7.5 Dose Projections and Field Monitoring Team Survey Maps and Data
Edwin I. Hatch Nuclear Plant Emergency Preparedness 2003 Exercise 04 7.5 Dose Projections and Field Monitoring Team Survey Maps and Data The attached dose projection information provides the MIDAS dose assessment program outputs from each 15-minute projection period. It consists of a plume map which is a screen print of the Total Effective Dose Equivalent (TEDE) rate projection used for procedural radiological release determination and some Emergency Action Level (EAL) parameters. The second page is the MIDAS printout which is a 'copy' of the Emergency Notification Network (ENN) form containing the 4-hour dose projections used for EAL determination and Protective Action Recommendations (PARs).
The attached plume maps provide radiological data in the simulated effluent plume.
Maps are provided covering the time of the release in 15-minute intervals. The data provided approximates values that would be obtained by an elevated release model.
For realism, controllers will randomly vary the data among the range indicated by the contour legend.
Data provided by the controllers should average out to the value of the contour in question.
All field monitor readings for times prior to the start of the release will be "AS READ".
Data are provided in the following categories:
Field Monitor Gamma Dose rates (closed window)
Field Monitor Gamma plus Beta dose rates (open window)
Field Monitor Thyroid dose rates Ground contamination (I -131)
The following information is provided for use by controllers:
Defaults for airbome radioactivity samples:
Sample time 10 minutes Sample flow 14.5 LPM 7.5-1
.30 AM Dose Proj ection Result
E M E R
.[A] THIS IS A DRILL
- 2. SITE: PLANT HATCH G E N C Y N O T I F I C A T I O N MESSAGE NUMBER
[B] ACTUAL EMERGENCY
[C] INITIAL- [D] FOLLOW-UP*
UNIT:
REPORTED BY:
- 3. TRANSMITTAL TIME/DATE:
J_
(Eastern) mm dd yy
- 4. AUTHENTICATION (If Required):
- 5. EMERGENCY CLASSIFICATION:
[A] NOTIFICATION OF UNUSUAL
[C] SITE AREA EMERGENCY
- 6. [A] Emergency Declaration At:
- 7. EMERGENCY DESCRIPTION/REMARKS:
- 8. PLANT CONDITION:
- 9. REACTOR STATUS:
CONFIRMATION PHONE NUMBERS:
(Number)
(Codeword)
EVENTS (B] ALERT
[D] GENERAL EMERGENCY
[B] Termination At: TIME/DATE:
(If B,go to Item 16.) (Eastern) mm dd yy
[A] IMPROVING
[B] STABLE
[C] DEGRADING
[A] SHUTDOWN TIME/DATE: __
//
[B]
-%POWER (Eastern) mm dd yy
- 10. EMERGENCY RELEASE(S):
[A] NONE(Go to Item 14.)
[B] POTENTIAL(Go to Item 14.)
[C] IS OCCURRING
[D] HAS OCCURRED
- 11. TYPE OF RELEASE:
[ ] ELEVATED
[ ] GROUND LEVEL
[A]
AIRBORNE:
Started:
Stopped: _____
Time (Eastern) date Time (Eastern) date
[B]
LIQUID:
Started:
Stopped:
Time(Eastern) date Time(Eastern) date
- 12. RELEASE MAGNITUDE:
[X]
CURIES PER SEC.
[ ] CURIES NORMAL OPERATING LIMITS:
[ ] BELOW
[ ] ABOVE
[A]
NOBLE GASES 8.4E-04
[B]
IODINES 8.5E-06
[C]
PARTICULATES O.OE+00
[D]
OTHER
- 13. ESTIMATE OF PROJECTED OFFSITE DOSE:
[ ] NEW
[ ] UNCHANGED TEDE THYROID CDE (mrem)
(mrem)
SITE BOUNDARY 1.3E-02 1.4E-01 2 MILES 5.7E-03 5.2E-02 5 MILES 1.8E-03 1.7E-02 10 MILES 4.8E-04 5.lE-03
- 14. METEOROLOGICAL DATA:
(A]
WIND DIRECTION(from) 70
[]
(C]
STABILITY CLASS D
[I
- 15. RECOMMENDED PROTECTIVE ACTIONS:
[A]
NO RECOMMENDED PROTECTIVE ACTIONS (B]
EVACUATE_
(C]
SHELTER-IN-PLACE_
(D] OTHER ACCIDENT TYPE:
PROJECTION TIME:
07:30 (EASTERN)
ESTIMATED DURATION:
4.00 HRS 3]
SPEED(mph)
)] PRECIPITATION(type) 6.0 NO RAIN 1(
LPPROVED BY:
(Name)
(Title)
- If Items 8-14 have not changed, only Items 1-7 and 15-16 are required to be completed.
- Information may not be available on initial notifications.
TIME/DATE:
(EASTERN) mm dd yy 2
)
)
l1n 11 5'
11 1.
'l 1 1 11 *
'M "w~~~~~~~~~~~p U
^1uU 3i
^
s 19l;s; L
a a
-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
a
- a a
a I
E E~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
p"tUl{
al-^sX;*
U
~
~~
~ ~~~.
- S C
S ~ ~
~
~
~
9 l
l i..3X l
u
! u, ua; S^
'I I
s
'I
^
L _1 U
5 U
l fi '1 91 31' 3 ;Q i9^ '1':!' L. 3icoE
)
900A Dos Proj ection~~
Result
E M E R
_>[A] THIS IS A DRILL
- 2. SITE: PLANT HATCH G E N C Y N O T I F I C A T I O N MESSAGE NUMBER
[B] ACTUAL EMERGENCY
[C] INITIAL
[D] FOLLOW-UP*
UNIT:
REPORTED BY:
- 3. TRANSMITTAL TIME/DATE:
J (Eastern) mm dd yy
- 4. AUTHENTICATION (If Required):
- 5. EMERGENCY CLASSIFICATION:
[A] NOTIFICATION OF UNUSUAL
[C] SITE AREA EMERGENCY
- 6. [A] Emergency Declaration At:
- 7. EMERGENCY DESCRIPTION/REMARKS:
- 8. PLANT CONDITION:
- 9. REACTOR STATUS:
CONFIRMATION PHONE NUMBERS:
(Number)
(Codeword)
EVENTS
[B] ALERT
[D] GENERAL EMERGENCY
[B] Termination At: TIME/DATE:
(If B,go to Item 16.) (Eastern) mm dd yy
[A] IMPROVING
[B] STABLE
[C] DEGRADING
[A] SHUTDOWN TIME/DATE:
//
[B]
(Eastern) mm dd yy
%POWER
- 10. EMERGENCY RELEASE(S):
[A] NONE(Go to Item 14.)
[B] POTENTIAL(Go to Item 14.)
[C] IS OCCURRING
[D] HAS OCCURRED
- 11. TYPE OF RELEASE:
[ ] ELEVATED
[ ] GROUND LEVEL
[A]
AIRBORNE:
Started:
Stopped:
Time(Eastern) date Time(Eastern) date
[B]
LIQUID:
Started:
Stopped:
Time(Eastern) date Time(Eastern) date
- 12. RELEASE MAGNITUDE:
[X]
CURIES PER SEC.
[ ] CURIES NORMAL OPERATING LIMITS:
[ ] BELOW
[ ] ABOVE
[A]
NOBLE GASES 8.3E-04
[B]
IODINES 2.2E-05
[C]
PARTICULATES o.OE+00
[D]
OTHER
- 13. ESTIMATE OF PROJECTED OFFSITE DOSE:
[ ] NEW
[ ] UNCHANGED TEDE THYROID CDE (mrem)
(mrem)
SITE BOUNDARY 1.4E-02 1.7E-01 2 MILES 5.3E-03 5.4E-02 5 MILES 1.7E-03 1.9E-02 10 MILES 5.OE-04 6.lE-03
- 14. METEOROLOGICAL DATA:
[A]
WIND DIRECTION(from) 74
[1
[C]
STABILITY CLASS D
[I
- 15. RECOMMENDED PROTECTIVE ACTIONS:
[A]
NO RECOMMENDED PROTECTIVE ACTIONS
[B]
EVACUATE_
[C]
SHELTER-IN-PLACE
[D]
OTHER ACCIDENT TYPE:
PROJECTION TIME:
09:00 (EASTERN)
ESTIMATED DURATION:
4.00 HRS B]
SPEED(mph)
D]
PRECIPITATION(type) 2 6.0 NO RAIN 1_ APPROVED BY:
TIME/D (Name)
(Title)
- If Items 8-14 have not changed, only Items 1-7 and 15-16 are required to be completed.
- Information may not be available on initial notifications.
ATE:
(EASTERN) mm dd yy
)
.)
6-
-Z
_i 2
sID 55 S
5 5
k 55 i
i s1nU 3rts :i! 3s; m. >
S 1E s!.G 1a!
a ^u
^; C L. }t;
^ fi
]
In]Lll 11:
11n 1
q I
R i
I k
111:
W:
1 I
1l iIl;.it 1All 1a;#
d%&.
J t
.ilil d
ID ],11 a 1l I;L i 3
9 z
z a S.
N g
S 5 t iz
- S i '1 3^@'
^ JL'1t ! > i^__10: 3G0 W
W a1l s
fi 1n !,
11 R
a, 11 a
s I
l 11 l l
. s I
1} zE 5_"RS"_t]s3sZil@"s9D l
u l RlSa!
- s1:rf _11311f iiI:gIt.I'.w
- C "ex"l:X"rw:g:&M=t.xs
_E t!
s l
__w__
L9 e Dli;__
Pr
_S r
I
_w
.,l11
_.SS 11 l
S
__ll a
g 1lll- -
lil L
]
4 4 L, u
. l l
C
)
9:15 AM Dose Proj ection Result
E M E R G E N C Y N O T I F I C A T I O N MESSAGE NUMBER (jA]
THIS IS A DRILL
[B] ACTUAL EMERGENCY
[C] INITIAL
[D] FOLLOW-UP*
- 2. SITE: PLANT HATCH UNIT:
REPORTED BY:
- 3. TRANSMITTAL TIME/DATE:
J___
(Eastern) mm dd yy
- 4. AUTHENTICATION (If Required):
- 5. EMERGENCY CLASSIFICATION:
[A] NOTIFICATION OF UNUSUAL (C] SITE AREA EMERGENCY
- 6. [A] Emergency Declaration At:
- 7. EMERGENCY DESCRIPTION/REMARKS:
- 8. PLANT CONDITION:
- 9. REACTOR STATUS:
CONFIRMATION PHONE NUMBERS:
(Number)
(Codeword)
EVENTS
[B] ALERT
[D] GENERAL EMERGENCY
[B) Termination At: TIME/DATE:
(If B,go to Item 16.) (Eastern) mm dd yy
[A] IMPROVING
[B] STABLE
[C] DEGRADING
[A] SHUTDOWN TIME/DATE: ___
_JJ
[B]
(Eastern) mm dd yy
- 10. EMERGENCY RELEASE(S):
(A] NONE(Go to Item 14.)
[B] POTENr
[C] IS OCCURRING
[D] HAS 0
- 11. TYPE OF RELEASE:
[ ]
ELEVATED
[A]
AIRBORNE:
Started:
JJ Time(Eastern) date
[B]
LIQUID:
Started:
J_
Time(Eastern) date
- 12. RELEASE MAGNITUDE:
[X]
CURIES NORMAL OPERATING LIMITS:
[ ] BELOW
[A]
NOBLE GASES 9.1E-04
[C]
PARTICULATES 0.OE+00
- 13. ESTIMATE OF PROJECTED OFFSITE DOSE:
] NEW
[ ] UNCHANGED TEDE THYROID CDE (mrem)
(mrem)
SITE BOUNDARY 5.OE-03 5.9E-04 2 MILES 2.8E-03 7.4E-03 5 MILES 1.3E-03 7.5E-03 10 MILES 4.6E-04 4.4E-03
- 14. METEOROLOGICAL DATA:
[A]
WIND DIRECTION(from) 75
[I
[C]
STABILITY CLASS D
[I
- 15. RECOMMENDED PROTECTIVE ACTIONS:
[A]
NO RECOMMENDED PROTECTIVE ACTIONS
[B]
EVACUATE
[C]
SHELTER-IN-PLACE_
[D]
OTHER rIAL(Go to Item 14.)
XCURRED
]
GROUND LEVEL PER SEC.
rBl
%POWER Stopped:
Time(Eastern) date Stopped:
Time(Eastern) date
[
CURIES
[ ] ABOVE IODINES 1.3E-07
[D]
OTHER ACCIDENT TYPE:
PROJECTION TIME:
09:15 (EASTERN)
ESTIMATED DURATION:
4.00 HRS B]
SPEED(mph)
D]
PRECIPITATION(type) 1 5.0 NO RAIN 1y,APPROVED BY:
TIME/D (Name)
(Title)
- If Items 8-14 have not changed, only Items 1-7 and 15-16 are required to be completed. -
- Information may not be available on initial notifications.
ATE:
(EASTERN) mm dd yy
)1 B
9 9 S B 9 B9
p S
S S
- S r..
- 9.
S r
r Pr S
S S
- S C03 L