Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.6.1-1.
ACTIONS NOTES-------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION A.
One or more required channels inoperable.
REQUIRED ACTION A.1 Place channel in trip.
COMPLETION 1-12 hours for Functions 2.a, 2.d, 6.b, 7.a, and 7.b I
AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other thar Functions 2.a, 2.d, 6.b, 7.a, and l 7.b I
B.
One or more automatic B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Functions with isolation capability.
capability not maintained.
(continued)
SUSQUEHANNA-UNIT I T S / 3.3-52 Amendment i38, 213
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 6 of 6)
Primary Containment Isolafion Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VAWE
- 6.
Shutdown Cooling System Isolation
- a.
Reactor Steam Dome 1,2,3 1
F SR 3.3.6.1.2 s 108 psig Pressure -
High SR 3.3.6.1.3 SR 3.3.6.1.5
- b.
Reactor Vessel Water 3,4,5 2(c)
J SR 3.3.6.1.1 211.5 Inches Level - Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5
- c.
Manual Initiation 3,4,5 1
G SR 3.3.6.1.5 NA
- 7.
Traversing Incore Probe IsolaUon
- a.
Reactor Vessel Water 1,2.3 2
Ž11.5 Inches Level -
Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5
- b.
Drywell Pressure -
1,2,3 2
G SR 3.3.6.1.2 s 1.88 psig High SR 3.3.6.1.4 SR 3.3.6.1.5 (c)
Only one trip system required In MODES 4 and 5 when RHR Shutdown Cooling System Integrity maintained.
SUSQUEHANNA - UNIT 1 TS / 3.3-62 Amendment 148, 213
Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6.1-1.
ACTIONS
NOTES---------------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable.
Functions 2.a, 2.d, 6.b, 7.a, and 7.b AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.a, 2.d, 6.b, 7.a, and 7.b B.
One or more automatic B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Functions with isolation capability.
capability not maintained.
(continued)
SUSQUEHANNA - UNIT 2 I
I T S / 3.3-52 Amendment 1-i, 18s
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 6 of 6)
Primary Containment Isolafion Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED FUNCTION OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 6.
Shutdown Cooling System Isolation
- a.
Reactor Steam Dome 1,2,3 1
F SR 3.3.6.1.2 s108 psig Pressure - High SR 3.3.6.1.3 SR 3.3.6.1.5
- b.
Reactor Vessel Water 3,4,5 2(c)
J SR 3.3.6.1.1 211.5 Inches Level - Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5
- c.
Manual lnitiaton 3,4,5 1
G SR 3.3.6.1.5 NA
- 7.
Traversing Incore Probe Isolation
- a.
Reactor Vessel Water 1,2.3 2
G SR 3.3.6.1.1 211.5 Inches Level -
Low, Level 3 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.5
- b.
Drywell Pressure -
1.2,3 2
G SR 3.3.6.1.2 s 1.88 psig High SR 3.3.6.1.4 SR 3.3.6.1.5 (c)
Only one trip system required In MODES 4 and 5 when RHR Shutdown Cooling System Integrity maintained.
SUSQUEHANNA - UNIT 2 TS / 3.3-62 Amendment 15, 188