ML031631126

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Nuclear Management Company, LLC for Licensee to Describe the Process Used and the Results of Its self-assessment of the Operation, Procedures, and Processes of the Point Beach Nuclear Plant in Preparation for the Nrc
ML031631126
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/12/2003
From: Anton Vegel
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML031631126 (3)


Text

June 12, 2003 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Nuclear Management Company, LLC Name of Facility: Point Beach Nuclear Plant, Units 1 & 2 Docket Nos.: 50-266; 50-301 Date and Time of Meeting: 7:00 p.m. (CDT), Tuesday, June 24, 2003 Location of Meeting: Holiday Inn 4601 Calumet Avenue Manitowoc, Wisconsin Purpose of Meeting: The purpose of the meeting is for the licensee to describe the process used and the results of its self-assessment of the operation, procedures, and processes of the Point Beach Nuclear Plant in preparation for the NRCs conduct of Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees: Geoff Grant, Director, Division of Reactor Projects Pat Louden, Chief, Branch 5, Division of Reactor Projects Anton Vegel, Chief, Branch 7, Division of Reactor Projects Paul Krohn, Senior Resident Inspector, Point Beach Others as designated

Notice of Significant Licensee Meeting Licensee Attendees: Alfred Cayia, Site Vice-President John Cowan, Chief Nuclear Officer Joseph Jensen, Plant Manager Others as designated NOTE: Attendance at this meeting by NRC personnel should be made known to Mike Kunowski via e-mail (MAK3) or by telephone ((630) 829-9618) by COB on Friday, June 20, 2003.

Approved by: __/RA/____________________

Anton Vegel, Chief Branch 7 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

F. Congel (FJC), Director, Office of Enforcement D. Dambly (DCD), Assistant General Counsel for Material Litigation and Enforcement, OGC B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski (JAZ), Director, Division of Licensing Project Management, NRR M. Banerjee (MXB), NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Roland (WHR), Project Directorate, Division of Licensing Project Management, NRR Deirdre Spaulding, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. Grant (GEG), Director, Division of Reactor Projects, RIII S. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Point Beach DRS Branch Chiefs (RNG, DEH, RDL, KRR)

B. Clayton (HBC), Enforcement/Investigations Officer, RIII R. Lickus (RML2), State Liaison Officer, RIII PMNS RIII Public Affairs (VTM, RJS2)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA