ML031570352

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendments 213 and 188 Intermittent Opening of Isolated Flow Paths and Tip Isolation
ML031570352
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/05/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB6665, TAC MB6666
Download: ML031570352 (4)


Text

Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.6.1-1.

ACTIONS NOTES-------

1. Penetration flow paths may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each channel.

CONDITION A.

One or more required channels inoperable.

REQUIRED ACTION A.1 Place channel in trip.

COMPLETION 1-12 hours for Functions 2.a, 2.d, 6.b, 7.a, and 7.b I

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other thar Functions 2.a, 2.d, 6.b, 7.a, and l 7.b I

B.

One or more automatic B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Functions with isolation capability.

capability not maintained.

(continued)

SUSQUEHANNA-UNIT I T S / 3.3-52 Amendment i38, 213

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 6 of 6)

Primary Containment Isolafion Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VAWE

6.

Shutdown Cooling System Isolation

a.

Reactor Steam Dome 1,2,3 1

F SR 3.3.6.1.2 s 108 psig Pressure -

High SR 3.3.6.1.3 SR 3.3.6.1.5

b.

Reactor Vessel Water 3,4,5 2(c)

J SR 3.3.6.1.1 211.5 Inches Level - Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5

c.

Manual Initiation 3,4,5 1

G SR 3.3.6.1.5 NA

7.

Traversing Incore Probe IsolaUon

a.

Reactor Vessel Water 1,2.3 2

G SR 3.3.6.1.1

Ž11.5 Inches Level -

Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5

b.

Drywell Pressure -

1,2,3 2

G SR 3.3.6.1.2 s 1.88 psig High SR 3.3.6.1.4 SR 3.3.6.1.5 (c)

Only one trip system required In MODES 4 and 5 when RHR Shutdown Cooling System Integrity maintained.

SUSQUEHANNA - UNIT 1 TS / 3.3-62 Amendment 148, 213

Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.6.1-1.

ACTIONS


NOTES---------------

1. Penetration flow paths may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable.

Functions 2.a, 2.d, 6.b, 7.a, and 7.b AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.a, 2.d, 6.b, 7.a, and 7.b B.

One or more automatic B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Functions with isolation capability.

capability not maintained.

(continued)

SUSQUEHANNA - UNIT 2 I

I T S / 3.3-52 Amendment 1-i, 18s

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 6 of 6)

Primary Containment Isolafion Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED FUNCTION OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

6.

Shutdown Cooling System Isolation

a.

Reactor Steam Dome 1,2,3 1

F SR 3.3.6.1.2 s108 psig Pressure - High SR 3.3.6.1.3 SR 3.3.6.1.5

b.

Reactor Vessel Water 3,4,5 2(c)

J SR 3.3.6.1.1 211.5 Inches Level - Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5

c.

Manual lnitiaton 3,4,5 1

G SR 3.3.6.1.5 NA

7.

Traversing Incore Probe Isolation

a.

Reactor Vessel Water 1,2.3 2

G SR 3.3.6.1.1 211.5 Inches Level -

Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5

b.

Drywell Pressure -

1.2,3 2

G SR 3.3.6.1.2 s 1.88 psig High SR 3.3.6.1.4 SR 3.3.6.1.5 (c)

Only one trip system required In MODES 4 and 5 when RHR Shutdown Cooling System Integrity maintained.

SUSQUEHANNA - UNIT 2 TS / 3.3-62 Amendment 15, 188