Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 z
INDIANA MICHIGAN POWER May 30, 2003 AEP:NRC:2073-08 10 CFR 2.202 10 CFR 50.4 Docket Nos. 50-315 50-316 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001
SUBJECT:
REFERENCES:
Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Response to Nuclear Regulatory Commission Order Regarding Compliance with Revised Design Basis Threat (DBT) for Operating Power Reactors U. S. Nuclear Regulatory Commission Order EA-03-038, "Issuance of Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors,"
dated April 29, 2003
Dear Sir or Madam:
Section IV of the Nuclear Regulatory Commission's (NRC's) April 29, 2003, Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors (EA-03-086) ("Order") states that, in accordance with 10 CFR 2.202, a licensee must submit an answer to the Order and may request a hearing on the Order within 35 days of the date of the Order.
This letter constitutes the answer (pursuant to 10 CFR 2.202 and Section IV) and response (pursuant to 10 CFR 50.4 and Sections III A. 1, B. 1 and B.2) of Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, Facility Operating Licenses DPR-58 and DPR-74, to the Order.
Section II of the Order states that "[i]n order to provide assurance that licensees are implementing prudent measures to protect against the revised DBT, all Ak6
U. S. Nuclear Regulatory Commission AEP:NRC:2073-08 Page 2 licenses identified in Attachment 1 to this Order shall be modified to require that the physical security plans, safeguards contingency plans, and the guard training and qualification plans required by 10 C.F.R. §§ 50.34(c), 50.34(d), and 73.55(b)(4)(ii) be revised to provide protection against this revised DBT."
I&M consents to the Order, and does not request a hearing. I&M notes the request for clarification of five DBT issues provided in the safeguards attachment to the letter from Mr. Joseph Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Nils Diaz dated May 16, 2003. We encourage the NRC to respond to this request as soon as possible, as the NRC's clarifications may affect the manner of I&M's compliance with the Order.
Because the NRC has used force-on-force testing as a standard by which compliance with the DBT was evaluated, I&M also requests that the NRC provide a clear definition of the objectives and criteria for force-on-force exercises so that, if required, appropriate revisions can be made to I&M's safeguards contingency plans, security plans, and security officer training and qualification plans.
Specifically, I&M needs a clear explanation of the purpose of the force-on-force exercise (e.g., is the purpose of force-on-force exercises for security officer training, or to evaluate licensee compliance with the Design Basis Threat?).
Similarly, the success criteria for the force-on-force exercise needs to be established (e.g., is the criterion prevention of a large offsite release, which would be consistent with the basis for risk-informing NRC regulations, or some other criteria?).
Finally, if a force-on-force exercise is going to be used as a perfornance test of the licensee's ability to protect against the DBT, a clear definition of adversary rules of engagement and adversary tactics is needed to provide appropriate predictability and stability in the regulatory program. Absent these clarifications, the standard by which licensee perfornance will be measured will continue to be a constantly moving target which is counter to the Commission's Principles of Good Regulation.
To enable I&M to meet the compliance dates specified in the Order, the requested clarifications are needed as soon as possible.
If the clarifications cannot be provided by October 1, 2003, we respectfully request that the Director, Nuclear Reactor Regulation, extend the dates for submitting the revision to the security plan and safeguards contingency plan and for full implementation of the Order on a day-for-day basis until such clarifications are provided.
U. S. Nuclear Regulatory Commission AEP:NRC:2073-08 Page 3 I&M also confirns its understanding that the NRC intends to exercise enforcement discretion to accommodate issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of this Order. We further understand that the NRC will exercise enforcement discretion for the period necessary to resolve such issues and to integrate the requirements of this Order with the orders issued February 25, 2002, as well as with other pertinent regulatory requirements, and our safeguards contingency plans, security plans and security officer training and qualification plans.
Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.
Sincerely, A. C. Bakken, III Senior Vice President, Nuclear Operations HLE/jen
Enclosure:
Notarized Affirmation
Attachment:
Summary of Regulatory Commitments c:
H. K Chemoff-NRC Washington DC K. D. Curry - AEP Ft. Wayne J. E. Dyer - NRC Region I J. T. King - MPSC MDEQ - DW & RPD NRC Resident Inspector J. F. Stang, Jr. - NRC Washington DC
Attachment to AEP:NRC:2073-08 AFFIRMATION I, A. Christopher Bakken, I, being duly sworn, state that I am Senior Vice President, Nuclear Operations, of American Electric Power Service Corporation and Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
American Electric Power Service A. C. Bakken, III Senior Vice President, Nuclear Operations SWORN TO AND SUBSCRIBED BEFORE ME THiS Li 0 DAY OF 2003 ge / w to O
Notary ublc My Comnission Expires M-2tr-07 BRIAN A. McINTYRE Notary Public, Berrien County, MI My Commission Expires Apr. 25, 2007
Attachment to AEP:NRC:2073-08 REGULATORY COMMITMENTS The following table identifies those actions committed to by Indiana Michigan Power Company (I&M) in this document. Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
Commitment Date I&M will comply with the Order.
October 29, 2004