|
---|
Category:Letter
MONTHYEARIR 05000266/20244022024-11-14014 November 2024 Security Baseline Inspection Report 05000266/2024402 and 05000301/2024402 IR 05000266/20240032024-11-0505 November 2024 Integrated Inspection Report 05000266/2024003 and 05000301/2024003 ML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 2024-09-09
[Table view] Category:Meeting Summary
MONTHYEARML24248A0152024-09-0505 September 2024 Summary of August 28, 2024, Public Pre-Application Meeting with NextEra Energy Point Beach, LLC Regarding Assessing Seismic Risk ML24227A5082024-08-15015 August 2024 Summary of the July 15, 2024, Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML23199A0262023-07-18018 July 2023 Summary of Public Outreach to Discuss the NRC 2022 End of Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML23118A1762023-05-0404 May 2023 – Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22181B1182022-06-30030 June 2022 Summary of the June 23, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML22019A2792022-01-20020 January 2022 Summary of Public Webinar with NextEra Energy Point Beach, LLC Regarding Future License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant ML22004A0772022-01-0606 January 2022 Summaries of December 8, 2021 Draft Supplemental Environmental Impact Statement for Subsequent License Renewal Application Public Meetings ML21295A2532021-10-26026 October 2021 Summary of Public Webinar with NextEra Energy Point Beach,Llc Regarding Proposed Future LAR to Adopt TSTF-505, Rev.2, Provide Risk Informed Extended Completion Times-RITSTF Initiative 4B, at Point Beach Plant, Units 1&2 (L-2021-LRM-0086) ML21288A1222021-10-20020 October 2021 SLRA Summary of August 5, 2021, Public Meeting on Proposed Aging Management Activities of Irradiated Concrete and Steel Reactor Vessel Supports ML21214A1512021-08-27027 August 2021 SLRA June 3, 2021, Public Meeting - Proposed Aging Management Activities of Irradiated Concrete and Steel Reactor Vessel Supports ML21214A1652021-08-27027 August 2021 SLRA June 30, 2021, Public Meeting - Proposed Aging Management of Reactor Vessel Internals ML21161A2992021-06-17017 June 2021 Summary of May 18, 2021 Public Webinar with Nextera Energy Point Beach, LLC Regarding Path Forward for Generic Letter 2004-02 Closure ML21166A2192021-06-15015 June 2021 Summary of June 10, 2021, Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Point Beach Nuclear Plant ML21148A1162021-06-0101 June 2021 SLRA Public Meeting Discussion Questions 6-3-21 ML21075A3422021-03-17017 March 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Memo ML21075A3432021-02-17017 February 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Summary ML20253A1382020-09-11011 September 2020 8/13/2020 Summary of Public Meeting with NextEra Energy Point Beach, LLC Regarding Proposed License Amendment Request for Point Beach Nuclear Plant, Unit 1, Containment Building Truss License Condition Change Due to COVID-19 ML20233A7902020-08-20020 August 2020 Summary of the July 30, 2020, Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Duane Arnold Energy Center and the Point Beach Nuclear Plant ML19344A0162019-12-12012 December 2019 Summary of Pre-Application Public Teleconference with Nextera Energy Point Beach, LLC, for Point Beach Nuclear Plant, Units 1 and 2 ML19246A6242019-09-10010 September 2019 Summary of August 14, 2019, Pre-Application Public Teleconference with NextEra Energy Point Beach, LLC, for Point Beach Nuclear Plant, Unit 2 ML19179A0662019-07-17017 July 2019 Summary of Closed Meeting with Nextera Energy, LLC, to Discuss Security-Related Information for Point Beach Nuclear Plant, Unit 1 and 2, and Duane Arnold Energy Center ML19095B7772019-04-0505 April 2019 Summary of Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML18220B0192018-08-13013 August 2018 7/12/2018 Summary of Meeting with NextEra Energy Point Beach, Llc. to Discuss Supplemental Response to the RAI for Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit 1 and 2 (CAC Nos. MF9532 & MF9533; ... ML18179A4032018-06-29029 June 2018 Public Meeting Discussion Points ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML18141A8452018-05-29029 May 2018 Summary of May 1, 2018 Meeting with NextEra Energy Point Beach, LLC, to Discuss License Amendment Request for High Winds Probabilistic Risk Assessment for Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML18121A3142018-05-0101 May 2018 Summary of the April 10, 2018 Public Outreach/Open House for the NRC to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Point Beach Plant, Units 1 and 2 ML17346A9122017-12-22022 December 2017 Summary of November 14, 2017 Public Teleconference with NextEra Energy Point Beach, LLC, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-L ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML17216A1732017-09-0707 September 2017 Notice of Meeting with Florida Power & Light Company and NextEra Energy to Discuss Closing Out Generic Safety Issue-191 and Generic Letter 2004-02 ML17202U7272017-07-19019 July 2017 Summary of July 11, 2017, Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML16305A3882016-11-0808 November 2016 Summary of October 18, 2016 Meeting with Nextera Energy Point Beach, Llc, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (TAC Nos. MF8403 and MF8404) ML16160A1742016-06-0707 June 2016 Summary of Public Meeting with Nextera Energy Point Beach, LLC to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant Units 1 and 2 ML15341A0182015-12-16016 December 2015 Summary of Closed Pre-Application Teleconference with Nextera Energy Point Beach Regarding Steam Generators H* License Amendment Request ML15217A3312015-08-26026 August 2015 July 28, 2015, Summary of Ublic Meeting with NextEra Energy Point Beach, LLC, to Discuss a Proposed Licensing Basis Change for the Turbine-Driven Auxiliary Feedwater Pumps at the Point Beach Nuclear Plant, Units 1 and 2 ML15215A0502015-08-0505 August 2015 Summary of Public Meeting with NextEra Energy Point Beach, LLC, to Discuss Proposed Changes to Containment Dome Truss Design Bases Code for Point Beach Nuclear Plant, Units 1 and 2 ML15121A0572015-05-15015 May 2015 June 9 - 12, 2014 Summary of Audit at Point Beach Nuclear Plant, Unit Nos. 1 and 2, Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805 ML15113B3862015-04-23023 April 2015 April 20, 2015 Summary of Public Outreach/Open House to Discuss the NRC 2014 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant ML15106A7122015-04-23023 April 2015 Summary of April 6, 2015, Meeting with NextEra Energy Point Beach, LLC, to Discuss License Amendment Request to Transition to NFPA 805 ML14114A1002014-04-23023 April 2014 Summary of Public Meeting to Discuss 2013 Annual Assessment Results for Point Beach Nuclear Plant ML13192A1432013-07-10010 July 2013 6/26/2013 - Summary of Open House to Discuss the 2012 Point Beach Nuclear Plant End-Of-Cycle Performance Assessment ML1212805092012-06-18018 June 2012 May 1, 2012 - Summary of Teleconference with Performance Contracting, Inc., Regarding Large Flume Testing for Point Beach Nuclear Plant ML11173A2332011-06-22022 June 2011 Summary of Public Meeting with NextEra Energy Point Beach, LLC to Discuss the Point Beach Nuclear Plant End-of-Cycle Performance Assessment for 2010 ML1108208272011-04-21021 April 2011 Summary of Pre-application Meeting with NextEra Energy, Inc., and Florida Power & Light Company, on Turkey Point, Units 3 and 4, St. Lucie, Units 1 & 2, Point Beach, Units 1 & 2, Duane Arnold Transition to NFPA-805 ML1014000432010-05-20020 May 2010 Summary of Public Meeting with FPL Energy Point Beach, LLC to Discuss Progress on the Nuclear Excellence Model and Updates on Operational Excellence, Generation Reliability, and Organizational Effectiveness at Point Beach ML1012502352010-05-0505 May 2010 Summary of the April 22, 2010, Public Meeting to Discuss the 2009 Point Beach End-of-Cycle Performance Assessment ML0924305212009-08-31031 August 2009 July 29, 2009,Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to Substantive Cross Cutting Issues and the Results of an Independent Assessment of Corrective Actions for Recent Nuclear Safety Culture Surveys ML0914001932009-05-20020 May 2009 Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to a Nuclear Safety Culture Survey in 2008 - Point Beach Nuclear Plant ML0832308202008-11-20020 November 2008 Teleconference Summary Regarding the 2008 Steam Generator Tube Inspection Results 2024-09-05
[Table view] |
Text
June 16, 2003 EA-03-057 Mr. John Paul Cowan Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016
SUBJECT:
REGULATORY CONFERENCE TO DISCUSS PRELIMINARY RED INSPECTION FINDING AT THE POINT BEACH NUCLEAR PLANT (INSPECTION REPORT 50-266/02-15(DRP); 50-301/02-15(DRP))
Dear Mr. Cowan:
This letter refers to the Regulatory Conference held on June 6, 2003, at the U.S. Nuclear Regulatory Commission Region III office in Lisle, Illinois. The purpose of the Regulatory Conference was for the Nuclear Management Company, LLC (NMC) to provide its perspective on the significance of the preliminary Red inspection finding at the Point Beach Nuclear Plant related to the potential for a common mode failure of the auxiliary feedwater pumps from the plugging by debris of orifices in the pump recirculation lines. In addition, the Regulatory Conference was an opportunity for NMC to provide any revised or new information associated with the original risk analysis, any other information related to the finding, and whether NMC agreed with the apparent violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, that was identified during the inspection. The preliminary Red inspection finding and the apparent violation are discussed in Inspection Report 50-266/02-15(DRP);
50-301/02-15(DRP), issued on April 2, 2003.
At the Regulatory Conference, NMC presented an overview of the auxiliary feedwater system orifice issue, the results of the associated root cause evaluation, related corrective actions, and the methodology and status of the NMC/Point Beach significance determination process.
During the meeting, NRC and NMC staff held extensive discussions regarding specific technical issues related to NMCs analysis. NMC stated that the analysis of the risk from internal events associated with the orifice plugging issue would be completed in about two weeks and that the analysis of the risk from fire would be completed in August 2003. NMC committed to submit the results of those two analyses to the NRC when they are completed. NMC also stated that it agreed with the characterization of the apparent violation. If our understanding of the expected completion of the analyses and NMCs position on the apparent violation is incorrect, please notify us promptly. The results of our final significance determination and enforcement deliberations will be provided to NMC after completion of our review of the results of NMCs analyses. The handout provided by NMC at the Regulatory Conference and a listing of principal NMC and NRC attendees are attached as Enclosures 1 and 2 to this letter.
J. Cowan During the Regulatory Conference, the NRC staff questioned the installation date for the A motor driven auxiliary feedwater pump orifice. Specifically, the installation date presented by your staff was not consistent with the date documented in the related NRC inspection report.
Your staff subsequently reviewed this discrepancy and corrected the error as described in the letter from A. J. Cayia dated June 10, 2003, which is attached as Enclosure 3.
In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter, its enclosures, and your response will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions regarding this letter, please contact Mr. Anton Vegel at (630) 829-9620.
Sincerely,
/RA by Steven A. Reynolds Acting for/
Geoff E. Grant, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosures:
- 1) NMC Handout
- 2) List of Principal Attendees
- 3) Letter from A. J. Cayia to NRC dated June 10, 2003 See Attached Distribution DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031681086.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski/trn* KLambert for AVegel* SReynolds for BClayton* GGrant DATE 6/13/03 6/13/03 6/13/03 6/16/03 OFFICIAL RECORD COPY
J. Cowan cc: A. Cayia, Site Vice President R. Grigg, President and Chief Operating Officer, WEPCo Licensing Manager D. Weaver, Nuclear Asset Manager Joseph Jensen, Plant Manager Gordon P. Arent, Manager, Regulatory Affairs Jonathan Rogoff, Esquire, General Counsel Mano K. Nazar, Senior Vice President J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer D. Markwardt, Manitowoc County Board Chairman N. Crowley, Director, Manitowoc Emergency Management G. Novickis, Chairman, Kewaunee County Board The Honorable Darin A. Jeanquart G. Buckley, Two Rivers City Manager L. Hucek, Director, Kewaunee Emergency Management C. Meyer, President, Village of Mishicot K. Duveneck, Two Creeks Town Chairman INPO
J. Cowan ADAMS Distribution:
WDR DFT DWS H. Nieh (HKN), OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Point Beach DRPIII DRSIII PLB1 JRK1
Enclosure 2 REGULATORY CONFERENCE PRINCIPAL ATTENDEES June 6, 2003 NMC, Point Beach, Wisconsin Electric John Paul Cowan Chief Nuclear Office/Executive Vice-President, NMC Mano Nazar Senior Vice-President, NMC Mark Reddemann Vice-President, Engineering, NMC Edward Weinkam Director, Regulatory Services, NMC Fred Cayia Site Vice-President, Point Beach Gordon Arent Regulatory Affairs Manager, Point Beach Jim Brander I&C General Supervisor, Point Beach Maureen Brown Public Affairs Director, NMC Dan Fadel Director of Engineering, Point Beach James Masterlark PRA Engineer John Olvera PRA Engineer Terry Sullivan Assistant to the President, We Energies Steve Mays Manager, Risk Technology (Contractor)
NRC Jim Dyer Regional Administrator Jim Caldwell Deputy Regional Administrator Geoff Grant Director, Division of Reactor Projects Brent Clayton Enforcement and Investigation Coordination Staff Team Leader Anton Vegel Chief, Branch 7, Division of Reactor Projects Ken OBrien Chief, Fuel Cycle Branch Ken Riemer Chief, Plant Support Branch Ken Lambert Enforcement Specialist Jennifer Dixon-Herrity Senior Enforcement Specialist, Office of Enforcement Paul Krohn Senior Resident Inspector Sonia Burgess Senior Reactor Analyst Russell Gibbs Senior Reactor Analyst Pat Louden Chief, Branch 5, Division of Reactor Projects Jan Strasma Public Affairs Officer Viktoria Mitlyng Public Affairs Officer Mike Kunowski Project Engineer