ML031560737
| ML031560737 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/29/2003 |
| From: | Cooper D Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| TAC MB5819 | |
| Download: ML031560737 (1) | |
Text
Committed to Nuclear Exlnce Palisades Nuclear Plant Operated by Nuclear Management Company, LLC May 29, 2003 10 CFR 50, Appendix A U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 PALISADES NUCLEAR PLANT DOCKET 50-255 LICENSE No. DPR-20 WITHDRAWAL OF REQUEST-IMPLEMENTATION OF LEAK BEFORE BREAK TECHNOLOGY (TAC NO. MB 5819)
By letter dated August 8, 2002, Nuclear Management Company, LLC (NMC) requested approval for the implementation of leak before break technology for the Palisades Plant.
Nuclear Regulatory Commission (NRC) staff has communicated to NMC that current NRC policy requires that such a request be submitted in the form of a license amendment request. Therefore, NMC is withdrawing the request made on August 8, 2002, and will evaluate reformatting the request for a potential future resubmittal.
SUMMARY
OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
/~~~~~~~~~
Doug s E. Cooper Site Vice-President, Palisades CC Regional Administrator, USNRC, Region III Project Manager, Palisades Plant, USNRC, NRR NRC Resident Inspector - Palisades Plant kI 27780 Blue Star Memorial Highway
- Covert, Ml 49043 Telephone: 616.764.2000