry Into and operation in MODE 3 prior to performing the SR. This allows the test to be performed in MODE 3 under operating temperature conditions, prior to entering MODE I or
- 2. A temporary third note has been added to suspend SR 3.4.11.1 for Unit Two PORV block valve Q2B31 MOV8000B for the remainder of operating cycle 16.
(continued)
Farley Units 1 and 2 B 3.4.11-7 Revision 2 0
Pressurizer PORVs B 3.4.11 BASES SURVEILLANCE SR 3.4.11.2 REQUIREMENTS (continued) SR 3.4.11.2 requires a complete cycle of each PORV in MODE 3 or
- 4. The PORVs are stroke tested during MODES 3 or 4 with the associated block valves closed in order to limit the uncertainty introduced by testing the PORVs at lesser system temperatures than expected during actual operating conditions. Operating a PORV through one complete cycle ensures that the PORV can be manually actuated for mitigation of an SGTR. The Frequency of 18 months is based on a typical refueling cycle and industry accepted practice.
The Note modifies this SR to allow entry into and operation in MODE 3 prior to performing the SR. This allows the test to be performed In MODE 3 under operating temperature conditions, prior to entering MODE 1 or 2.
SR 3.4.11.3 SR 3.4.11.3 requires a complete cycle of each PORV using the backup PORV control system. This surveillance verifies the capability to operate the PORVs using the backup air and nitrogen supply systems. Additionally, this surveillance ensures the correct function of the associated air and nitrogen supply system valves.
The 18-month Frequency is based on a typical refueling cycle and industry accepted practice for Surveillances requiring the PORVs to be cycled.
SR 3.4.11.4 SR 3.4.11.4 applies only to Unit 2 for the remainder of cycle 16 for PORV block valve Q2B31MOV8000B. It requires that power to the PORV block valve is checked to be available at least every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
This surveillance provides additional assurance that the PORV block valve could be stroked f demanded while SR 3.4.11.1 is suspended.
REFERENCES 1. Regulatory Guide 1.32, February 1977.
- 2. FSAR Sections 5.5 and 15.2.
- 3. ASME, Boiler and Pressure Vessel Code, Section Xl.
Farley Units 1 and 2 B 3.4.1 1-8 Revision 20